{"id":1356,"date":"2025-11-17T12:20:28","date_gmt":"2025-11-17T11:20:28","guid":{"rendered":"http:\/\/reussirsonprojet.fr?p=1356&#038;preview=true"},"modified":"2026-01-06T12:04:56","modified_gmt":"2026-01-06T11:04:56","slug":"7-methodo-gestion-projet","status":"publish","type":"post","link":"https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/","title":{"rendered":"7 m\u00e9thodologies de gestion de projet utiles en entreprise"},"content":{"rendered":"\n\n<div class=\"kk-star-ratings kksr-auto kksr-align-left kksr-valign-top\"\n    data-payload='{&quot;align&quot;:&quot;left&quot;,&quot;id&quot;:&quot;1356&quot;,&quot;slug&quot;:&quot;default&quot;,&quot;valign&quot;:&quot;top&quot;,&quot;ignore&quot;:&quot;&quot;,&quot;reference&quot;:&quot;auto&quot;,&quot;class&quot;:&quot;&quot;,&quot;count&quot;:&quot;45&quot;,&quot;legendonly&quot;:&quot;&quot;,&quot;readonly&quot;:&quot;&quot;,&quot;score&quot;:&quot;4.8&quot;,&quot;starsonly&quot;:&quot;&quot;,&quot;best&quot;:&quot;5&quot;,&quot;gap&quot;:&quot;0&quot;,&quot;greet&quot;:&quot;Votre avis est essentiel !&quot;,&quot;legend&quot;:&quot;4.8\\\/5 - (45 votes)&quot;,&quot;size&quot;:&quot;20&quot;,&quot;title&quot;:&quot;7 m\u00e9thodologies de gestion de projet utiles en entreprise&quot;,&quot;width&quot;:&quot;96&quot;,&quot;_legend&quot;:&quot;{score}\\\/{best} - ({count} {votes})&quot;,&quot;font_factor&quot;:&quot;1.25&quot;}'>\n            \n<div class=\"kksr-stars\">\n    \n<div class=\"kksr-stars-inactive\">\n            <div class=\"kksr-star\" data-star=\"1\" style=\"padding-right: 0px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 20px; height: 20px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"2\" style=\"padding-right: 0px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 20px; height: 20px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"3\" style=\"padding-right: 0px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 20px; height: 20px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"4\" style=\"padding-right: 0px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 20px; height: 20px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"5\" style=\"padding-right: 0px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 20px; height: 20px;\"><\/div>\n        <\/div>\n    <\/div>\n    \n<div class=\"kksr-stars-active\" style=\"width: 96px;\">\n            <div class=\"kksr-star\" style=\"padding-right: 0px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 20px; height: 20px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 0px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 20px; height: 20px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 0px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 20px; height: 20px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 0px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 20px; height: 20px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 0px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 20px; height: 20px;\"><\/div>\n        <\/div>\n    <\/div>\n<\/div>\n                \n\n<div class=\"kksr-legend\" style=\"font-size: 16px;\">\n            4.8\/5 - (45 votes)    <\/div>\n    <\/div>\n\n<p><span class=\"dropcap\">D<\/span>ans un pr\u00e9c\u00e9dent article, nous avions vu quelles \u00e9taient les <strong>comp\u00e9tences indispensables<\/strong> d\u2019un bon <a href=\"https:\/\/bubbleplan.net\/blog\/gp-competences-chef-de-projet\/\">chef de projet<\/a>. Aujourd\u2019hui, nous allons nous pencher sur chaque m\u00e9thode de<strong> gestion projet<\/strong> permettant de <strong>bien organiser<\/strong> son \u00e9quipe !<\/p>\n\n\n\n<p>Il est difficile de faire en sorte qu\u2019une \u00e9quipe soit organis\u00e9e, rapide et efficace sans mettre en place une forme de <a href=\"https:\/\/bubbleplan.net\/blog\/methodes-gestion-projet-comment-choisir\/\"><strong>m\u00e9thodologie de projet<\/strong><\/a>. Celle-ci servira \u00e0 structurer et rationaliser l\u2019organisation d\u2019un projet. Elle peut \u00eatre accompagn\u00e9e d\u2019un <strong><a href=\"https:\/\/bubbleplan.net\">logiciel de gestion de projet<\/a><\/strong>, qui viendra la renforcer.<\/p>\n\n\n\n<p>Agile, Gantt, Kanban, <a href=\"https:\/\/bubbleplan.net\/blog\/choisir-la-bonne-methodologie-projet-agile-waterfall-hybride\/\">Waterfall<\/a> \u2026 Que de m\u00e9thodes diverses et vari\u00e9es. Mais comment savoir laquelle s\u00e9lectionner pour son entreprise et ses processus ?<\/p>\n\n\n\n<p>Je vous pr\u00e9sente 7 techniques pour vous aider \u00e0 trouver celle qui vous conviendra le plus ! Bonne lecture \u2026 \ud83d\ude09<\/p>\n\n\n\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_71 ez-toc-wrap-center counter-hierarchy ez-toc-counter ez-toc-transparent ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<span class=\"ez-toc-title\" style=\"cursor:inherit\">SOMMAIRE<\/span>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/#comment-choisir-la-bonne-methodologie\" title=\"Comment choisir la bonne m\u00e9thodologie ?\">Comment choisir la bonne m\u00e9thodologie ?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/#quelles-sont-les-4-etapes-dun-projet\" title=\"Quelles sont les 4 \u00e9tapes d&rsquo;un projet ?\">Quelles sont les 4 \u00e9tapes d&rsquo;un projet ?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/#1%ef%b8%8f%e2%83%a3-quest-ce-que-les-methodes-traditionnelles-ou-waterfall\" title=\"1\ufe0f\u20e3 Qu\u2019est-ce que les m\u00e9thodes traditionnelles ou Waterfall ?\">1\ufe0f\u20e3 Qu\u2019est-ce que les m\u00e9thodes traditionnelles ou Waterfall ?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/#2%ef%b8%8f%e2%83%a3-en-quoi-consistent-les-methodes-agiles\" title=\"2\ufe0f\u20e3 En quoi consistent les m\u00e9thodes agiles ?\">2\ufe0f\u20e3 En quoi consistent les m\u00e9thodes agiles ?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/#3%ef%b8%8f%e2%83%a3-la-methode-de-gestion-de-projet-adaptative-quest-ce-que-cest\" title=\"3\ufe0f\u20e3 La m\u00e9thode de gestion de projet adaptative, qu\u2019est-ce que c\u2019est ?\">3\ufe0f\u20e3 La m\u00e9thode de gestion de projet adaptative, qu\u2019est-ce que c\u2019est ?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/#4%ef%b8%8f%e2%83%a3-en-quoi-consiste-la-methode-du-chemin-critique-gantt\" title=\"4\ufe0f\u20e3 En quoi consiste la m\u00e9thode du chemin critique \/ Gantt ?\">4\ufe0f\u20e3 En quoi consiste la m\u00e9thode du chemin critique \/ Gantt ?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/#5%ef%b8%8f%e2%83%a3-quest-ce-que-la-methode-de-gestion-de-projet-pert\" title=\"5\ufe0f\u20e3 Qu\u2019est-ce que la m\u00e9thode de gestion de projet PERT ?\">5\ufe0f\u20e3 Qu\u2019est-ce que la m\u00e9thode de gestion de projet PERT ?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/#6%ef%b8%8f%e2%83%a3-la-methode-kanban-quest-ce-que-cest\" title=\"6\ufe0f\u20e3 La m\u00e9thode Kanban, qu\u2019est-ce que c\u2019est ?\">6\ufe0f\u20e3 La m\u00e9thode Kanban, qu\u2019est-ce que c\u2019est ?