{"id":18804,"date":"2026-11-23T10:00:00","date_gmt":"2026-11-23T09:00:00","guid":{"rendered":"https:\/\/bubbleplan.net\/blog\/?p=18804"},"modified":"2026-10-30T15:02:28","modified_gmt":"2026-10-30T14:02:28","slug":"excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil","status":"publish","type":"post","link":"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/","title":{"rendered":"Excel pour la gestion de projet : quand faut-il changer d&rsquo;outil ?"},"content":{"rendered":"\n\n<div class=\"kk-star-ratings kksr-auto kksr-align-left kksr-valign-top\"\n    data-payload='{&quot;align&quot;:&quot;left&quot;,&quot;id&quot;:&quot;18804&quot;,&quot;slug&quot;:&quot;default&quot;,&quot;valign&quot;:&quot;top&quot;,&quot;ignore&quot;:&quot;&quot;,&quot;reference&quot;:&quot;auto&quot;,&quot;class&quot;:&quot;&quot;,&quot;count&quot;:&quot;1&quot;,&quot;legendonly&quot;:&quot;&quot;,&quot;readonly&quot;:&quot;&quot;,&quot;score&quot;:&quot;5&quot;,&quot;starsonly&quot;:&quot;&quot;,&quot;best&quot;:&quot;5&quot;,&quot;gap&quot;:&quot;0&quot;,&quot;greet&quot;:&quot;Votre avis est essentiel !&quot;,&quot;legend&quot;:&quot;5\\\/5 - (1 vote)&quot;,&quot;size&quot;:&quot;20&quot;,&quot;title&quot;:&quot;Excel pour la gestion de projet : quand faut-il changer d\\u0026#039;outil ?&quot;,&quot;width&quot;:&quot;100&quot;,&quot;_legend&quot;:&quot;{score}\\\/{best} - ({count} {votes})&quot;,&quot;font_factor&quot;:&quot;1.25&quot;}'>\n            \n<div class=\"kksr-stars\">\n    \n<div class=\"kksr-stars-inactive\">\n            <div class=\"kksr-star\" data-star=\"1\" style=\"padding-right: 0px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 20px; height: 20px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"2\" style=\"padding-right: 0px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 20px; height: 20px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"3\" style=\"padding-right: 0px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 20px; height: 20px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"4\" style=\"padding-right: 0px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 20px; height: 20px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"5\" style=\"padding-right: 0px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 20px; height: 20px;\"><\/div>\n        <\/div>\n    <\/div>\n    \n<div class=\"kksr-stars-active\" style=\"width: 100px;\">\n            <div class=\"kksr-star\" style=\"padding-right: 0px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 20px; height: 20px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 0px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 20px; height: 20px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 0px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 20px; height: 20px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 0px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 20px; height: 20px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 0px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 20px; height: 20px;\"><\/div>\n        <\/div>\n    <\/div>\n<\/div>\n                \n\n<div class=\"kksr-legend\" style=\"font-size: 16px;\">\n            5\/5 - (1 vote)    <\/div>\n    <\/div>\n\n<p>Excel suffit pour piloter un projet simple, port\u00e9 par une personne. Il devient un frein d\u00e8s que plusieurs projets partagent les m\u00eames collaborateurs, que plusieurs fichiers circulent et que le reporting se fait \u00e0 la main. Voici les signes \u00e0 rep\u00e9rer et les \u00e9tapes pour adopter un outil plus adapt\u00e9 sans perturber votre organisation.<\/p>\n\n\n\n<div class=\"wp-block-group bbp-block-resume\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<p><strong>Ce qu\u2019il faut retenir<\/strong><\/p>\n\n\n\n<p>La transition peut se faire progressivement : d\u2019abord un service et quelques projets, puis un d\u00e9ploiement plus large.<\/p>\n\n\n\n<p>Excel reste pertinent pour un projet isol\u00e9, une petite \u00e9quipe et un planning qui bouge peu.<\/p>\n\n\n\n<p>Plusieurs de ces signaux se cumulent ? Testez un outil d\u00e9di\u00e9 et comparez le temps gagn\u00e9, le co\u00fbt des licences et l\u2019effort de d\u00e9ploiement.<\/p>\n\n\n\n<p>Les signaux les plus co\u00fbteux : les versions qui divergent, les ressources partag\u00e9es entre projets et la consolidation manuelle du reporting.<\/p>\n\n\n\n<p>Un logiciel de gestion de projet remplace le regroupement manuel des donn\u00e9es par une vue portefeuille mise \u00e0 jour en temps r\u00e9el.<\/p>\n<\/div><\/div>\n\n\n\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_71 ez-toc-wrap-center counter-hierarchy ez-toc-counter ez-toc-transparent ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<span class=\"ez-toc-title\" style=\"cursor:inherit\">SOMMAIRE<\/span>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/#pourquoi-excel-reste-le-premier-outil-de-gestion-de-projet\" title=\"Pourquoi Excel reste le premier outil de gestion de projet\">Pourquoi Excel reste le premier outil de gestion de projet<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/#les-8-signaux-qui-montrent-quexcel-ne-suffit-plus\" title=\"Les 8 signaux qui montrent qu&rsquo;Excel ne suffit plus\">Les 8 signaux qui montrent qu&rsquo;Excel ne suffit plus<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/#excel-ou-logiciel-de-gestion-de-projet-le-comparatif\" title=\"Excel ou logiciel de gestion de projet : le comparatif\">Excel ou logiciel de gestion de projet : le comparatif<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/#le-test-rapide-votre-organisation-est-elle-trop-complexe-pour-excel\" title=\"Le test rapide : votre organisation est-elle trop complexe pour Excel ?