{"id":4342,"date":"2026-03-16T15:27:10","date_gmt":"2026-03-16T14:27:10","guid":{"rendered":"https:\/\/bubbleplan.net\/blog\/?p=4342"},"modified":"2026-03-16T15:47:07","modified_gmt":"2026-03-16T14:47:07","slug":"methode-moscow-prioriser-taches","status":"publish","type":"post","link":"https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/","title":{"rendered":"M\u00e9thode MoSCoW : apprenez \u00e0 prioriser vos t\u00e2ches"},"content":{"rendered":"\n\n<div class=\"kk-star-ratings kksr-auto kksr-align-left kksr-valign-top\"\n    data-payload='{&quot;align&quot;:&quot;left&quot;,&quot;id&quot;:&quot;4342&quot;,&quot;slug&quot;:&quot;default&quot;,&quot;valign&quot;:&quot;top&quot;,&quot;ignore&quot;:&quot;&quot;,&quot;reference&quot;:&quot;auto&quot;,&quot;class&quot;:&quot;&quot;,&quot;count&quot;:&quot;37&quot;,&quot;legendonly&quot;:&quot;&quot;,&quot;readonly&quot;:&quot;&quot;,&quot;score&quot;:&quot;4.9&quot;,&quot;starsonly&quot;:&quot;&quot;,&quot;best&quot;:&quot;5&quot;,&quot;gap&quot;:&quot;0&quot;,&quot;greet&quot;:&quot;Votre avis est essentiel !&quot;,&quot;legend&quot;:&quot;4.9\\\/5 - (37 votes)&quot;,&quot;size&quot;:&quot;20&quot;,&quot;title&quot;:&quot;M\u00e9thode MoSCoW : apprenez \u00e0 prioriser vos t\u00e2ches&quot;,&quot;width&quot;:&quot;98&quot;,&quot;_legend&quot;:&quot;{score}\\\/{best} - ({count} {votes})&quot;,&quot;font_factor&quot;:&quot;1.25&quot;}'>\n            \n<div class=\"kksr-stars\">\n    \n<div class=\"kksr-stars-inactive\">\n            <div class=\"kksr-star\" data-star=\"1\" style=\"padding-right: 0px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 20px; height: 20px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"2\" style=\"padding-right: 0px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 20px; height: 20px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"3\" style=\"padding-right: 0px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 20px; height: 20px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"4\" style=\"padding-right: 0px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 20px; height: 20px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"5\" style=\"padding-right: 0px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 20px; height: 20px;\"><\/div>\n        <\/div>\n    <\/div>\n    \n<div class=\"kksr-stars-active\" style=\"width: 98px;\">\n            <div class=\"kksr-star\" style=\"padding-right: 0px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 20px; height: 20px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 0px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 20px; height: 20px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 0px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 20px; height: 20px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 0px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 20px; height: 20px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 0px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 20px; height: 20px;\"><\/div>\n        <\/div>\n    <\/div>\n<\/div>\n                \n\n<div class=\"kksr-legend\" style=\"font-size: 16px;\">\n            4.9\/5 - (37 votes)    <\/div>\n    <\/div>\n\n<p>Parmi les nombreuses approches de gestion, comme Agile, Scrum, Waterfall, WBS, la m\u00e9thode MoSCoW se distingue et est tr\u00e8s appr\u00e9ci\u00e9 par les \u00e9quipes dans le d\u00e9veloppement de produits logiciels. D\u2019autres approches viennent ensuite compl\u00e9ter ces m\u00e9thodologies.