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/#7%ef%b8%8f%e2%83%a3-en-quoi-consiste-la-methode-de-gestion-de-projet-du-lean-management\" title=\"7\ufe0f\u20e3 En quoi consiste la m\u00e9thode de gestion de projet du Lean Management ?\">7\ufe0f\u20e3 En quoi consiste la m\u00e9thode de gestion de projet du Lean Management ?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/#decouvrez-bubble-plan-un-outil-adapte-a-chaque-methodologie\" title=\"D\u00e9couvrez Bubble Plan : un outil adapt\u00e9 \u00e0 chaque m\u00e9thodologie\">D\u00e9couvrez Bubble Plan : un outil adapt\u00e9 \u00e0 chaque m\u00e9thodologie<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/#faq\" title=\"FAQ\">FAQ<\/a><\/li><\/ul><\/nav><\/div>\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"comment-choisir-la-bonne-methodologie\"><\/span>Comment choisir la bonne m\u00e9thodologie ?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>Choisir la bonne m\u00e9thodologie pour mener \u00e0 bien un projet est tr\u00e8s important, mais ce n\u2019est pas suffisant. Avoir <strong>le bon outil l\u2019est tout autant<\/strong>. L\u2019outil va permettre de suivre les t\u00e2ches, de faciliter la collaboration mais aussi la communication au sein des \u00e9quipes et de pouvoir visualiser l\u2019avancement. Chaque projet n\u00e9cessite la bonne m\u00e9thodologie et l\u2019outil qui va avec.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter\"><a href=\"https:\/\/bubbleplan.net\/creer-un-compte-gratuit\"><img decoding=\"async\" width=\"2935\" height=\"1016\" src=\"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bubble-plan.png\" alt=\"appel \u00e0 l'action pour s'inscire sur bubble plan\" class=\"wp-image-14853\" srcset=\"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bubble-plan.png 2935w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bubble-plan-528x183.png 528w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bubble-plan-768x266.png 768w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bubble-plan-1536x532.png 1536w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bubble-plan-2048x709.png 2048w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bubble-plan-440x152.png 440w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bubble-plan-320x111.png 320w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bubble-plan-1400x485.png 1400w\" sizes=\"(max-width: 2935px) 100vw, 2935px\" loading=\"lazy\" \/><\/a><\/figure><\/div>\n\n\n<p><strong>L&rsquo;objectif principal<\/strong> d&rsquo;une m\u00e9thodologie de projet est de fournir un cadre clair pour la gestion et la r\u00e9alisation du projet. Elle offre une structure qui permet de diviser le projet en \u00e9tapes g\u00e9rables, en d\u00e9finissant les r\u00f4les et les responsabilit\u00e9s au sein de l&rsquo;\u00e9quipe projet. Une m\u00e9thodologie de projet bien choisie prend \u00e9galement en compte les ressources disponibles, les contraintes budg\u00e9taires et les besoins sp\u00e9cifiques du projet.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">\u00c9valuer et ajuster votre m\u00e9thodologie projet<\/h3>\n\n\n\n<p>Il y a plusieurs facteurs \u00e0 prendre en compte quant au choix de la m\u00e9thodologie. La nature du projet par exemple, ou encore les comp\u00e9tences des personnes de l\u2019\u00e9quipe. Plusieurs approches sont possibles. Vous pouvez opter pour une <strong>approche agile<\/strong> si les besoins des clients \u00e9voluent souvent, ou bien la <strong>m\u00e9thode waterfall<\/strong> si c\u2019est plut\u00f4t un projet o\u00f9 les exigences sont stables.<\/p>\n\n\n\n<p><strong>Choisir une m\u00e9thodologie de gestion de projet<\/strong> ne se limite pas seulement \u00e0 la planification initiale. Au fur et \u00e0 mesure que le projet avance, il est important de r\u00e9\u00e9valuer la m\u00e9thodologie pour s&rsquo;assurer qu&rsquo;elle r\u00e9pond toujours aux besoins et aux d\u00e9fis actuels. Une m\u00e9thodologie de projet flexible peut s&rsquo;adapter aux changements inattendus et garantir que le projet reste sur la bonne voie.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"quelles-sont-les-4-etapes-dun-projet\"><\/span>Quelles sont les 4 \u00e9tapes d&rsquo;un projet ?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>La <strong>gestion de projet<\/strong> repose sur une structure en \u00e9tapes, chacune \u00e9tant essentielle pour mener le projet \u00e0 bien. La premi\u00e8re \u00e9tape consiste \u00e0 <strong>d\u00e9finir clairement les besoins et les objectifs<\/strong> du projet. Il est important de comprendre les besoins des parties prenantes. C\u2019est ce qui permettra de poser des bases solides d\u00e8s le d\u00e9but du projet.<\/p>\n\n\n\n<p>Ensuite, vient la<strong> phase de planification<\/strong>. Cette phase implique de d\u00e9terminer les activit\u00e9s sp\u00e9cifiques \u00e0 entreprendre, d&rsquo;\u00e9tablir les \u00e9ch\u00e9anciers et d&rsquo;allouer les ressources n\u00e9cessaires. La m\u00e9thodologie de gestion de projet choisie joue un r\u00f4le crucial \u00e0 ce stade, car elle guidera la fa\u00e7on dont le plan sera \u00e9labor\u00e9 et structur\u00e9.<\/p>\n\n\n\n<p>La <strong>r\u00e9alisation<\/strong> est la troisi\u00e8me \u00e9tape, o\u00f9 les activit\u00e9s planifi\u00e9es sont mises en \u0153uvre. L&rsquo;\u00e9quipe projet travaille en collaboration pour atteindre les jalons d\u00e9finis. La <a href=\"https:\/\/bubblemeeting.net\/\" target=\"_blank\" rel=\"noopener\">communication<\/a> et la coordination sont essentielles \u00e0 cette \u00e9tape pour assurer un avancement fluide.<\/p>\n\n\n\n<p>Enfin, <strong>l&rsquo;\u00e9valuation<\/strong> intervient une fois que les activit\u00e9s sont achev\u00e9es. Cela implique de mesurer les r\u00e9sultats obtenus par rapport aux objectifs fix\u00e9s et d&rsquo;\u00e9valuer l&rsquo;efficacit\u00e9 de la m\u00e9thodologie utilis\u00e9e. Les le\u00e7ons apprises sont identifi\u00e9es pour am\u00e9liorer les futures m\u00e9thodologies de gestion de projet et optimiser les performances.<\/p>\n\n\n\n<p>En somme, une m\u00e9thodologie de projet bien choisie guide chaque \u00e9tape du processus, du d\u00e9marrage \u00e0 la cl\u00f4ture. Elle favorise la collaboration au sein de l&rsquo;\u00e9quipe projet, assure le suivi de l&rsquo;avancement et garantit que le projet r\u00e9ponde aux besoins du client tout en respectant les contraintes de temps et de ressources.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"1%ef%b8%8f%e2%83%a3-quest-ce-que-les-methodes-traditionnelles-ou-waterfall\"><\/span>1\ufe0f\u20e3 Qu\u2019est-ce que les m\u00e9thodes traditionnelles ou Waterfall ?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p><strong>La m\u00e9thode traditionnelle<\/strong> est la plus utilis\u00e9e en gestion de projet. Cette m\u00e9thode est plus commun\u00e9ment appel\u00e9e m\u00e9thode \u00ab en cascade \u00bb ou \u00ab Waterfall \u00bb. Et pourquoi l\u2019appelle-t-on ainsi ?<\/p>\n\n\n\n<p>Tout simplement car les <strong>diff\u00e9rentes activit\u00e9s <\/strong>de vos projets <strong>s\u2019encha\u00eenent en ordre s\u00e9quentiel,<\/strong>&nbsp;ce qui rappelle fortement l\u2019image d\u2019une chute d\u2019eau.