\">Le test rapide : votre organisation est-elle trop complexe pour Excel ?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/#temoignage-bioviva-a-quitte-ses-tableurs-excel\" title=\"T\u00e9moignage : BioViva a quitt\u00e9 ses tableurs Excel\">T\u00e9moignage : BioViva a quitt\u00e9 ses tableurs Excel<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/#quitter-excel-sans-bouleverser-vos-habitudes\" title=\"Quitter Excel sans bouleverser vos habitudes\">Quitter Excel sans bouleverser vos habitudes<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/#pourquoi-bubble-plan-pour-remplacer-excel\" title=\"Pourquoi Bubble Plan pour remplacer Excel\">Pourquoi Bubble Plan pour remplacer Excel<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/#faq\" title=\"FAQ\">FAQ<\/a><\/li><\/ul><\/nav><\/div>\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"pourquoi-excel-reste-le-premier-outil-de-gestion-de-projet\"><\/span>Pourquoi Excel reste le premier outil de gestion de projet<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p><strong>Excel<\/strong> est d\u00e9j\u00e0 install\u00e9, tout le monde sait l&rsquo;ouvrir et il n&rsquo;entra\u00eene pas de co\u00fbt suppl\u00e9mentaire lorsque l\u2019entreprise dispose d\u00e9j\u00e0 d\u2019une licence. Pour lister des t\u00e2ches, poser des dates et colorer quelques cases en forme de <a href=\"https:\/\/bubbleplan.net\/pedagogie-projet\/diagramme-gantt-en-ligne\/comment-creer-diagramme-gantt\">diagramme de Gantt<\/a>, il fait le travail. C&rsquo;est pour cela que la plupart des organisations commencent par lui.<\/p>\n\n\n\n<p>Le probl\u00e8me n&rsquo;est pas Excel. C&rsquo;est l&rsquo;usage qu&rsquo;on lui demande quand l&rsquo;organisation grandit : un <strong>tableur<\/strong> stocke des donn\u00e9es, il ne coordonne pas des personnes.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/bubbleplan.net\/creer-un-compte-gratuit\"><img decoding=\"async\" width=\"2911\" height=\"1008\" src=\"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bubble-plan-2911x1008.png\" alt=\"appel \u00e0 l'action pour s'inscrire sur bubble plan\" class=\"wp-image-14853\" srcset=\"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bubble-plan-2911x1008.png 2911w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bubble-plan-528x183.png 528w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bubble-plan-768x266.png 768w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bubble-plan-1536x532.png 1536w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bubble-plan-2048x709.png 2048w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bubble-plan-440x152.png 440w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bubble-plan-320x111.png 320w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bubble-plan-1400x485.png 1400w\" sizes=\"(max-width: 2911px) 100vw, 2911px\" loading=\"lazy\" \/><\/a><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"les-8-signaux-qui-montrent-quexcel-ne-suffit-plus\"><\/span>Les 8 signaux qui montrent qu&rsquo;Excel ne suffit plus<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">1. Les fichiers se multiplient<\/h3>\n\n\n\n<p>Un fichier par projet, un fichier par service, un fichier \u00ab synth\u00e8se \u00bb qui reprend les autres. Quand personne ne sait plus quel fichier fait foi,<strong> l&rsquo;information est dispers\u00e9e.<\/strong><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">2. Les versions divergent<\/h3>\n\n\n\n<p>Un fichier \u00ab Planning_V3_final_relu_JM.xlsx \u00bb envoy\u00e9 par mail, puis modifi\u00e9 en parall\u00e8le par deux personnes : chacun prend ses d\u00e9cisions \u00e0 partir d\u2019une version diff\u00e9rente. Le risque est d\u2019autant plus grand que <a href=\"https:\/\/bubbleplan.net\/blog\/versioning-historique-projets-analyser-ecarts-impacts\/\">les \u00e9carts<\/a> peuvent passer inaper\u00e7us.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">3. Chaque d\u00e9calage remet en cause l\u2019encha\u00eenement des t\u00e2ches<\/h3>\n\n\n\n<p>Une t\u00e2che glisse d&rsquo;une semaine et il faut d\u00e9caler \u00e0 la main toutes celles qui en d\u00e9pendent. Dans un tableur, les liens entre t\u00e2ches tiennent \u00e0 des formules <strong>sensibles aux erreurs<\/strong> de modification, ou \u00e0 la m\u00e9moire du <a href=\"https:\/\/bubbleplan.net\/blog\/evolution-du-metier-chef-de-projet-en-2025-tendances-et-perspectives\/\">chef de projet.<\/a><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">4. Les m\u00eames personnes travaillent sur plusieurs projets<\/h3>\n\n\n\n<p>Chaque planning semble r\u00e9aliste, mais personne ne voit que la m\u00eame graphiste est pr\u00e9vue \u00e0 150 % la semaine du lancement. <strong>Sans vue de charge transverse<\/strong>, la surcharge se d\u00e9couvre trop tard.&nbsp;<\/p>\n\n\n\n<p>Pour en savoir plus : <a href=\"https:\/\/bubbleplan.net\/blog\/comment-gerer-plusieurs-projets-en-meme-temps-sans-perdre-en-visibilite\/\">Comment g\u00e9rer plusieurs projets en m\u00eame temps sans perdre en visibilit\u00e9<\/a>&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">5. Le reporting prend une demi-journ\u00e9e<\/h3>\n\n\n\n<p>Chaque semaine ou chaque mois, quelqu&rsquo;un copie et colle les avancements de plusieurs fichiers pour la direction. Ce temps de compilation r\u00e9duit celui consacr\u00e9 \u00e0 l\u2019analyse et aux d\u00e9cisions,<strong> le r\u00e9sultat est d\u00e9j\u00e0 dat\u00e9 <\/strong>quand il est envoy\u00e9.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">6. Il n&rsquo;existe pas de vue portefeuille<\/h3>\n\n\n\n<p>La direction demande \u00ab o\u00f9 en sont nos projets ? \u00bb et personne ne peut r\u00e9pondre sans rassembler plusieurs tableaux. Arbitrer et <a href=\"https:\/\/bubbleplan.net\/blog\/comment-gerer-plusieurs-projets-en-meme-temps-sans-perdre-en-visibilite\/\">g\u00e9rer plusieurs projets<\/a> devient plus difficile.