<\/p>\n\n\n\n<p>Cette approche se d\u00e9compose en quatre cat\u00e9gories : <\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Must have<\/strong> (essentiel),<\/li>\n\n\n\n<li><strong>Should have<\/strong> (souhaitable),<\/li>\n\n\n\n<li><strong>Could have<\/strong> (confort),<\/li>\n\n\n\n<li>et <strong>Won&rsquo;t have<\/strong> (exclu).<\/li>\n<\/ul>\n\n\n\n<p>D\u00e9velopp\u00e9e par <strong>Dai Clegg<\/strong>, elle permet de prioriser les exigences et fonctionnalit\u00e9s selon leur valeur pour le client, tout en g\u00e9rant efficacement le temps et les ressources disponibles de l&rsquo;\u00e9quipe.<\/p>\n\n\n\n<p>Si vous cherchez un <strong>guide simple<\/strong> pour optimiser votre backlog et l&rsquo;am\u00e9lioration continue de vos produits, ce mod\u00e8le est peut-\u00eatre la solution !<\/p>\n\n\n\n<div class=\"wp-block-group bbp-block-resume\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<p><strong>Ce qu\u2019il faut retenir<\/strong><\/p>\n\n\n\n<p>La m\u00e9thode MoSCoW est une technique de priorisation qui classe les t\u00e2ches en quatre cat\u00e9gories : Must, Should, Could et Won\u2019t. Elle est utilis\u00e9e en gestion de projet et en Agile pour d\u00e9finir les fonctionnalit\u00e9s prioritaires d\u2019un produit et optimiser l\u2019allocation des ressources.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Elle a \u00e9t\u00e9 cr\u00e9\u00e9e en 1994 par Dai Clegg, dans le cadre de la m\u00e9thode DSDM.<\/li>\n\n\n\n<li>Elle s&rsquo;applique en gestion de projet, en Agile, pour prioriser un backlog, cadrer un MVP ou arbitrer sous contraintes.<\/li>\n\n\n\n<li>Sa limite principale : l&rsquo;absence de crit\u00e8res objectifs, qui peut mener \u00e0 surcharger les cat\u00e9gories Must et Should.<\/li>\n\n\n\n<li>\u00c0 ne pas confondre avec la matrice Eisenhower : MoSCoW priorise des fonctionnalit\u00e9s produit, Eisenhower g\u00e8re l&rsquo;urgence du quotidien.<\/li>\n<\/ul>\n<\/div><\/div>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter\"><img decoding=\"async\" width=\"834\" height=\"521\" src=\"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2021\/04\/moscow-acronyme.jpg\" alt=\"moscow acronyme signification\" class=\"wp-image-4348\" title=\"moscow acronyme signification\" srcset=\"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2021\/04\/moscow-acronyme.jpg 834w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2021\/04\/moscow-acronyme-300x187.jpg 300w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2021\/04\/moscow-acronyme-768x480.jpg 768w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2021\/04\/moscow-acronyme-640x400.jpg 640w\" sizes=\"(max-width: 834px) 100vw, 834px\" loading=\"lazy\" \/><\/figure><\/div>\n\n\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_71 ez-toc-wrap-center counter-hierarchy ez-toc-counter ez-toc-transparent ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<span class=\"ez-toc-title\" style=\"cursor:inherit\">SOMMAIRE<\/span>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/#quest-ce-que-la-methode-moscow\" title=\"Qu&rsquo;est-ce que la m\u00e9thode MoSCoW ?\">Qu&rsquo;est-ce que la m\u00e9thode MoSCoW ?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/#quest-ce-que-cela-signifie-concretement-%c2%ab-moscow-%c2%bb\" title=\"Qu&rsquo;est-ce que cela signifie concr\u00e8tement \u00ab MoSCoW \u00bb ?\">Qu&rsquo;est-ce que cela signifie concr\u00e8tement \u00ab MoSCoW \u00bb ?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/#4-etapes-pour-utiliser-et-mettre-en-place-la-methode\" title=\"4 \u00e9tapes pour utiliser et mettre en place la m\u00e9thode\">4 \u00e9tapes pour utiliser et mettre en place la m\u00e9thode<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/#quand-utiliser-la-methode-moscow-dans-un-projet\" title=\"Quand utiliser la m\u00e9thode MoSCoW dans un projet ?