<\/p>\n\n\n\n<p>Avec cette m\u00e9thode, chaque phase de votre projet doit \u00eatre finie avant de pouvoir passer \u00e0 la suivante.<\/p>\n\n\n\n<p>Cela vous permet d\u2019assurer que vos \u00e9quipes suivent \u00e0 la lettre le <strong>cahier des charges <\/strong>\u00e9tabli au pr\u00e9alable, et qu\u2019elles travaillent sur la totalit\u00e9 du projet et ce jusqu\u2019au terme de celui-ci.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Les inconv\u00e9nients de cette m\u00e9thode<\/h3>\n\n\n\n<p>Le principal reproche que l\u2019on peut faire \u00e0 la m\u00e9thode en cascade, c\u2019est son <strong>manque de souplesse<\/strong>.<\/p>\n\n\n\n<p>En effet, vu que le planning des activit\u00e9s et \u00e9tapes \/ phases \u00e0 r\u00e9aliser est \u00e9tabli \u00e0 l\u2019avance, et que tout est pr\u00e9vu de mani\u00e8re pr\u00e9cise, cela ne laisse que tr\u00e8s peu de place aux<strong> impr\u00e9vus et changements<\/strong>.<\/p>\n\n\n\n<p>En plus, tout au long du projet, il n\u2019y a pas d\u2019interaction avec le client. Celui-ci ne recevra son projet qu\u2019une fois termin\u00e9. Ce qui peut s\u2019av\u00e9rer probl\u00e9matique car les <strong>attentes du client peuvent \u00e9voluer<\/strong> et donc ne plus correspondre au travail effectu\u00e9.<\/p>\n\n\n\n<p>La m\u00e9thode en Cascade ou <a href=\"https:\/\/bubbleplan.net\/pedagogie-projet\/methode-waterfall\">Waterfall<\/a> s\u2019av\u00e8re donc \u00eatre <strong>efficace pour des projets de grande envergure<\/strong> et comportant de nombreux intervenants. Elle va simplifier le suivi des t\u00e2ches et des objectifs.<\/p>\n\n\n\n<p>L\u2019utilisation d\u2019un <a href=\"https:\/\/bubbleplan.net\">logiciel de gestion de projet<\/a> peut vous aider dans la mise en place de cette m\u00e9thode dans vos processus.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"2%ef%b8%8f%e2%83%a3-en-quoi-consistent-les-methodes-agiles\"><\/span>2\ufe0f\u20e3 En quoi consistent les m\u00e9thodes agiles ?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p><a href=\"https:\/\/bubbleplan.net\/pedagogie-projet\/methode-agile\">La m\u00e9thode Agile<\/a> est une approche tr\u00e8s souvent utilis\u00e9e en<strong> gestion de projet<\/strong>. Elle s\u2019apparente d\u2019ailleurs davantage \u00e0 un principe et regroupe en elle-m\u00eame diff\u00e9rentes m\u00e9thodes.<\/p>\n\n\n\n<p>Ces derni\u00e8res placent <strong>le client au c\u0153ur de leur pr\u00e9occupation<\/strong>&nbsp;et permettent aux \u00e9quipes d\u2019avoir une plus grande flexibilit\u00e9 dans la gestion du projet.<\/p>\n\n\n\n<p>Ici, le projet est d\u00e9coup\u00e9 en plusieurs cycles tr\u00e8s courts (sprint), qui sont perp\u00e9tuellement valid\u00e9s par le client. Cela permet aux \u00e9quipes d\u2019\u00eatre <strong>plus r\u00e9actives aux attentes des clients<\/strong> et de s\u2019adapter \u00e0 ces derni\u00e8res.<\/p>\n\n\n\n<p>Assurez-vous ainsi que le projet soit valid\u00e9 \u00e0 l\u2019arriv\u00e9e, et r\u00e9duisez les co\u00fbts suppl\u00e9mentaires induits par des changements de derni\u00e8re minute !<\/p>\n\n\n\n<p>Avec l\u2019approche Agile, on <strong>valorise les individus et la communication<\/strong> plut\u00f4t que les processus. La collaboration est au c\u0153ur de son processus. <a href=\"https:\/\/bubbleplan.net\/blog\/top-5-outils-collaboratifs-entreprise\/\">De nombreux outils collaboratifs<\/a> peuvent d\u2019ailleurs vous aider \u00e0 travailler efficacement de fa\u00e7on collaborative.<\/p>\n\n\n\n<p>Les m\u00e9thodes agiles sont souvent associ\u00e9es \u00e0 d\u2019autres m\u00e9thodes telles que <a href=\"https:\/\/bubbleplan.net\/pedagogie-projet\/methode-scrum\">la m\u00e9thode Scrum<\/a>, <a href=\"https:\/\/bubbleplan.net\/pedagogie-projet\/methode-kanban\">Kanban<\/a> \u2026 De mani\u00e8re g\u00e9n\u00e9rale, les m\u00e9thodes agiles conviennent \u00e0 toutes les \u00e9quipes et tailles de projets.<\/p>\n\n\n\n<p>Implantation de centrales solaires, projet de d\u00e9veloppement commercial, <a href=\"https:\/\/bubbleplan.net\/blog\/plan-communication-gestion-projet-top7\/\">plan de communication<\/a>, \u2026 elles sont maintenant le quotidien de la gestion de projets en entreprise.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Les inconv\u00e9nients des m\u00e9thodes agiles<\/h3>\n\n\n\n<p>Elles pr\u00e9sentent quelques limites \u00e0 prendre en compte. Elles n\u00e9cessitent une <strong>forte implication du client<\/strong> tout au long du projet, ce qui n&rsquo;est pas toujours possible. De plus, cette flexibilit\u00e9 peut parfois rendre difficile l&rsquo;estimation pr\u00e9cise des d\u00e9lais et des budgets en d\u00e9but de projet, un point qui peut poser probl\u00e8me pour certaines organisations ayant besoin de cadres plus rigides.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"3%ef%b8%8f%e2%83%a3-la-methode-de-gestion-de-projet-adaptative-quest-ce-que-cest\"><\/span>3\ufe0f\u20e3 La m\u00e9thode de gestion de projet adaptative, qu\u2019est-ce que c\u2019est ?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>Comme son nom l\u2019indique, la m\u00e9thode adaptative permet de\u2026 <strong>s\u2019adapter<\/strong>. Elle est plus souvent \u00e0 privil\u00e9gier quand les attentes d\u2019un projet ne sont pas clairement d\u00e9finies.<\/p>\n\n\n\n<p>Elle oblige donc les \u00e9quipes \u00e0 s\u2019ajuster en permanence aux changements et impr\u00e9vus auxquels elles peuvent \u00eatre confront\u00e9es.<\/p>\n\n\n\n<p>De nombreuses variables constituent un projet telles que :<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>les risques,<\/li>\n\n\n\n<li>les co\u00fbts,<\/li>\n\n\n\n<li>la dur\u00e9e,<\/li>\n\n\n\n<li>ou encore les comp\u00e9tences de <a href=\"https:\/\/bubbleplan.net\/blog\/ameliorer-la-communication-au-sein-de-votre-equipe-agile\/\">l\u2019\u00e9quipe<\/a>.<\/li>\n<\/ul>\n\n\n\n<p>En utilisant une approche adaptative, vous vous \u00e9vitez tout le stress li\u00e9 \u00e0 une incapacit\u00e9 \u00e0 s\u2019adapter \u00e0 ces variables.<\/p>\n\n\n\n<p>Tout le propos de la m\u00e9thode adaptative r\u00e9side finalement dans un seul concept&nbsp;: <strong>l\u2019ajustement<\/strong>.<\/p>\n\n\n\n<p>Contrairement aux approches traditionnelles, o\u00f9 l\u2019on va travailler sur un projet en suivant un planning \u00e0 la lettre, ici on va faire en sorte de comprendre chaque situation pour s\u2019y adapter.<\/p>\n\n\n\n<p>Cette m\u00e9thode s\u2019av\u00e8re \u00eatre particuli\u00e8rement efficace pour <a href=\"https:\/\/bubbleplan.net\/blog\/gestion-projet-informatique\/\">la gestion de projets informatiques<\/a>, qui pr\u00e9sentent de nombreuses variables et qui \u00e9voluent constamment.<\/p>\n\n\n\n<p>Mais de mani\u00e8re g\u00e9n\u00e9rale, l\u2019approche adaptative correspond aux secteurs en constante \u00e9volution.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"4%ef%b8%8f%e2%83%a3-en-quoi-consiste-la-methode-du-chemin-critique-gantt\"><\/span>4\ufe0f\u20e3 En quoi consiste la m\u00e9thode du chemin critique \/ Gantt ?