&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"1200\" height=\"800\" src=\"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2026\/07\/logiciel-portefeuille-projets-guide-bien-choisir.jpg\" alt=\"portefeuille de projets\" class=\"wp-image-18448\" srcset=\"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2026\/07\/logiciel-portefeuille-projets-guide-bien-choisir.jpg 1200w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2026\/07\/logiciel-portefeuille-projets-guide-bien-choisir-528x352.jpg 528w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2026\/07\/logiciel-portefeuille-projets-guide-bien-choisir-768x512.jpg 768w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2026\/07\/logiciel-portefeuille-projets-guide-bien-choisir-440x293.jpg 440w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2026\/07\/logiciel-portefeuille-projets-guide-bien-choisir-320x213.jpg 320w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" loading=\"lazy\" \/><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">7. Les \u00e9changes vivent ailleurs<\/h3>\n\n\n\n<p>Les commentaires, les validations et les pi\u00e8ces jointes sont dans les mails ou dans une messagerie, pas \u00e0 c\u00f4t\u00e9 de la t\u00e2che. Par cons\u00e9quent, retrouver pourquoi une date a boug\u00e9 <strong>prend du temps<\/strong>.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">8. Le fichier d\u00e9pend d&rsquo;une seule personne<\/h3>\n\n\n\n<p>Celle qui a cr\u00e9\u00e9 les formules et les macros, et qui est la seule \u00e0 en ma\u00eetriser le fonctionnement. En cas d\u2019absence ou de d\u00e9part, corriger une erreur ou adapter le fichier devient difficile. Le pilotage d\u00e9pend alors <strong>d\u2019une seule personne<\/strong>, au risque de ralentir toute l\u2019\u00e9quipe.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"excel-ou-logiciel-de-gestion-de-projet-le-comparatif\"><\/span>Excel ou logiciel de gestion de projet : le comparatif<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Besoin<\/strong><\/td><td><strong>Excel<\/strong><\/td><td><strong>Logiciel de gestion de projet<\/strong><\/td><\/tr><tr><td>Lister des t\u00e2ches et des dates<\/td><td>Oui<\/td><td>Oui<\/td><\/tr><tr><td>Planning Gantt avec d\u00e9pendances automatiques<\/td><td>Param\u00e9trage et maintenance des d\u00e9pendances \u00e0 pr\u00e9voir<\/td><td>Selon les fonctionnalit\u00e9s et la formule choisies<\/td><\/tr><tr><td>Co\u00e9dition possible<\/td><td>Risque de versions concurrentes si les fichiers circulent par mail<\/td><td>Une seule source \u00e0 jour<\/td><\/tr><tr><td>Charge des ressources sur plusieurs projets<\/td><td>Tr\u00e8s difficile<\/td><td><a href=\"https:\/\/bubbleplan.net\/blog\/les-vues-de-travail-dans-bubble-plan-la-bonne-information-au-bon-moment\/\">Vue de charge<\/a> par personne ou par \u00e9quipe<\/td><\/tr><tr><td>Vue portefeuille multi-projets<\/td><td>Consolidation manuelle<\/td><td>Selon les fonctionnalit\u00e9s et la formule choisies<\/td><\/tr><tr><td>Reporting direction<\/td><td>Copier-coller p\u00e9riodique<\/td><td><a href=\"https:\/\/bubbleplan.net\/blog\/pilotage-projets-menu-tableaux-bord-bubble-plan\/\">Tableaux de bord<\/a> en temps r\u00e9el<\/td><\/tr><tr><td>Historique des \u00e9changes sur une t\u00e2che<\/td><td>Commentaires possibles, mais \u00e9changes souvent r\u00e9partis entre plusieurs outils<\/td><td>Commentaires et fichiers sur la t\u00e2che<\/td><\/tr><tr><td>Co\u00fbt de d\u00e9part<\/td><td>D\u00e9j\u00e0 pay\u00e9<\/td><td><a href=\"https:\/\/bubbleplan.net\/comparatif-gratuit-premium\">Offres gratuites<\/a> puis abonnement par utilisateur<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"le-test-rapide-votre-organisation-est-elle-trop-complexe-pour-excel\"><\/span>Le test rapide : votre organisation est-elle trop complexe pour Excel ?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>Comptez les affirmations vraies pour vous :<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Nous g\u00e9rons plus de 5 projets en parall\u00e8le.<\/li>\n\n\n\n<li>Au moins une personne travaille sur 3 projets ou plus.<\/li>\n\n\n\n<li>Plus de 5 personnes modifient les plannings.<\/li>\n\n\n\n<li>Le reporting nous prend plus de 2 heures par mois.<\/li>\n\n\n\n<li>Nous avons d\u00e9j\u00e0 pris une d\u00e9cision sur une version p\u00e9rim\u00e9e d&rsquo;un fichier.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>0 ou 1 : Excel tient encore.\u00a0<\/li>\n\n\n\n<li>2 ou 3 : commencez \u00e0 tester un outil sur un projet.\u00a0<\/li>\n\n\n\n<li>4 ou 5 : le logiciel vous co\u00fbte d\u00e9j\u00e0 plus cher qu&rsquo;un logiciel.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"temoignage-bioviva-a-quitte-ses-tableurs-excel\"><\/span>T\u00e9moignage : BioViva a quitt\u00e9 ses tableurs Excel<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p><a href=\"https:\/\/bubbleplan.net\/blog\/bioviva-editeur-francais-efficacite-marketing\/\">BioViva \u00c9ditions<\/a>, \u00e9diteur fran\u00e7ais de jeux \u00e9ducatifs d&rsquo;environ 25 salari\u00e9s, suivait ses projets de d\u00e9veloppement dans des <strong>tableurs.<\/strong> L&rsquo;entreprise manquait de vision d&rsquo;ensemble, peinait \u00e0 croiser les plannings et \u00e0 ma\u00eetriser la charge de travail.<\/p>\n\n\n\n<p>Apr\u00e8s une comparaison de logiciels, l&rsquo;\u00e9quipe a choisi <a href=\"https:\/\/bubbleplan.net\/\">Bubble Plan<\/a>. R\u00e9sultat : 20 projets transverses pilot\u00e9s par plusieurs utilisateurs r\u00e9partis sur 2 services, avec une planification am\u00e9lior\u00e9e et un meilleur respect des \u00e9ch\u00e9ances.