\">Quand utiliser la m\u00e9thode MoSCoW dans un projet ?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/#exemple-concret-de-priorisation-avec-la-methode-moscow\" title=\"Exemple concret de priorisation avec la m\u00e9thode MoSCoW\">Exemple concret de priorisation avec la m\u00e9thode MoSCoW<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/#quels-sont-ses-avantages-autres-que-la-priorisation-des-taches-et-des-exigences\" title=\"Quels sont ses avantages, autres que la priorisation des t\u00e2ches et des exigences ?\">Quels sont ses avantages, autres que la priorisation des t\u00e2ches et des exigences ?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/#et-ses-limites-dutilisation\" title=\"Et ses limites d&rsquo;utilisation ?\">Et ses limites d&rsquo;utilisation ?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/#moscow-ou-matrice-eisenhower-quelle-difference\" title=\"MoSCoW ou matrice Eisenhower : quelle diff\u00e9rence ?\">MoSCoW ou matrice Eisenhower : quelle diff\u00e9rence ?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/#la-methode-de-priorisation-moscow-pour-optimiser-la-liste-des-taches-dun-projet\" title=\"La m\u00e9thode de priorisation MoSCoW pour optimiser la liste des t\u00e2ches d&rsquo;un projet\">La m\u00e9thode de priorisation MoSCoW pour optimiser la liste des t\u00e2ches d&rsquo;un projet<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/#quel-outil-utiliser-pour-appliquer-la-methode-moscow\" title=\"Quel outil utiliser pour appliquer la m\u00e9thode MoSCoW ?\">Quel outil utiliser pour appliquer la m\u00e9thode MoSCoW ?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/#faq-sur-la-methode-moscow\" title=\"FAQ sur la m\u00e9thode MoSCoW\">FAQ sur la m\u00e9thode MoSCoW<\/a><\/li><\/ul><\/nav><\/div>\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"quest-ce-que-la-methode-moscow\"><\/span>Qu&rsquo;est-ce que la m\u00e9thode MoSCoW ?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>Le <a href=\"https:\/\/fr.wikipedia.org\/wiki\/M%C3%A9thode_MoSCoW\" target=\"_blank\" rel=\"noreferrer noopener\">mod\u00e8le MoSCoW<\/a> nous vient d&rsquo;Angleterre, cr\u00e9\u00e9 en 1994 par Dai Clegg, expert en d\u00e9veloppement logiciel chez Oracle UK. Il a \u00e9t\u00e9 d\u00e9velopp\u00e9 dans le cadre de la m\u00e9thode DSM (Dynamic Systems Development Method) pour aider les \u00e9quipes \u00e0 hi\u00e9rarchiser efficacement leurs exigences.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/bubbleplan.net\/creer-un-compte-gratuit\"><img decoding=\"async\" width=\"2911\" height=\"1008\" src=\"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bubble-plan-2911x1008.png\" alt=\"appel \u00e0 l'action pour s'inscrire sur bubble plan\" class=\"wp-image-14853\" srcset=\"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bubble-plan-2911x1008.png 2911w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bubble-plan-528x183.png 528w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bubble-plan-768x266.png 768w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bubble-plan-1536x532.png 1536w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bubble-plan-2048x709.png 2048w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bubble-plan-440x152.png 440w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bubble-plan-320x111.png 320w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bubble-plan-1400x485.png 1400w\" sizes=\"(max-width: 2911px) 100vw, 2911px\" loading=\"lazy\" \/><\/a><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Le principe de cette m\u00e9thode<\/h3>\n\n\n\n<p>Le principe ? Classer chaque \u00e9l\u00e9ment selon son niveau de criticit\u00e9 pour le produit. Cette approche vous permet de distinguer ce qui est essentiel de ce qui est souhaitable, en vous demandant syst\u00e9matiquement : pourquoi prioriser cet \u00e9l\u00e9ment plut\u00f4t qu&rsquo;un autre ?