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p><a href=\"https:\/\/bubbleplan.net\/pedagogie-projet\/diagramme-gantt-en-ligne\">La m\u00e9thode du chemin critique ou de GANTT <\/a>a comme sp\u00e9cificit\u00e9 de <strong>se focaliser sur la dur\u00e9e des t\u00e2ches<\/strong>, et par cons\u00e9quent sur la dur\u00e9e totale du projet.<\/p>\n\n\n\n<p>On va ainsi d\u00e9terminer quelles sont les t\u00e2ches \u00e0 r\u00e9aliser en priorit\u00e9 afin de terminer le travail en temps et en heure.<\/p>\n\n\n\n<p>Ces t\u00e2ches sont appel\u00e9es <strong>\u00ab\u00a0t\u00e2ches critiques\u00a0\u00bb.<\/strong> Il faut imp\u00e9rativement les r\u00e9aliser au bon moment. Afin de ne pas accumuler aucun retard, et assurer la r\u00e9ussite dans les temps du projet.<\/p>\n\n\n\n<p><strong>Aucune marge de man\u0153uvre<\/strong> n\u2019est donc possible avec ces t\u00e2ches. En parall\u00e8le, il y a les \u00ab t\u00e2ches non critiques \u00bb qui sont moins importantes et d\u00e9pendantes de la r\u00e9alisation des t\u00e2ches critiques.<\/p>\n\n\n\n<p>Pour mieux visualiser ce <a href=\"https:\/\/bubbleplan.net\/blog\/chemin-critique-gestion-de-projet-experte-sous-bubble-plan\/\">chemin critique<\/a>, vous pouvez <strong>cr\u00e9er un diagramme de Gantt<\/strong>.<\/p>\n\n\n\n<p>Cela va vous permettre de mieux visualiser les interd\u00e9pendances entre vos t\u00e2ches, et de d\u00e9gager de mani\u00e8re visuelle la cha\u00eene critique. Vous pouvez retrouver notre guide pour cr\u00e9er votre diagramme de Gantt facilement&nbsp;!<\/p>\n\n\n\n<p><strong>La m\u00e9thode du chemin critique<\/strong> est \u00e9troitement li\u00e9e \u00e0 <a href=\"https:\/\/bubbleplan.net\/blog\/methode-pert\/\">la m\u00e9thode PERT<\/a>, qui vous aidera \u00e0 trouver la meilleure organisation possible afin de conclure le projet dans les meilleurs d\u00e9lais.<\/p>\n\n\n\n<p>Vous pourrez comparer ce que vous aviez pr\u00e9vu qu\u2019il se passe et ce qui se passe en temps r\u00e9el. Ainsi, vous pourrez vous r\u00e9ajuster pour assurer la remise du projet dans les d\u00e9lais.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"5%ef%b8%8f%e2%83%a3-quest-ce-que-la-methode-de-gestion-de-projet-pert\"><\/span>5\ufe0f\u20e3 Qu\u2019est-ce que la m\u00e9thode de gestion de projet PERT ?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>Comme j\u2019ai pu vous le dire juste au-dessus, la <a href=\"https:\/\/bubbleplan.net\/blog\/methode-pert\/\">m\u00e9thode PERT<\/a> est souvent utilis\u00e9e <strong>en accord avec la m\u00e9thode du chemin critique<\/strong>. Elle permet de repr\u00e9senter graphiquement les \u00e9tapes d\u2019un projet.<\/p>\n\n\n\n<p>Pour cela, vous devez <strong>\u00e9tablir un listing <\/strong>de toutes les t\u00e2ches \u00e0 effectuer, <strong>les ordonner<\/strong>&nbsp;et <strong>\u00e9tablir leurs d\u00e9pendances<\/strong>. Par exemple, vous pouvez d\u00e9finir que la t\u00e2che B ne peut commencer qu\u2019une fois la t\u00e2che A termin\u00e9e.<\/p>\n\n\n\n<p>Ou encore, que la t\u00e2che C peut d\u00e9marrer en m\u00eame temps que la t\u00e2che D. &nbsp;Puis vous devez <strong>d\u00e9finir leur chronologie<\/strong>, avec une date de fin \u00ab au plus tard \u00bb et une \u00ab au plus t\u00f4t \u00bb. Ce qui permet d\u2019estimer la dur\u00e9e minimale du projet.<\/p>\n\n\n\n<p>Sa<strong> repr\u00e9sentation graphique<\/strong> se fait <strong>sous la forme d\u2019un r\u00e9seau<\/strong>&nbsp;mettant en avant le d\u00e9but et la fin du projet, les d\u00e9pendances entre les t\u00e2ches et leur dur\u00e9e. Gr\u00e2ce \u00e0 ce graphique, vous pourrez en d\u00e9gager le chemin critique.<\/p>\n\n\n\n<p>C\u2019est un travail assez long et fastidieux, et le diagramme n\u2019est pas \u00e9vident \u00e0 lire. Cependant, il existe des <a href=\"https:\/\/bubbleplan.net\/blog\/types-outil-gestion-de-projet\/\">outils de gestion de projet<\/a> qui proposent des solutions pouvant vous aider \u00e0 r\u00e9aliser plus facilement votre diagramme de PERT.<\/p>\n\n\n\n<p>La m\u00e9thode PERT s\u2019av\u00e8re \u00eatre tr\u00e8s pratique pour le manager, qui va pouvoir cr\u00e9er plus facilement des calendriers et des budgets pour chaque aspect du projet.\ud83d\ude09 L&rsquo;int\u00e9gration de diff\u00e9rentes <strong>m\u00e9thodologies de travail<\/strong> peut enrichir encore davantage la gestion de projet.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"6%ef%b8%8f%e2%83%a3-la-methode-kanban-quest-ce-que-cest\"><\/span>6\ufe0f\u20e3 La m\u00e9thode Kanban, qu\u2019est-ce que c\u2019est ?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>La m\u00e9thode Kanban fait partie des nombreuses <a href=\"https:\/\/bubbleplan.net\/pedagogie-projet\/methode-agile\">m\u00e9thodes agiles<\/a>. C&rsquo;est <strong>un outil de management visuel<\/strong> tr\u00e8s populaire actuellement.<\/p>\n\n\n\n<p>En effet, elle permet de faire circuler de mani\u00e8re efficace les informations entre collaborateurs. Et surtout elle s\u2019int\u00e8gre facilement aux processus de toutes sortes d\u2019entreprises.<\/p>\n\n\n\n<p>Mais qu\u2019est-ce que vous permet concr\u00e8tement de faire la <a href=\"https:\/\/bubbleplan.net\/pedagogie-projet\/methode-kanban\">m\u00e9thode Kanban<\/a> ? Gr\u00e2ce \u00e0 cette m\u00e9thode, vous allez pouvoir <strong>r\u00e9partir dans un tableau<\/strong>, en fonction de leur avancement, <strong>les diff\u00e9rentes t\u00e2ches \u00e0 r\u00e9aliser<\/strong> tout au long de votre projet.<\/p>\n\n\n\n<p><span style=\"box-sizing: border-box; margin: 0px; padding: 0px;\">Ce dernier se divise souvent en 3 colonnes : \u00ab \u00c0 faire \u00bb, \u00ab En cours \u00bb et \u00ab Termin\u00e9 \u00bb. De&nbsp;<a href=\"https:\/\/bubbleplan.net\/blog\/types-outil-gestion-de-projet\/\" target=\"_blank\" rel=\"noopener\">nombreux outils<\/a> permettent de cr\u00e9er de mani\u00e8re visuelle ce genre de tableau.<\/span><\/p>\n\n\n\n<p>Une autre colonne existe, il s&rsquo;agit de \u00ab <strong><a href=\"https:\/\/bubbleplan.net\/blog\/product-backlog-methode-scrum-application-mise-en-place-pratique-exemples\/\">Backlog \u00bb<\/a><\/strong>. Cette derni\u00e8re se trouve avant les 3 mentionn\u00e9es ci-dessus et vous servira \u00e0 :<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>mettre des id\u00e9es de cot\u00e9,<\/li>\n\n\n\n<li>d\u00e9rouler un process,<\/li>\n\n\n\n<li>ou bien pour afficher les \u00e9tapes dans votre planning.<\/li>\n<\/ul>\n\n\n\n<p>Cette m\u00e9thode ne reposant pas sur un processus clairement d\u00e9fini, en comparaison avec d\u2019autres, s&rsquo;utilise de mani\u00e8res totalement diff\u00e9rentes en fonction des entreprises.<\/p>\n\n\n\n<p><strong>Sa grande flexibilit\u00e9 et son aspect visuel<\/strong> en font une m\u00e9thode tr\u00e8s appr\u00e9ci\u00e9e des \u00e9quipes travaillant en mode agile.<\/p>\n\n\n\n<p>Cependant, le fait de ne pas avoir de cadre pr\u00e9cis implique que vos \u00e9quipes doivent imp\u00e9rativement \u00eatre rigoureuses dans leur travail, fiables et tr\u00e8s organis\u00e9es.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Les limites du Kanban<\/h3>\n\n\n\n<p>Cette approche peut s&rsquo;av\u00e9rer moins adapt\u00e9e aux projets n\u00e9cessitant des \u00e9ch\u00e9ances fixes ou une planification d\u00e9taill\u00e9e \u00e0 long terme.