<\/p>\n\n\n\n<p>\u00ab Nous avons choisi Bubble Plan car l&rsquo;outil est facile \u00e0 prendre en main, intuitif. \u00bb&nbsp;<\/p>\n\n\n\n<p>Emeline Lebouteiller, responsable Projet et Gammes \u00e9ducatives, BioViva \u00c9ditions<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"quitter-excel-sans-bouleverser-vos-habitudes\"><\/span>Quitter Excel sans bouleverser vos habitudes<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Choisissez un p\u00e9rim\u00e8tre pilote : un service et 3 \u00e0 5 projets en cours suffisent.<\/li>\n\n\n\n<li>Importez l&rsquo;existant : reprenez les t\u00e2ches, dates et responsables de vos fichiers plut\u00f4t que de tout ressaisir.<\/li>\n\n\n\n<li>Cr\u00e9ez un mod\u00e8le de projet : vos projets r\u00e9currents d\u00e9marreront ensuite en quelques clics.<\/li>\n\n\n\n<li>Fixez une r\u00e8gle simple : le planning de l&rsquo;outil fait foi, les fichiers Excel sont archiv\u00e9s.<\/li>\n\n\n\n<li>Remplacez le reporting manuel : montrez \u00e0 la direction le tableau de bord au lieu d&rsquo;envoyer un fichier.<\/li>\n\n\n\n<li>\u00c9tendez apr\u00e8s 4 \u00e0 6 semaines : ajoutez les autres services une fois l\u2019\u00e9quipe pilote convaincue.<\/li>\n<\/ol>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"pourquoi-bubble-plan-pour-remplacer-excel\"><\/span>Pourquoi Bubble Plan pour remplacer Excel<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>Bubble Plan est un<strong> logiciel fran\u00e7ais de gestion de projet<\/strong>, cr\u00e9\u00e9 en 2015 et h\u00e9berg\u00e9 en France. Il garde la simplicit\u00e9 visuelle d&rsquo;un tableur tout en ajoutant ce qui manque \u00e0 Excel : planning Gantt avec d\u00e9pendances, consolidation multi-projets, <a href=\"https:\/\/bubbleplan.net\/blog\/arbitrage-des-ressources-comment-repartir-les-ressources-entre-plusieurs-projets\/\">gestion de la charge des ressources<\/a> et tableaux de bord.<\/p>\n\n\n\n<p>Vous pouvez commencer avec l&rsquo;offre Free \u00e0 0 \u20ac, ou tester les offres Premium gratuitement pendant 14 jours, sans carte bancaire.&nbsp;<\/p>\n\n\n\n<p>Tableau comparatif offre Free et Offres Premium<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Fonctionnalit\u00e9 \/ Crit\u00e8re<\/strong><\/td><td><strong>Offre Free (Gratuite)<\/strong><\/td><td><strong>Offres Premium (Team, Business, Enterprise)<\/strong><\/td><\/tr><tr><td>Prix<\/td><td>0 \u20ac<\/td><td>\u00c0 partir de 12,90 \u20ac \/ mois \/ utilisateur (Team) avec facturation annuelle&nbsp;<\/td><\/tr><tr><td>Nombre de projets<\/td><td>1 projet actif (possibilit\u00e9 d&rsquo;archiver pour en cr\u00e9er un autre)<\/td><td>Projets illimit\u00e9s (selon les formules)<\/td><\/tr><tr><td>Licences de consultation<\/td><td>2 licences de consultation<\/td><td>De 10 \u00e0 30 licences de consultation (selon le niveau)<\/td><\/tr><tr><td>Collaborateurs \/ Utilisateurs<\/td><td>1 collaborateur<\/td><td>Utilisateurs suppl\u00e9mentaires sous licence payante<\/td><\/tr><tr><td>Fonctionnalit\u00e9s avanc\u00e9es<\/td><td>Gestion de projet basique sur<a href=\"https:\/\/bubbleplan.net\/comparatif-gratuit-premium\"> Bubble Plan<\/a><\/td><td>Ressources avanc\u00e9es, gestion budg\u00e9taire, SSO et formation (formules Enterprise)<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><a href=\"https:\/\/www.youtube.com\/watch?v=00VZjyWlbbU\" target=\"_blank\" rel=\"noreferrer noopener\">Savoir g\u00e9rer et organiser ses documents dans Bubble Plan<\/a>\u00a0<\/p>\n\n\n\n<p>Vous souhaitez tester ? <a href=\"https:\/\/bubbleplan.net\/creer-un-compte-gratuit\">Cr\u00e9ez un compte gratuit<\/a> !<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><a href=\"https:\/\/bubbleplan.net\/creer-un-compte-gratuit\"><img decoding=\"async\" width=\"2560\" height=\"424\" src=\"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bas-de-page-1.png\" alt=\"appel \u00e0 l'action avec un texte \u00e0 gauche, et un bouton vert \u00e0 droite\" class=\"wp-image-14861\" srcset=\"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bas-de-page-1.png 2560w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bas-de-page-1-528x87.png 528w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bas-de-page-1-768x127.png 768w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bas-de-page-1-1536x254.png 1536w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bas-de-page-1-2048x339.png 2048w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bas-de-page-1-440x73.png 440w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bas-de-page-1-320x53.png 320w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bas-de-page-1-1400x232.png 1400w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" loading=\"lazy\" \/><\/a><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"faq\"><\/span>FAQ<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<div class=\"schema-faq wp-block-yoast-faq-block\"><div class=\"schema-faq-section\" id=\"faq-question-1793283604590\"><strong class=\"schema-faq-question\">Peut-on faire de la gestion de projet avec Excel ?\u00a0<\/strong> <p class=\"schema-faq-answer\">Oui, pour un projet simple, port\u00e9 par une personne ou une petite \u00e9quipe. Excel permet de lister des t\u00e2ches, de poser des dates et de dessiner un Gantt basique.<strong> Il devient limit\u00e9 <\/strong>d\u00e8s qu&rsquo;il faut g\u00e9rer plusieurs projets, des ressources partag\u00e9es ou des d\u00e9pendances.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1793283635890\"><strong class=\"schema-faq-question\">Quelles sont les limites d&rsquo;Excel en gestion de projet ?