<\/p>\n\n\n\n<p>Ce guide s&rsquo;applique \u00e0 de nombreux contextes : fonctionnalit\u00e9s produit, exigences techniques, user stories, crit\u00e8res de test&#8230; Il facilite la gestion du backlog et l&rsquo;allocation des ressources de l&rsquo;\u00e9quipe, particuli\u00e8rement dans les initiatives agiles \u00e0 court terme o\u00f9 les d\u00e9cisions rapides sont cruciales.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"quest-ce-que-cela-signifie-concretement-%c2%ab-moscow-%c2%bb\"><\/span>Qu&rsquo;est-ce que cela signifie concr\u00e8tement \u00ab MoSCoW \u00bb ?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>Son nom est un acronyme anglais, dans lequel les \u00ab \ud83c\udd7e \u00bb sont seulement pr\u00e9sents pour cr\u00e9er un moyen m\u00e9motechnique.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">\ud83c\udd7c : \u00ab Must have \u00bb<\/h3>\n\n\n\n<p>Les <strong>t\u00e2ches prioritaires<\/strong> qui <strong>doivent \u00eatre trait\u00e9es en premier<\/strong>. Elles sont vitales \u00e0 la r\u00e9ussite du projet et \u00e0 sa r\u00e9alisation dans les d\u00e9lais impartis.<\/p>\n\n\n\n<p>C\u2019est pourquoi il est primordial de commencer par traiter ces t\u00e2ches avant toutes les autres. La non-r\u00e9alisation d\u2019une d\u2019entre elles entrainerait l\u2019\u00e9chec du projet.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>\ud83c\udd82 <\/strong>: \u00ab Should have \u00bb<\/h3>\n\n\n\n<p>Les <strong>t\u00e2ches essentielles<\/strong> \u00e0 traiter uniquement apr\u00e8s avoir termin\u00e9 celles prioritaires. Elles ont bien s\u00fbr leur importance et apportent une r\u00e9elle valeur ajout\u00e9e au projet. R\u00e9alisez-les d\u00e8s que possible.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">\ud83c\udd72 : \u00ab Could have \u00bb<\/h3>\n\n\n\n<p>Les <strong>t\u00e2ches de confort<\/strong>, \u00e0 traiter si leur r\u00e9alisation n\u2019a <strong>pas d\u2019incidence sur celles urgentes\/prioritaires<\/strong>.<\/p>\n\n\n\n<p>Elles peuvent \u00eatre consid\u00e9r\u00e9es comme des t\u00e2ches \u00ab en option \u00bb, comme la cerise sur le g\u00e2teau de votre projet. De plus, leur non-r\u00e9alisation n\u2019aura que de faibles cons\u00e9quences, voire aucune.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">\ud83c\udd86 : \u00ab Won\u2019t have \u00bb<\/h3>\n\n\n\n<p>Les<strong> t\u00e2ches non-r\u00e9alisables <\/strong>ou <strong>abandonn\u00e9es <\/strong>pour le moment, pour diff\u00e9rentes raisons pouvant \u00eatre : le manque de <a href=\"https:\/\/bubbleplan.net\/blog\/fonction-budget-projets\/\">budget<\/a>, de temps, de savoir-faire, \u2026 Elles peuvent cependant \u00eatre r\u00e9alis\u00e9es lors d\u2019un <a href=\"https:\/\/bubbleplan.net\/blog\/creer-un-projet-planning\/\">nouveau projet<\/a>.