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"7%ef%b8%8f%e2%83%a3-en-quoi-consiste-la-methode-de-gestion-de-projet-du-lean-management\"><\/span>7\ufe0f\u20e3 En quoi consiste la m\u00e9thode de gestion de projet du Lean Management ?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>Le ma\u00eetre mot de <a href=\"https:\/\/bubbleplan.net\/blog\/le-lean-management-et-les-differents-outils-pour-lappliquer-en-entreprise\/\">la m\u00e9thode du Lean Management<\/a>&nbsp;: <strong>la performance<\/strong>. Avec cette m\u00e9thode, on recherche&nbsp;<span style=\"box-sizing: border-box; margin: 0px; padding: 0px;\"><strong>d&rsquo;accro\u00eetre<\/strong><\/span><strong>&nbsp;la productivit\u00e9<\/strong> en fournissant un travail de qualit\u00e9, tout en r\u00e9duisant <strong>les co\u00fbts et les d\u00e9lais<\/strong>.<\/p>\n\n\n\n<p>L\u2019id\u00e9e ici est de <strong>gagner en performance<\/strong> en s\u2019am\u00e9liorant continuellement, tout en limitant au maximum les gaspillages.<\/p>\n\n\n\n<p>Tout \u00e7a dans le but de satisfaire le client. Les 3 ennemis du Lean Management sont : le gaspillage, les irr\u00e9gularit\u00e9s (d\u00e9s\u00e9quilibre au niveau de la gestion des ressources) et le surmenage.<\/p>\n\n\n\n<p>Le <a href=\"https:\/\/bubbleplan.net\/blog\/gp-competences-chef-de-projet\/\">chef de projet<\/a> qui utilise cette m\u00e9thode a pour mission principale de <strong>tenir \u00e0 distance ces 3 maux<\/strong> dans le but de gagner en efficacit\u00e9 et de simplifier les processus.<\/p>\n\n\n\n<p><strong>La m\u00e9thode du Lean Management<\/strong> est aussi tr\u00e8s efficace pour les \u00e9quipes qui rencontrent des probl\u00e8mes d\u2019efficacit\u00e9.<\/p>\n\n\n\n<p><span class=\"dropcap dropcap3\">V<\/span>oici une liste non-exhaustive des diff\u00e9rentes m\u00e9thodes de gestion de projet \u00e0 utiliser en entreprise.<br class=\"yoast-text-mark\">lass=\u00a0\u00bbyoast-text-mark\u00a0\u00bb \/&gt;&gt;Comme vous l\u2019aurez s\u00fbrement compris \u00e0 travers cet article, avoir une m\u00e9thodologie de projet adapt\u00e9e permet donc de <strong>gagner en efficacit\u00e9<\/strong> et en &lt;strong&gt;productivit\u00e9.<\/p>\n\n\n\n<p>Votre \u00e9quipe rendra une meilleure prestation gr\u00e2ce \u00e0 un travail correctement organis\u00e9 !<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"decouvrez-bubble-plan-un-outil-adapte-a-chaque-methodologie\"><\/span><strong>D\u00e9couvrez Bubble Plan : un outil adapt\u00e9 \u00e0 chaque m\u00e9thodologie<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter\"><img decoding=\"async\" width=\"2851\" height=\"1699\" src=\"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2024\/08\/planning-e1724752838244.png\" alt=\"Un planning sur l'outil Bubble Plan, o\u00f9 l'on trouve diff\u00e9rentes bulles repr\u00e9sentant des t\u00e2ches et des jalons symbolisant des \u00e9v\u00e9nements importants comme des r\u00e9unions. \" class=\"wp-image-12146\" srcset=\"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2024\/08\/planning-e1724752838244.png 2851w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2024\/08\/planning-e1724752838244-528x315.png 528w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2024\/08\/planning-e1724752838244-768x458.png 768w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2024\/08\/planning-e1724752838244-1536x915.png 1536w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2024\/08\/planning-e1724752838244-2048x1220.png 2048w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2024\/08\/planning-e1724752838244-440x262.png 440w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2024\/08\/planning-e1724752838244-320x191.png 320w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2024\/08\/planning-e1724752838244-1400x834.png 1400w\" sizes=\"(max-width: 2851px) 100vw, 2851px\" loading=\"lazy\" \/><\/figure><\/div>\n\n\n<p><\/p>\n\n\n\n<p>Dans le monde complexe de la <a href=\"https:\/\/bubbleplan.net\/gestion-projet-planning-en-ligne\"><strong>gestion de projet,<\/strong><\/a> l&rsquo;application pratique d&rsquo;une m\u00e9thodologie ad\u00e9quate et sa visualisation claire sont essentielles. Pour ce faire, l&rsquo;utilisation d&rsquo;un logiciel de gestion de projet performant et intuitif est indispensable. <strong>Bubble Plan<\/strong> se distingue comme une solution id\u00e9ale, adapt\u00e9e \u00e0 diverses approches m\u00e9thodologiques. Que vous suiviez une m\u00e9thode Agile, Waterfall ou toute autre pratique de gestion, notre outil s&rsquo;adapte pour faciliter la planification et le suivi de vos projets.<\/p>\n\n\n\n<p><strong>Bubble Plan<\/strong> est con\u00e7u pour simplifier la collaboration entre les membres de l&rsquo;\u00e9quipe, offrant une interface simple et visuelle qui rend la gestion des t\u00e2ches plus fluide et moins stressante. Gr\u00e2ce \u00e0 ses fonctionnalit\u00e9s de pointe, vous pouvez facilement cr\u00e9er :<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>des diagrammes de Gantt,<\/li>\n\n\n\n<li>des <a href=\"https:\/\/www.youtube.com\/watch?v=jbHao6Idnso&amp;t=2s\" target=\"_blank\" rel=\"noopener\">tableaux Kanban<\/a>,<\/li>\n\n\n\n<li>et suivre l\u2019avancement du projet en temps r\u00e9el.<\/li>\n<\/ul>\n\n\n\n<p>Pour appliquer concr\u00e8tement une m\u00e9thodologie, je vous conseille vivement d\u2019utiliser un logiciel de gestion de projet ! Pensez \u00e0<strong> Bubble Plan<\/strong>, notre <a href=\"https:\/\/bubbleplan.net\">solution collaborative simple et visuelle<\/a> !<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter\"><a href=\"https:\/\/bubbleplan.net\/creer-un-compte-gratuit\"><img decoding=\"async\" width=\"2560\" height=\"424\" src=\"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bas-de-page-1.png\" alt=\"appel \u00e0 l'action avec un texte \u00e0 gauche, et un bouton vert \u00e0 droite\" class=\"wp-image-14861\" srcset=\"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bas-de-page-1.png 2560w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bas-de-page-1-528x87.png 528w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bas-de-page-1-768x127.png 768w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bas-de-page-1-1536x254.png 1536w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bas-de-page-1-2048x339.png 2048w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bas-de-page-1-440x73.png 440w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bas-de-page-1-320x53.png 320w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bas-de-page-1-1400x232.png 1400w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" loading=\"lazy\" \/><\/a><\/figure><\/div>\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"faq\"><\/span>FAQ<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<div class=\"schema-faq wp-block-yoast-faq-block\"><div class=\"schema-faq-section\" id=\"faq-question-1763378096998\"><strong class=\"schema-faq-question\">Est-il obligatoire d\u2019utiliser un logiciel de gestion de projet ?