\u00a0<\/strong> <p class=\"schema-faq-answer\">Les principales sont les suivantes : versions concurrentes des fichiers, d\u00e9pendances entre t\u00e2ches \u00e0 maintenir \u00e0 la main, aucune vue de charge sur plusieurs projets, reporting consolid\u00e9 \u00e0 la main et collaboration hors du fichier.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1793283648664\"><strong class=\"schema-faq-question\">\u00c0 partir de combien de projets faut-il quitter Excel ?\u00a0<\/strong> <p class=\"schema-faq-answer\">Il n&rsquo;existe pas de seuil unique. En pratique, la bascule devient rentable d\u00e8s que des personnes travaillent sur plusieurs projets \u00e0 la fois.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1793283661272\"><strong class=\"schema-faq-question\">Par quoi remplacer Excel pour g\u00e9rer ses projets ?\u00a0<\/strong> <p class=\"schema-faq-answer\">Par un logiciel de gestion de projet qui centralise les plannings, calcule les d\u00e9pendances, montre la charge de chacun et g\u00e9n\u00e8re les tableaux de bord. Plusieurs logiciels, dont Bubble Plan, proposent une offre gratuite pour tester.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1793283679865\"><strong class=\"schema-faq-question\">Peut-on importer ses fichiers Excel dans un logiciel de gestion de projet ?\u00a0<\/strong> <p class=\"schema-faq-answer\">Oui, la plupart des logiciels proposent un import. Dans Bubble Plan, Excel fait partie des int\u00e9grations disponibles.<\/p> <\/div> <\/div>\n","protected":false},"excerpt":{"rendered":"<p>Excel suffit pour piloter un projet simple, port\u00e9 par une personne. Il devient un frein d\u00e8s que plusieurs projets partagent les m\u00eames collaborateurs, que plusieurs fichiers circulent et que le reporting se fait \u00e0 la main. Voici les signes \u00e0 rep\u00e9rer et les \u00e9tapes pour adopter un outil plus adapt\u00e9 sans perturber votre organisation. Ce&#8230;<\/p>\n","protected":false},"author":14,"featured_media":18834,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[632,634],"tags":[25,26,52,93,356,700],"class_list":{"0":"post-18804","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","6":"hentry","7":"category-management","8":"category-conduite-de-projet","9":"tag-pilotage","10":"tag-management","11":"tag-gestion-de-projet","12":"tag-excel","13":"tag-fonctionnalite-experte","14":"tag-alternative-excel","15":"article","16":"","18":"has-excerpt","19":"has-avatar","20":"has-author","21":"has-nickname","22":"has-date","23":"has-comment-count","24":"has-category-meta","25":"has-read-more","26":"has-title","27":"has-post-media","28":"thumbnail-"},"nelio_content":{"isAutoShareEnabled":true,"autoShareEndMode":"never","automationSources":{"useCustomSentences":false,"customSentences":[]},"followers":[14],"suggestedReferences":[],"efiUrl":"","efiAlt":"","highlights":[],"permalinkQueryArgs":[],"series":[]},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Excel pour la gestion de projet : quand changer d&#039;outil ?<\/title>\n<meta name=\"description\" content=\"Versions divergentes, reporting manuel, ressources surcharg\u00e9es : d\u00e9couvrez 8 signes qu\u2019Excel limite vos projets et comment changer d\u2019outil.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Excel pour la gestion de projet : quand changer d&#039;outil ?\" \/>\n<meta property=\"og:description\" content=\"Versions divergentes, reporting manuel, ressources surcharg\u00e9es : d\u00e9couvrez 8 signes qu\u2019Excel limite vos projets et comment changer d\u2019outil.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/\" \/>\n<meta property=\"og:site_name\" content=\"Bubble Plan : blog de la Gestion de Projet efficace et collaborative\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/bubbleplan\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-23T09:00:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2026\/10\/quand-changer-outil.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"800\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Ghita\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@BubblePlan\" \/>\n<meta name=\"twitter:site\" content=\"@BubblePlan\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"Ghita\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"23 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/\"},\"author\":{\"name\":\"Ghita\",\"@id\":\"https:\/\/bubbleplan.net\/blog\/#\/schema\/person\/1cb3feabba25d0047f221b83366c726f\"},\"headline\":\"Excel pour la gestion de projet : quand faut-il changer d&rsquo;outil ?\",\"datePublished\":\"2026-11-23T09:00:00+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/\"},\"wordCount\":1521,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/bubbleplan.net\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2026\/10\/quand-changer-outil.png\",\"keywords\":[\"Pilotage\",\"Management\",\"gestion de projet\",\"excel\",\"fonctionnalit\u00e9 experte\",\"alternative excel\"],\"articleSection\":[\"Management\",\"Conduite de projet\"],\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/#respond\"]}]},{\"@type\":[\"WebPage\",\"FAQPage\"],\"@id\":\"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/\",\"url\":\"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/\",\"name\":\"Excel pour la gestion de projet : quand changer d'outil ?\",\"isPartOf\":{\"@id\":\"https:\/\/bubbleplan.net\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2026\/10\/quand-changer-outil.png\",\"datePublished\":\"2026-11-23T09:00:00+00:00\",\"description\":\"Versions divergentes, reporting manuel, ressources surcharg\u00e9es : d\u00e9couvrez 8 signes qu\u2019Excel limite vos projets et comment changer d\u2019outil.