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Cat\u00e9gorie<\/th><th>Signification<\/th><th>Exemple<\/th><\/tr><\/thead><tbody><tr><td>Must<\/td><td>indispensable<\/td><td>paiement en ligne<\/td><\/tr><tr><td>Should<\/td><td>important<\/td><td>notifications<\/td><\/tr><tr><td>Could<\/td><td>optionnel<\/td><td>personnalisation<\/td><\/tr><tr><td>Won\u2019t<\/td><td>plus tard<\/td><td>fonctionnalit\u00e9s futures<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"4-etapes-pour-utiliser-et-mettre-en-place-la-methode\"><\/span>4 \u00e9tapes pour utiliser et mettre en place la m\u00e9thode<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>C&rsquo;est une m\u00e9thode simple et rapide \u00e0 mettre en place. En effet, elle se r\u00e9alise en <strong>4 \u00e9tapes cl\u00e9s<\/strong>&nbsp;:<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">1 &#8211; La constitution de votre \u00e9quipe de travail<\/h3>\n\n\n\n<p>Choisissez les diff\u00e9rents membres qui constitueront votre \u00e9quipe. Vous devez s\u00e9lectionner des repr\u00e9sentants pour chacune des parties prenantes du projet. Vous pouvez vous r\u00e9unir sous la forme d\u2019un atelier et ainsi leur expliquer de quoi il s\u2019agit, s\u00e9lectionner la liste des points prioritaires et d\u00e9finir comment vous allez travailler ensemble.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">2 &#8211; Lister les \u00e9l\u00e9ments \u00e0 classer\/hi\u00e9rarchiser <\/h3>\n\n\n\n<p>Ici, vous devez \u00e9tablir ensemble un inventaire de toutes les t\u00e2ches \u00e0 accomplir. Quand je dis toutes, c\u2019est bien toutes, m\u00eame celles qui ne vous para\u00eetraient que secondaires voire futiles. A ce stade on recherche l&rsquo;exhaustivit\u00e9, d&rsquo;o\u00f9 l&rsquo;importance d&rsquo;impliquer tous les acteurs.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">3 &#8211; La priorisation de vos t\u00e2ches selon l&rsquo;approche<\/h3>\n\n\n\n<p>Maintenant vous passez \u00e0 l\u2019\u00e9tape de hi\u00e9rarchisation. Pour chacun des points de votre liste, vous devez les affecter \u00e0 une cat\u00e9gorie. Cette \u00e9tape est <a href=\"https:\/\/bubbleplan.net\/outil-collaboratif\">un travail collaboratif<\/a> : il est important que tous les <a href=\"https:\/\/bubbleplan.net\/blog\/utiliser-les-intervenants-bubble-plan\/\">intervenants<\/a> participent, afin de prendre en compte les avis de chacun. Vous pouvez utiliser des couleurs diff\u00e9rentes afin de mieux visualiser les diff\u00e9rentes cat\u00e9gories.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">4 &#8211; La relecture et la validation<\/h3>\n\n\n\n<p>Une fois que vous avez class\u00e9 toutes vos t\u00e2ches, revoyez ensemble le travail qui vient d\u2019\u00eatre r\u00e9alis\u00e9. Vous pourrez ainsi estimer si la <a href=\"https:\/\/bubbleplan.net\/blog\/gestion-charge-avancee\/\">charge<\/a> est tenable et en ad\u00e9quation avec les objectifs et contraintes fix\u00e9es au d\u00e9but du projet. Une fois cette relecture effectu\u00e9e, vous pouvez valider le tout et vous lancer dans la r\u00e9alisation des diff\u00e9rentes t\u00e2ches.<\/p>\n\n\n\n<p>Pour mettre en \u0153uvre les diff\u00e9rentes \u00e9tapes de la m\u00e9thode MoSCoW, vous pouvez utiliser un <a href=\"https:\/\/bubbleplan.net\/blog\/methode-kanban-management-visuel\/\">tableau blanc r\u00e9el ou virtuel<\/a>, des \u00ab post-it \u00bb, un tableur Excel, ou vous appuyer sur un <a href=\"https:\/\/bubbleplan.net\">logiciel de gestion de projet<\/a> pour obtenir une meilleure <a href=\"https:\/\/bubbleplan.net\/blog\/le-marqueur-vertical-comme-nouveau-referentiel-de-management-visuel\/\">repr\u00e9sentation visuelle<\/a>.<\/p>\n\n\n\n<p>Pas si \u00e9loign\u00e9e du <a href=\"https:\/\/www.youtube.com\/watch?v=qdSQGtJxnDQ\" target=\"_blank\" rel=\"noreferrer noopener\">Kanban<\/a>, il est sans doute possible d&rsquo;en d\u00e9tourner les <a href=\"https:\/\/bubbleplan.net\/pedagogie-projet\/methode-kanban\/logiciels-methode-kanban\">logiciels phares<\/a>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"quand-utiliser-la-methode-moscow-dans-un-projet\"><\/span>Quand utiliser la m\u00e9thode MoSCoW dans un projet ?