<\/strong> <p class=\"schema-faq-answer\">Ce n&rsquo;est pas obligatoire, mais fortement recommand\u00e9. Un outil comme Bubble Plan permet de suivre l\u2019avancement, faciliter la communication et la collaboration, et visualiser les t\u00e2ches en temps r\u00e9el, quel que soit la m\u00e9thodologie utilis\u00e9e.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1763378301452\"><strong class=\"schema-faq-question\">Comment savoir si ma m\u00e9thodologie fonctionne ?<\/strong> <p class=\"schema-faq-answer\">Il est important d\u2019\u00e9valuer r\u00e9guli\u00e8rement vos m\u00e9thodes. Mesurez l\u2019avancement par rapport aux objectifs, identifiez les points \u00e0 am\u00e9liorer et ajustez la m\u00e9thodologie si n\u00e9cessaire. L\u2019\u00e9valuation permet d\u2019optimiser les performances et d\u2019anticiper les probl\u00e8mes sur les prochains projets.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1763378333286\"><strong class=\"schema-faq-question\">Puis-je combiner plusieurs m\u00e9thodologies ?<\/strong> <p class=\"schema-faq-answer\">Oui, il est courant d\u2019adopter une approche hybride. Par exemple, utiliser Agile pour les sprints et Waterfall pour la planification globale ou combiner Kanban et PERT pour suivre les t\u00e2ches et les d\u00e9pendances. L\u2019important est que la combinaison choisie reste coh\u00e9rente et adapt\u00e9e \u00e0 votre \u00e9quipe.<\/p> <\/div> <\/div>\n","protected":false},"excerpt":{"rendered":"<p>Dans un pr\u00e9c\u00e9dent article, nous avions vu quelles \u00e9taient les comp\u00e9tences indispensables d\u2019un bon chef de projet. Aujourd\u2019hui, nous allons nous pencher sur chaque m\u00e9thode de gestion projet permettant de bien organiser son \u00e9quipe ! Il est difficile de faire en sorte qu\u2019une \u00e9quipe soit organis\u00e9e, rapide et efficace sans mettre en place une forme&#8230;<\/p>\n","protected":false},"author":3,"featured_media":13709,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[625],"tags":[52,57,66,172],"class_list":{"0":"post-1356","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","6":"hentry","7":"category-methodes","8":"tag-gestion-de-projet","9":"tag-entreprise","10":"tag-methode","11":"tag-methodologie","12":"article","13":"","15":"has-excerpt","16":"has-avatar","17":"has-author","18":"has-nickname","19":"has-date","20":"has-comment-count","21":"has-category-meta","22":"has-read-more","23":"has-title","24":"has-post-media","25":"thumbnail-"},"nelio_content":{"isAutoShareEnabled":true,"autoShareEndMode":"never","automationSources":{"useCustomSentences":false,"customSentences":[]},"followers":[1,2,3,14],"suggestedReferences":["https:\/\/www.planzone.fr\/blog\/etapes-choisir-methodologie-gestion-projet?utm_content=56236101&utm_medium=social&utm_source=twitter"],"efiUrl":"","efiAlt":"","highlights":[],"permalinkQueryArgs":[],"series":[]},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>M\u00e9thode de gestion de projet : les 7 m\u00e9thodologies \u00e0 conna\u00eetre \ud83d\udd0e<\/title>\n<meta name=\"description\" content=\"D\u00e9couvrez ces 7 m\u00e9thodes de gestion de projet \u00e0 tester en entreprise pour gagner en temps, \u00e9nergie, performance et surtout en productivit\u00e9.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"M\u00e9thode de gestion de projet : les 7 m\u00e9thodologies \u00e0 conna\u00eetre \ud83d\udd0e\" \/>\n<meta property=\"og:description\" content=\"D\u00e9couvrez ces 7 m\u00e9thodes de gestion de projet \u00e0 tester en entreprise pour gagner en temps, \u00e9nergie, performance et surtout en productivit\u00e9.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/\" \/>\n<meta property=\"og:site_name\" content=\"Bubble Plan : blog de la Gestion de Projet efficace et collaborative\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/bubbleplan\" \/>\n<meta property=\"article:published_time\" content=\"2025-11-17T11:20:28+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-01-06T11:04:56+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2024\/08\/outil-retroplanning-projet-pourquoi-et-comment-le-realiser-simplement.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"800\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"S\u00e9bastien\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@BubblePlan\" \/>\n<meta name=\"twitter:site\" content=\"@BubblePlan\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"S\u00e9bastien\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"14 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/\"},\"author\":{\"name\":\"S\u00e9bastien\",\"@id\":\"https:\/\/bubbleplan.net\/blog\/#\/schema\/person\/0cf5b532bf591f559bc9d257ad4326ca\"},\"headline\":\"7 m\u00e9thodologies de gestion de projet utiles en entreprise\",\"datePublished\":\"2025-11-17T11:20:28+00:00\",\"dateModified\":\"2026-01-06T11:04:56+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/\"},\"wordCount\":2943,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/bubbleplan.net\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2024\/08\/outil-retroplanning-projet-pourquoi-et-comment-le-realiser-simplement.jpg\",\"keywords\":[\"gestion de projet\",\"entreprise\",\"m\u00e9thode\",\"m\u00e9thodologie\"],\"articleSection\":[\"M\u00e9thodes\"],\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/#respond\"]}]},{\"@type\":[\"WebPage\",\"FAQPage\"],\"@id\":\"https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/\",\"url\":\"https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/\",\"name\":\"M\u00e9thode de gestion de projet : les 7 m\u00e9thodologies \u00e0 conna\u00eetre \ud83d\udd0e\",\"isPartOf\":{\"@id\":\"https:\/\/bubbleplan.net\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2024\/08\/outil-retroplanning-projet-pourquoi-et-comment-le-realiser-simplement.jpg\",\"datePublished\":\"2025-11-17T11:20:28+00:00\",\"dateModified\":\"2026-01-06T11:04:56+00:00\",\"description\":\"D\u00e9couvrez ces 7 m\u00e9thodes de gestion de projet \u00e0 tester en entreprise pour gagner en temps, \u00e9nergie, performance et surtout en productivit\u00e9.