\",\"breadcrumb\":{\"@id\":\"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/#breadcrumb\"},\"mainEntity\":[{\"@id\":\"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/#faq-question-1793283604590\"},{\"@id\":\"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/#faq-question-1793283635890\"},{\"@id\":\"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/#faq-question-1793283648664\"},{\"@id\":\"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/#faq-question-1793283661272\"},{\"@id\":\"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/#faq-question-1793283679865\"}],\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/#primaryimage\",\"url\":\"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2026\/10\/quand-changer-outil.png\",\"contentUrl\":\"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2026\/10\/quand-changer-outil.png\",\"width\":1200,\"height\":800,\"caption\":\"connaitre les limites des outils de gestion de projet\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Blog\",\"item\":\"https:\/\/bubbleplan.net\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Management\",\"item\":\"https:\/\/bubbleplan.net\/blog\/category\/management\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Excel pour la gestion de projet : quand faut-il changer d&rsquo;outil ?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/bubbleplan.net\/blog\/#website\",\"url\":\"https:\/\/bubbleplan.net\/blog\/\",\"name\":\"Bubble Plan : blog de la Gestion de Projet efficace et collaborative\",\"description\":\"Toute l&#039;actualit\u00e9 de la gestion de projet et du collaboratif, avec Bubble Plan\",\"publisher\":{\"@id\":\"https:\/\/bubbleplan.net\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/bubbleplan.net\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/bubbleplan.net\/blog\/#organization\",\"name\":\"Bubble Plan\",\"url\":\"https:\/\/bubbleplan.net\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/bubbleplan.net\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2021\/06\/Logo-Bubble-Plan-72-dpi-1024x352-1.jpg\",\"contentUrl\":\"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2021\/06\/Logo-Bubble-Plan-72-dpi-1024x352-1.jpg\",\"width\":1024,\"height\":352,\"caption\":\"Bubble Plan\"},\"image\":{\"@id\":\"https:\/\/bubbleplan.net\/blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/bubbleplan\",\"https:\/\/x.com\/BubblePlan\",\"https:\/\/www.linkedin.com\/company\/bubbleplan\",\"https:\/\/www.youtube.com\/channel\/UCDb4feDzsa4fCd_vR5HZJgg\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/bubbleplan.net\/blog\/#\/schema\/person\/1cb3feabba25d0047f221b83366c726f\",\"name\":\"Ghita\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/bubbleplan.net\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/d8c2856b9db25d8c39f2d37f6b2d7e56?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/d8c2856b9db25d8c39f2d37f6b2d7e56?s=96&d=mm&r=g\",\"caption\":\"Ghita\"},\"description\":\"Ghita pilote le blog avec passion et exigence, en tant que sp\u00e9cialiste de Bubble Plan. Toujours \u00e0 l\u2019aff\u00fbt de nouveaux sujets, elle aime creuser les th\u00e9matiques en profondeur pour offrir des contenus \u00e0 la fois experts, clairs et utiles. Son objectif : guider les utilisateurs de Bubble Plan, leur simplifier la gestion de projet et les aider \u00e0 prendre en main l\u2019outil en toute confiance. N'h\u00e9sitez pas \u00e0 la suivre sur LinkedIn.\",\"sameAs\":[\"https:\/\/www.linkedin.com\/in\/ghitaecharrabcommunication\/\"],\"url\":\"https:\/\/bubbleplan.net\/blog\/author\/ghita\/\"},{\"@type\":\"Question\",\"@id\":\"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/#faq-question-1793283604590\",\"position\":1,\"url\":\"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/#faq-question-1793283604590\",\"name\":\"Peut-on faire de la gestion de projet avec Excel ?\u00a0\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Oui, pour un projet simple, port\u00e9 par une personne ou une petite \u00e9quipe. Excel permet de lister des t\u00e2ches, de poser des dates et de dessiner un Gantt basique.<strong> Il devient limit\u00e9 <\/strong>d\u00e8s qu'il faut g\u00e9rer plusieurs projets, des ressources partag\u00e9es ou des d\u00e9pendances.\",\"inLanguage\":\"fr-FR\"},\"inLanguage\":\"fr-FR\"},{\"@type\":\"Question\",\"@id\":\"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/#faq-question-1793283635890\",\"position\":2,\"url\":\"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/#faq-question-1793283635890\",\"name\":\"Quelles sont les limites d'Excel en gestion de projet ?\u00a0\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Les principales sont les suivantes : versions concurrentes des fichiers, d\u00e9pendances entre t\u00e2ches \u00e0 maintenir \u00e0 la main, aucune vue de charge sur plusieurs projets, reporting consolid\u00e9 \u00e0 la main et collaboration hors du fichier.\",\"inLanguage\":\"fr-FR\"},\"inLanguage\":\"fr-FR\"},{\"@type\":\"Question\",\"@id\":\"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/#faq-question-1793283648664\",\"position\":3,\"url\":\"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/#faq-question-1793283648664\",\"name\":\"\u00c0 partir de combien de projets faut-il quitter Excel ?\u00a0\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Il n'existe pas de seuil unique. En pratique, la bascule devient rentable d\u00e8s que des personnes travaillent sur plusieurs projets \u00e0 la fois.\",\"inLanguage\":\"fr-FR\"},\"inLanguage\":\"fr-FR\"},{\"@type\":\"Question\",\"@id\":\"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/#faq-question-1793283661272\",\"position\":4,\"url\":\"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/#faq-question-1793283661272\",\"name\":\"Par quoi remplacer Excel pour g\u00e9rer ses projets ?