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>Cette m\u00e9thode s&rsquo;applique d\u00e8s que vous devez arbitrer entre plusieurs fonctionnalit\u00e9s ou t\u00e2ches avec des ressources limit\u00e9es. Voici les trois contextes o\u00f9 elle apporte le plus de valeur.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"> 1 &#8211; Prioriser un backlog produit<\/h3>\n\n\n\n<p>Lorsque le <a href=\"https:\/\/bubbleplan.net\/blog\/creer-et-gerer-un-sprint-backlog-mise-en-place-pratique-exemples\/\">backlog<\/a> s&rsquo;allonge et que chaque partie prenante d\u00e9fend ses propres priorit\u00e9s, MoSCoW offre un cadre commun pour trancher. Chaque fonctionnalit\u00e9 est class\u00e9e selon sa valeur m\u00e9tier r\u00e9elle, et non selon l&rsquo;influence de celui qui la demande. <strong>R\u00e9sultat <\/strong>: une roadmap lisible, accept\u00e9e par tous, o\u00f9 l&rsquo;\u00e9quipe sait exactement sur quoi concentrer ses efforts lors du prochain sprint.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">2 &#8211; Arbitrer entre contraintes de budget et de d\u00e9lai<\/h3>\n\n\n\n<p>MoSCoW permet <strong>de distinguer ce qui est non n\u00e9gociable<\/strong> (Must have) de <strong>ce qui peut \u00eatre report\u00e9 sans compromettre la valeur livr\u00e9e<\/strong> (Should have, Could have). C&rsquo;est un outil de n\u00e9gociation concret avec les sponsors et les clients : plut\u00f4t que de ren\u00e9gocier le p\u00e9rim\u00e8tre dans l&rsquo;urgence, les arbitrages ont d\u00e9j\u00e0 \u00e9t\u00e9 anticip\u00e9s.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">3 &#8211; Organiser un MVP<\/h3>\n\n\n\n<p>Un MVP (Minimum Viable Product) doit embarquer le strict n\u00e9cessaire pour valider une hypoth\u00e8se m\u00e9tier, pas plus. MoSCoW aide \u00e0 d\u00e9finir ce p\u00e9rim\u00e8tre minimal en for\u00e7ant l&rsquo;\u00e9quipe \u00e0 se poser la bonne question : sans cette fonctionnalit\u00e9, le produit perd-il toute valeur ? Tout ce qui r\u00e9pond \u00ab\u00a0non\u00a0\u00bb sort du MVP. Les Must have constituent le c\u0153ur du produit livrable, les autres cat\u00e9gories alimentent les it\u00e9rations suivantes.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"exemple-concret-de-priorisation-avec-la-methode-moscow\"><\/span>Exemple concret de priorisation avec la m\u00e9thode MoSCoW<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th><strong>T\u00e2che<\/strong><\/th><th><strong>Priorit\u00e9 MoSCoW<\/strong><\/th><th><strong>Pourquoi<\/strong><\/th><\/tr><\/thead><tbody><tr><td>D\u00e9veloppement login<\/td><td>Must<\/td><td>Fonction indispensable<\/td><\/tr><tr><td>Notifications email<\/td><td>Should<\/td><td>Am\u00e9liore l\u2019exp\u00e9rience<\/td><\/tr><tr><td>Personnalisation th\u00e8me<\/td><td>Could<\/td><td>Optionnel<\/td><\/tr><tr><td>Mode sombre<\/td><td>Won\u2019t<\/td><td>Version future<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"quels-sont-ses-avantages-autres-que-la-priorisation-des-taches-et-des-exigences\"><\/span>Quels sont ses avantages, autres que la priorisation des t\u00e2ches et des exigences ?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>La m\u00e9thode MoSCoW pr\u00e9sente trois avantages suppl\u00e9mentaires non n\u00e9gligeables.<br><br>Elle fournit \u00e0 toute l&rsquo;\u00e9quipe <strong>un vocabulaire commun<\/strong> gr\u00e2ce \u00e0 son acronyme simple, ce qui fluidifie les \u00e9changes entre parties prenantes et r\u00e9duit les malentendus.