\",\"breadcrumb\":{\"@id\":\"https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/#breadcrumb\"},\"mainEntity\":[{\"@id\":\"https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/#faq-question-1763378096998\"},{\"@id\":\"https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/#faq-question-1763378301452\"},{\"@id\":\"https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/#faq-question-1763378333286\"}],\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/#primaryimage\",\"url\":\"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2024\/08\/outil-retroplanning-projet-pourquoi-et-comment-le-realiser-simplement.jpg\",\"contentUrl\":\"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2024\/08\/outil-retroplanning-projet-pourquoi-et-comment-le-realiser-simplement.jpg\",\"width\":1200,\"height\":800,\"caption\":\"7 m\u00e9thodologies de gestion de projet utiles en entreprise\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Blog\",\"item\":\"https:\/\/bubbleplan.net\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"M\u00e9thodes\",\"item\":\"https:\/\/bubbleplan.net\/blog\/category\/methodes\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"7 m\u00e9thodologies de gestion de projet utiles en entreprise\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/bubbleplan.net\/blog\/#website\",\"url\":\"https:\/\/bubbleplan.net\/blog\/\",\"name\":\"Bubble Plan : blog de la Gestion de Projet efficace et collaborative\",\"description\":\"Toute l&#039;actualit\u00e9 de la gestion de projet et du collaboratif, avec Bubble Plan\",\"publisher\":{\"@id\":\"https:\/\/bubbleplan.net\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/bubbleplan.net\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/bubbleplan.net\/blog\/#organization\",\"name\":\"Bubble Plan\",\"url\":\"https:\/\/bubbleplan.net\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/bubbleplan.net\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2024\/07\/logo-leblog-vf-01-336.png\",\"contentUrl\":\"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2024\/07\/logo-leblog-vf-01-336.png\",\"width\":672,\"height\":62,\"caption\":\"Bubble Plan\"},\"image\":{\"@id\":\"https:\/\/bubbleplan.net\/blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/bubbleplan\",\"https:\/\/x.com\/BubblePlan\",\"https:\/\/www.linkedin.com\/company\/bubbleplan\",\"https:\/\/www.youtube.com\/channel\/UCDb4feDzsa4fCd_vR5HZJgg\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/bubbleplan.net\/blog\/#\/schema\/person\/0cf5b532bf591f559bc9d257ad4326ca\",\"name\":\"S\u00e9bastien\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/bubbleplan.net\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/985a305eb28132e28a04d1f5b5245796?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/985a305eb28132e28a04d1f5b5245796?s=96&d=mm&r=g\",\"caption\":\"S\u00e9bastien\"},\"description\":\"S\u00e9bastien partage sur le blog un regard aff\u00fbt\u00e9 sur la gestion de projet, nourri par son exp\u00e9rience de terrain et son sens de la clart\u00e9. Passionn\u00e9 de motion design, il aime aussi cr\u00e9er des ponts entre communication visuelle et pilotage efficace.\",\"url\":\"https:\/\/bubbleplan.net\/blog\/author\/sebastien\/\"},{\"@type\":\"Question\",\"@id\":\"https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/#faq-question-1763378096998\",\"position\":1,\"url\":\"https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/#faq-question-1763378096998\",\"name\":\"Est-il obligatoire d\u2019utiliser un logiciel de gestion de projet ?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Ce n'est pas obligatoire, mais fortement recommand\u00e9. Un outil comme Bubble Plan permet de suivre l\u2019avancement, faciliter la communication et la collaboration, et visualiser les t\u00e2ches en temps r\u00e9el, quel que soit la m\u00e9thodologie utilis\u00e9e.\",\"inLanguage\":\"fr-FR\"},\"inLanguage\":\"fr-FR\"},{\"@type\":\"Question\",\"@id\":\"https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/#faq-question-1763378301452\",\"position\":2,\"url\":\"https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/#faq-question-1763378301452\",\"name\":\"Comment savoir si ma m\u00e9thodologie fonctionne ?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Il est important d\u2019\u00e9valuer r\u00e9guli\u00e8rement vos m\u00e9thodes. Mesurez l\u2019avancement par rapport aux objectifs, identifiez les points \u00e0 am\u00e9liorer et ajustez la m\u00e9thodologie si n\u00e9cessaire. L\u2019\u00e9valuation permet d\u2019optimiser les performances et d\u2019anticiper les probl\u00e8mes sur les prochains projets.\",\"inLanguage\":\"fr-FR\"},\"inLanguage\":\"fr-FR\"},{\"@type\":\"Question\",\"@id\":\"https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/#faq-question-1763378333286\",\"position\":3,\"url\":\"https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/#faq-question-1763378333286\",\"name\":\"Puis-je combiner plusieurs m\u00e9thodologies ?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Oui, il est courant d\u2019adopter une approche hybride. Par exemple, utiliser Agile pour les sprints et Waterfall pour la planification globale ou combiner Kanban et PERT pour suivre les t\u00e2ches et les d\u00e9pendances. L\u2019important est que la combinaison choisie reste coh\u00e9rente et adapt\u00e9e \u00e0 votre \u00e9quipe.\",\"inLanguage\":\"fr-FR\"},\"inLanguage\":\"fr-FR\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"M\u00e9thode de gestion de projet : les 7 m\u00e9thodologies \u00e0 conna\u00eetre \ud83d\udd0e","description":"D\u00e9couvrez ces 7 m\u00e9thodes de gestion de projet \u00e0 tester en entreprise pour gagner en temps, \u00e9nergie, performance et surtout en productivit\u00e9.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/","og_locale":"fr_FR","og_type":"article","og_title":"M\u00e9thode de gestion de projet : les 7 m\u00e9thodologies \u00e0 conna\u00eetre \ud83d\udd0e","og_description":"D\u00e9couvrez ces 7 m\u00e9thodes de gestion de projet \u00e0 tester en entreprise pour gagner en temps, \u00e9nergie, performance et surtout en productivit\u00e9.","og_url":"https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/","og_site_name":"Bubble Plan : blog de la Gestion de Projet efficace et collaborative","article_publisher":"https:\/\/www.facebook.com\/bubbleplan","article_published_time":"2025-11-17T11:20:28+00:00","article_modified_time":"2026-01-06T11:04:56+00:00","og_image":[{"width":1200,"height":800,"url":"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2024\/08\/outil-retroplanning-projet-pourquoi-et-comment-le-realiser-simplement.jpg","type":"image\/jpeg"}],"author":"S\u00e9bastien","twitter_card":"summary_large_image","twitter_creator":"@BubblePlan","twitter_site":"@BubblePlan","twitter_misc":{"\u00c9crit par":"S\u00e9bastien","Dur\u00e9e de lecture estim\u00e9e":"14 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/#article","isPartOf":{"@id":"https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/"},"author":{"name":"S\u00e9bastien","@id":"https:\/\/bubbleplan.net\/blog\/#\/schema\/person\/0cf5b532bf591f559bc9d257ad4326ca"},"headline":"7 m\u00e9thodologies de gestion de projet utiles en entreprise","datePublished":"2025-11-17T11:20:28+00:00","dateModified":"2026-01-06T11:04:56+00:00","mainEntityOfPage":{"@id":"https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/"},"wordCount":2943,"commentCount":0,"publisher":{"@id":"https:\/\/bubbleplan.net\/blog\/#organization"},"image":{"@id":"https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/#primaryimage"},"thumbnailUrl":"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2024\/08\/outil-retroplanning-projet-pourquoi-et-comment-le-realiser-simplement.jpg","keywords":["gestion de projet","entreprise","m\u00e9thode","m\u00e9thodologie"],"articleSection":["M\u00e9thodes"],"inLanguage":"fr-FR","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/#respond"]}]},{"@type":["WebPage","FAQPage"],"@id":"https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/","url":"https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/","name":"M\u00e9thode