\u00a0\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Par un logiciel de gestion de projet qui centralise les plannings, calcule les d\u00e9pendances, montre la charge de chacun et g\u00e9n\u00e8re les tableaux de bord. Plusieurs logiciels, dont Bubble Plan, proposent une offre gratuite pour tester.\",\"inLanguage\":\"fr-FR\"},\"inLanguage\":\"fr-FR\"},{\"@type\":\"Question\",\"@id\":\"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/#faq-question-1793283679865\",\"position\":5,\"url\":\"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/#faq-question-1793283679865\",\"name\":\"Peut-on importer ses fichiers Excel dans un logiciel de gestion de projet ?\u00a0\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Oui, la plupart des logiciels proposent un import. Dans Bubble Plan, Excel fait partie des int\u00e9grations disponibles.\",\"inLanguage\":\"fr-FR\"},\"inLanguage\":\"fr-FR\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Excel pour la gestion de projet : quand changer d'outil ?","description":"Versions divergentes, reporting manuel, ressources surcharg\u00e9es : d\u00e9couvrez 8 signes qu\u2019Excel limite vos projets et comment changer d\u2019outil.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/","og_locale":"fr_FR","og_type":"article","og_title":"Excel pour la gestion de projet : quand changer d'outil ?","og_description":"Versions divergentes, reporting manuel, ressources surcharg\u00e9es : d\u00e9couvrez 8 signes qu\u2019Excel limite vos projets et comment changer d\u2019outil.","og_url":"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/","og_site_name":"Bubble Plan : blog de la Gestion de Projet efficace et collaborative","article_publisher":"https:\/\/www.facebook.com\/bubbleplan","article_published_time":"2026-11-23T09:00:00+00:00","og_image":[{"width":1200,"height":800,"url":"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2026\/10\/quand-changer-outil.png","type":"image\/png"}],"author":"Ghita","twitter_card":"summary_large_image","twitter_creator":"@BubblePlan","twitter_site":"@BubblePlan","twitter_misc":{"\u00c9crit par":"Ghita","Dur\u00e9e de lecture estim\u00e9e":"23 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/#article","isPartOf":{"@id":"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/"},"author":{"name":"Ghita","@id":"https:\/\/bubbleplan.net\/blog\/#\/schema\/person\/1cb3feabba25d0047f221b83366c726f"},"headline":"Excel pour la gestion de projet : quand faut-il changer d&rsquo;outil ?","datePublished":"2026-11-23T09:00:00+00:00","mainEntityOfPage":{"@id":"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/"},"wordCount":1521,"commentCount":0,"publisher":{"@id":"https:\/\/bubbleplan.net\/blog\/#organization"},"image":{"@id":"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/#primaryimage"},"thumbnailUrl":"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2026\/10\/quand-changer-outil.png","keywords":["Pilotage","Management","gestion de projet","excel","fonctionnalit\u00e9 experte","alternative excel"],"articleSection":["Management","Conduite de projet"],"inLanguage":"fr-FR","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/#respond"]}]},{"@type":["WebPage","FAQPage"],"@id":"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/","url":"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/","name":"Excel pour la gestion de projet : quand changer d'outil ?","isPartOf":{"@id":"https:\/\/bubbleplan.net\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/#primaryimage"},"image":{"@id":"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/#primaryimage"},"thumbnailUrl":"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2026\/10\/quand-changer-outil.png","datePublished":"2026-11-23T09:00:00+00:00","description":"Versions divergentes, reporting manuel, ressources surcharg\u00e9es : d\u00e9couvrez 8 signes qu\u2019Excel limite vos projets et comment changer d\u2019outil.","breadcrumb":{"@id":"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/#breadcrumb"},"mainEntity":[{"@id":"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/#faq-question-1793283604590"},{"@id":"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/#faq-question-1793283635890"},{"@id":"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/#faq-question-1793283648664"},{"@id":"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/#faq-question-1793283661272"},{"@id":"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/#faq-question-1793283679865"}],"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/#primaryimage","url":"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2026\/10\/quand-changer-outil.png","contentUrl":"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2026\/10\/quand-changer-outil.png","width":1200,"height":800,"caption":"connaitre les limites des outils de gestion de projet"},{"@type":"BreadcrumbList","@id":"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Blog","item":"https:\/\/bubbleplan.net\/blog\/"},{"@type":"ListItem","position":2,"name":"Management","item":"https:\/\/bubbleplan.net\/blog\/category\/management\/"},{"@type":"ListItem","position":3,"name":"Excel pour la gestion de projet : quand faut-il changer d&rsquo;outil ?"