<br><br>Elle offre une <strong>flexibilit\u00e9 structur\u00e9e<\/strong> : en d\u00e9limitant clairement le p\u00e9rim\u00e8tre de chaque t\u00e2che, elle permet de garder la ma\u00eetrise des contraintes de d\u00e9lai, qualit\u00e9 et co\u00fbt, et de r\u00e9ajuster les objectifs si n\u00e9cessaire.<br><br>Enfin, les <strong>\u00ab\u00a0Won&rsquo;t have\u00a0\u00bb ne sont pas des refus<\/strong>, mais des reports. Les demandes non retenues sont conserv\u00e9es pour de futurs projets, ce qui \u00e9vite les frustrations c\u00f4t\u00e9 client et r\u00e9alimente les prochaines it\u00e9rations.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"et-ses-limites-dutilisation\"><\/span>Et ses limites d&rsquo;utilisation ?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>Malgr\u00e9 ses nombreux avantages, cette approche MoSCoW pr\u00e9sente certaines limites, qui peuvent<strong> compliquer l\u2019identification<\/strong> des t\u00e2ches.<\/p>\n\n\n\n<p>En effet, cette matrice ne donne <strong>pas de \u00ab cadres stricts \u00bb<\/strong> qui permettent de d\u00e9cider que telle ou telle t\u00e2che est consid\u00e9r\u00e9e comme \u00ab Must \u00bb, \u00ab Should \u00bb, \u00ab Could \u00bb ou \u00ab Won\u2019t \u00bb. Ce manque de d\u00e9finition pr\u00e9cise peut entrainer une confusion dans la priorisation des t\u00e2ches.<\/p>\n\n\n\n<p>C\u2019est l\u00e0 que la cat\u00e9gorisation de vos t\u00e2ches peut rapidement se complexifier. Nous pouvons avoir tendance par exemple \u00e0 :<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>identifier <strong>trop de t\u00e2ches comme \u00ab prioritaires \u00bb<\/strong> (\u00ab Must \u00bb), voire <strong>tout identifier<\/strong> comme tel,<\/li>\n\n\n\n<li><strong>avoir du mal \u00e0 distinguer <\/strong>si une t\u00e2che est essentielle (\u00ab Should \u00bb) ou bien optionnelle (\u00ab Could \u00bb) \u2026<\/li>\n\n\n\n<li>cr\u00e9er une surcharge de taches dans les cat\u00e9gories <strong>\u00ab\u00a0Should\u00a0\u00bb<\/strong> et <strong>\u00ab\u00a0Could\u00a0\u00bb<\/strong> au d\u00e9triment de la clart\u00e9 et de l&rsquo;efficacit\u00e9.<\/li>\n<\/ul>\n\n\n\n<p>Tout est subjectif avec cette m\u00e9thode, et c\u2019est pour cela que la r\u00e9partition se corse. Le manque de crit\u00e8res objectifs peut \u00e9galement rendre difficile l&rsquo;\u00e9valuation de la r\u00e9elle importance de chaque t\u00e2che.<\/p>\n\n\n\n<p>Un conseil est de vous<strong> limiter \u00e0 une proportion maximale<\/strong> de t\u00e2ches par groupe. Par exemple, en fixant des seuils clairs pour chaque cat\u00e9gorie, vous \u00e9viterez de tomber dans les pi\u00e8ges de cette m\u00e9thode. Enfin, en ce qui concerne sa <strong>repr\u00e9sentation graphique<\/strong>, libre \u00e0 vous de la repr\u00e9senter comme vous le souhaitez, et avec l&rsquo;outil de votre choix. L\u2019essentiel reste que chaque groupe (M, S, C, W) soit <strong>rapidement et facilement identifiable<\/strong>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"moscow-ou-matrice-eisenhower-quelle-difference\"><\/span>MoSCoW ou matrice Eisenhower : quelle diff\u00e9rence ?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>Ces deux m\u00e9thodes <strong>servent \u00e0 prioriser<\/strong>, mais elles ne r\u00e9pondent pas au m\u00eame besoin. La matrice Eisenhower classe les t\u00e2ches selon leur urgence et leur importance, elle est id\u00e9ale pour g\u00e9rer son temps au quotidien. <br><br>MoSCoW, elle, \u00e9value les exigences selon leur valeur m\u00e9tier et leur faisabilit\u00e9, elle s&rsquo;adresse avant tout \u00e0 la gestion de projet et au d\u00e9veloppement produit.