de gestion de projet : les 7 m\u00e9thodologies \u00e0 conna\u00eetre \ud83d\udd0e","isPartOf":{"@id":"https:\/\/bubbleplan.net\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/#primaryimage"},"image":{"@id":"https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/#primaryimage"},"thumbnailUrl":"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2024\/08\/outil-retroplanning-projet-pourquoi-et-comment-le-realiser-simplement.jpg","datePublished":"2025-11-17T11:20:28+00:00","dateModified":"2026-01-06T11:04:56+00:00","description":"D\u00e9couvrez ces 7 m\u00e9thodes de gestion de projet \u00e0 tester en entreprise pour gagner en temps, \u00e9nergie, performance et surtout en productivit\u00e9.","breadcrumb":{"@id":"https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/#breadcrumb"},"mainEntity":[{"@id":"https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/#faq-question-1763378096998"},{"@id":"https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/#faq-question-1763378301452"},{"@id":"https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/#faq-question-1763378333286"}],"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/#primaryimage","url":"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2024\/08\/outil-retroplanning-projet-pourquoi-et-comment-le-realiser-simplement.jpg","contentUrl":"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2024\/08\/outil-retroplanning-projet-pourquoi-et-comment-le-realiser-simplement.jpg","width":1200,"height":800,"caption":"7 m\u00e9thodologies de gestion de projet utiles en entreprise"},{"@type":"BreadcrumbList","@id":"https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Blog","item":"https:\/\/bubbleplan.net\/blog\/"},{"@type":"ListItem","position":2,"name":"M\u00e9thodes","item":"https:\/\/bubbleplan.net\/blog\/category\/methodes\/"},{"@type":"ListItem","position":3,"name":"7 m\u00e9thodologies de gestion de projet utiles en entreprise"}]},{"@type":"WebSite","@id":"https:\/\/bubbleplan.net\/blog\/#website","url":"https:\/\/bubbleplan.net\/blog\/","name":"Bubble Plan : blog de la Gestion de Projet efficace et collaborative","description":"Toute l&#039;actualit\u00e9 de la gestion de projet et du collaboratif, avec Bubble Plan","publisher":{"@id":"https:\/\/bubbleplan.net\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/bubbleplan.net\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/bubbleplan.net\/blog\/#organization","name":"Bubble Plan","url":"https:\/\/bubbleplan.net\/blog\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/bubbleplan.net\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2024\/07\/logo-leblog-vf-01-336.png","contentUrl":"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2024\/07\/logo-leblog-vf-01-336.png","width":672,"height":62,"caption":"Bubble Plan"},"image":{"@id":"https:\/\/bubbleplan.net\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/bubbleplan","https:\/\/x.com\/BubblePlan","https:\/\/www.linkedin.com\/company\/bubbleplan","https:\/\/www.youtube.com\/channel\/UCDb4feDzsa4fCd_vR5HZJgg"]},{"@type":"Person","@id":"https:\/\/bubbleplan.net\/blog\/#\/schema\/person\/0cf5b532bf591f559bc9d257ad4326ca","name":"S\u00e9bastien","image":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/bubbleplan.net\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/985a305eb28132e28a04d1f5b5245796?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/985a305eb28132e28a04d1f5b5245796?s=96&d=mm&r=g","caption":"S\u00e9bastien"},"description":"S\u00e9bastien partage sur le blog un regard aff\u00fbt\u00e9 sur la gestion de projet, nourri par son exp\u00e9rience de terrain et son sens de la clart\u00e9. Passionn\u00e9 de motion design, il aime aussi cr\u00e9er des ponts entre communication visuelle et pilotage efficace.","url":"https:\/\/bubbleplan.net\/blog\/author\/sebastien\/"},{"@type":"Question","@id":"https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/#faq-question-1763378096998","position":1,"url":"https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/#faq-question-1763378096998","name":"Est-il obligatoire d\u2019utiliser un logiciel de gestion de projet ?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"Ce n'est pas obligatoire, mais fortement recommand\u00e9. Un outil comme Bubble Plan permet de suivre l\u2019avancement, faciliter la communication et la collaboration, et visualiser les t\u00e2ches en temps r\u00e9el, quel que soit la m\u00e9thodologie utilis\u00e9e.","inLanguage":"fr-FR"},"inLanguage":"fr-FR"},{"@type":"Question","@id":"https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/#faq-question-1763378301452","position":2,"url":"https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/#faq-question-1763378301452","name":"Comment savoir si ma m\u00e9thodologie fonctionne ?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"Il est important d\u2019\u00e9valuer r\u00e9guli\u00e8rement vos m\u00e9thodes. Mesurez l\u2019avancement par rapport aux objectifs, identifiez les points \u00e0 am\u00e9liorer et ajustez la m\u00e9thodologie si n\u00e9cessaire. L\u2019\u00e9valuation permet d\u2019optimiser les performances et d\u2019anticiper les probl\u00e8mes sur les prochains projets.","inLanguage":"fr-FR"},"inLanguage":"fr-FR"},{"@type":"Question","@id":"https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/#faq-question-1763378333286","position":3,"url":"https:\/\/bubbleplan.net\/blog\/7-methodo-gestion-projet\/#faq-question-1763378333286","name":"Puis-je combiner plusieurs m\u00e9thodologies ?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"Oui, il est courant d\u2019adopter une approche hybride. Par exemple, utiliser Agile pour les sprints et Waterfall pour la planification globale ou combiner Kanban et PERT pour suivre les t\u00e2ches et les d\u00e9pendances. L\u2019important est que la combinaison choisie reste coh\u00e9rente et adapt\u00e9e \u00e0 votre \u00e9quipe.","inLanguage":"fr-FR"},"inLanguage":"fr-FR"}]}},"_links":{"self":[{"href":"https:\/\/bubbleplan.net\/blog\/wp-json\/wp\/v2\/posts\/1356","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bubbleplan.net\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bubbleplan.net\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bubbleplan.net\/blog\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/bubbleplan.net\/blog\/wp-json\/wp\/v2\/comments?post=1356"}],"version-history":[{"count":55,"href":"https:\/\/bubbleplan.net\/blog\/wp-json\/wp\/v2\/posts\/1356\/revisions"}],"predecessor-version":[{"id":15635,"href":"https:\/\/bubbleplan.net\/blog\/wp-json\/wp\/v2\/posts\/1356\/revisions\/15635"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/bubbleplan.net\/blog\/wp-json\/wp\/v2\/media\/13709"}],"wp:attachment":[{"href":"https:\/\/bubbleplan.net\/blog\/wp-json\/wp\/v2\/media?parent=1356"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bubbleplan.net\/blog\/wp-json\/wp\/v2\/categories?post=1356"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bubbleplan.net\/blog\/wp-json\/wp\/v2\/tags?post=1356"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}