}]},{"@type":"WebSite","@id":"https:\/\/bubbleplan.net\/blog\/#website","url":"https:\/\/bubbleplan.net\/blog\/","name":"Bubble Plan : blog de la Gestion de Projet efficace et collaborative","description":"Toute l&#039;actualit\u00e9 de la gestion de projet et du collaboratif, avec Bubble Plan","publisher":{"@id":"https:\/\/bubbleplan.net\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/bubbleplan.net\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/bubbleplan.net\/blog\/#organization","name":"Bubble Plan","url":"https:\/\/bubbleplan.net\/blog\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/bubbleplan.net\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2021\/06\/Logo-Bubble-Plan-72-dpi-1024x352-1.jpg","contentUrl":"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2021\/06\/Logo-Bubble-Plan-72-dpi-1024x352-1.jpg","width":1024,"height":352,"caption":"Bubble Plan"},"image":{"@id":"https:\/\/bubbleplan.net\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/bubbleplan","https:\/\/x.com\/BubblePlan","https:\/\/www.linkedin.com\/company\/bubbleplan","https:\/\/www.youtube.com\/channel\/UCDb4feDzsa4fCd_vR5HZJgg"]},{"@type":"Person","@id":"https:\/\/bubbleplan.net\/blog\/#\/schema\/person\/1cb3feabba25d0047f221b83366c726f","name":"Ghita","image":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/bubbleplan.net\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/d8c2856b9db25d8c39f2d37f6b2d7e56?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d8c2856b9db25d8c39f2d37f6b2d7e56?s=96&d=mm&r=g","caption":"Ghita"},"description":"Ghita pilote le blog avec passion et exigence, en tant que sp\u00e9cialiste de Bubble Plan. Toujours \u00e0 l\u2019aff\u00fbt de nouveaux sujets, elle aime creuser les th\u00e9matiques en profondeur pour offrir des contenus \u00e0 la fois experts, clairs et utiles. Son objectif : guider les utilisateurs de Bubble Plan, leur simplifier la gestion de projet et les aider \u00e0 prendre en main l\u2019outil en toute confiance. N'h\u00e9sitez pas \u00e0 la suivre sur LinkedIn.","sameAs":["https:\/\/www.linkedin.com\/in\/ghitaecharrabcommunication\/"],"url":"https:\/\/bubbleplan.net\/blog\/author\/ghita\/"},{"@type":"Question","@id":"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/#faq-question-1793283604590","position":1,"url":"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/#faq-question-1793283604590","name":"Peut-on faire de la gestion de projet avec Excel ?\u00a0","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"Oui, pour un projet simple, port\u00e9 par une personne ou une petite \u00e9quipe. Excel permet de lister des t\u00e2ches, de poser des dates et de dessiner un Gantt basique.<strong> Il devient limit\u00e9 <\/strong>d\u00e8s qu'il faut g\u00e9rer plusieurs projets, des ressources partag\u00e9es ou des d\u00e9pendances.","inLanguage":"fr-FR"},"inLanguage":"fr-FR"},{"@type":"Question","@id":"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/#faq-question-1793283635890","position":2,"url":"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/#faq-question-1793283635890","name":"Quelles sont les limites d'Excel en gestion de projet ?\u00a0","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"Les principales sont les suivantes : versions concurrentes des fichiers, d\u00e9pendances entre t\u00e2ches \u00e0 maintenir \u00e0 la main, aucune vue de charge sur plusieurs projets, reporting consolid\u00e9 \u00e0 la main et collaboration hors du fichier.","inLanguage":"fr-FR"},"inLanguage":"fr-FR"},{"@type":"Question","@id":"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/#faq-question-1793283648664","position":3,"url":"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/#faq-question-1793283648664","name":"\u00c0 partir de combien de projets faut-il quitter Excel ?\u00a0","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"Il n'existe pas de seuil unique. En pratique, la bascule devient rentable d\u00e8s que des personnes travaillent sur plusieurs projets \u00e0 la fois.","inLanguage":"fr-FR"},"inLanguage":"fr-FR"},{"@type":"Question","@id":"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/#faq-question-1793283661272","position":4,"url":"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/#faq-question-1793283661272","name":"Par quoi remplacer Excel pour g\u00e9rer ses projets ?\u00a0","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"Par un logiciel de gestion de projet qui centralise les plannings, calcule les d\u00e9pendances, montre la charge de chacun et g\u00e9n\u00e8re les tableaux de bord. Plusieurs logiciels, dont Bubble Plan, proposent une offre gratuite pour tester.","inLanguage":"fr-FR"},"inLanguage":"fr-FR"},{"@type":"Question","@id":"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/#faq-question-1793283679865","position":5,"url":"https:\/\/bubbleplan.net\/blog\/excel-pour-la-gestion-de-projet-quand-faut-il-changer-doutil\/#faq-question-1793283679865","name":"Peut-on importer ses fichiers Excel dans un logiciel de gestion de projet ?\u00a0","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"Oui, la plupart des logiciels proposent un import. Dans Bubble Plan, Excel fait partie des int\u00e9grations disponibles.","inLanguage":"fr-FR"},"inLanguage":"fr-FR"}]}},"_links":{"self":[{"href":"https:\/\/bubbleplan.net\/blog\/wp-json\/wp\/v2\/posts\/18804","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bubbleplan.net\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bubbleplan.net\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bubbleplan.net\/blog\/wp-json\/wp\/v2\/users\/14"}],"replies":[{"embeddable":true,"href":"https:\/\/bubbleplan.net\/blog\/wp-json\/wp\/v2\/comments?post=18804"}],"version-history":[{"count":1,"href":"https:\/\/bubbleplan.net\/blog\/wp-json\/wp\/v2\/posts\/18804\/revisions"}],"predecessor-version":[{"id":18809,"href":"https:\/\/bubbleplan.net\/blog\/wp-json\/wp\/v2\/posts\/18804\/revisions\/18809"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/bubbleplan.net\/blog\/wp-json\/wp\/v2\/media\/18834"}],"wp:attachment":[{"href":"https:\/\/bubbleplan.net\/blog\/wp-json\/wp\/v2\/media?parent=18804"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bubbleplan.net\/blog\/wp-json\/wp\/v2\/categories?post=18804"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bubbleplan.net\/blog\/wp-json\/wp\/v2\/tags?post=18804"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}