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>M\u00e9thode<\/th><th>Objectif<\/th><\/tr><\/thead><tbody><tr><td>MoSCoW<\/td><td>prioriser les fonctionnalit\u00e9s<\/td><\/tr><tr><td>Eisenhower<\/td><td>g\u00e9rer l\u2019urgence et l\u2019importance<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"la-methode-de-priorisation-moscow-pour-optimiser-la-liste-des-taches-dun-projet\"><\/span>La m\u00e9thode de priorisation MoSCoW pour optimiser la liste des t\u00e2ches d&rsquo;un projet<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>La priorisation des t\u00e2ches et actions de vos projets est essentielle pour <strong>rester organis\u00e9<\/strong> et <strong>r\u00e9partir intelligemment vos ressources<\/strong>. Mais surtout afin de <strong>maximiser la r\u00e9ussite<\/strong> de vos projets.<\/p>\n\n\n\n<p>La m\u00e9thode MoSCoW est un outil puissant pour optimiser la liste des t\u00e2ches d&rsquo;un projet. Elle permet de hi\u00e9rarchiser efficacement les priorit\u00e9s. Ce qui offre ainsi une visibilit\u00e9 claire sur les t\u00e2ches en cours et la progression des projets.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"quel-outil-utiliser-pour-appliquer-la-methode-moscow\"><\/span>Quel outil utiliser pour appliquer la m\u00e9thode MoSCoW ?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>Pour une gestion encore plus experte, il est possible d&rsquo;utiliser des logiciels comme Bubble Plan pour une repr\u00e9sentation visuelle des t\u00e2ches. En ma\u00eetrisant cette m\u00e9thode, vous pouvez maximiser la r\u00e9ussite de vos projets.<\/p>\n\n\n\n<p>Avec la <strong>m\u00e9thode MoSCoW<\/strong>, vous serez capable de trier l\u2019importance de vos t\u00e2ches et d&rsquo;avancer sur votre projet.<\/p>\n\n\n\n<p>Cette m\u00e9thode offre \u00e9galement une <strong>large visibilit\u00e9<\/strong> sur les t\u00e2ches en cours et la progression des chantiers.<\/p>\n\n\n\n<p>Enfin, si vous souhaitez <strong>mod\u00e9liser graphiquement vos t\u00e2ches<\/strong>, vous pouvez tester Bubble Plan : un \u00a0<a href=\"https:\/\/bubbleplan.net\/\">logiciel de gestion de projet<\/a> et de <a href=\"https:\/\/bubbleplan.net\/pedagogie-projet\/diagramme-gantt-en-ligne\">planification<\/a> intuitif dans lequel vous repr\u00e9sentez vos t\u00e2ches dans des bulles.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><a href=\"https:\/\/bubbleplan.net\/creer-un-compte-gratuit\"><img decoding=\"async\" width=\"2560\" height=\"424\" src=\"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bas-de-page-1.png\" alt=\"appel \u00e0 l'action avec un texte \u00e0 gauche, et un bouton vert \u00e0 droite\" class=\"wp-image-14861\" srcset=\"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bas-de-page-1.png 2560w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bas-de-page-1-528x87.png 528w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bas-de-page-1-768x127.png 768w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bas-de-page-1-1536x254.png 1536w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bas-de-page-1-2048x339.png 2048w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bas-de-page-1-440x73.png 440w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bas-de-page-1-320x53.png 320w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bas-de-page-1-1400x232.png 1400w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" loading=\"lazy\" \/><\/a><\/figure>\n\n\n\n<p>Venez-y <a href=\"https:\/\/bubbleplan.net\/outil-gestion-projet\">g\u00e9rer vos t\u00e2ches<\/a> de mani\u00e8re plus avanc\u00e9e et devenez <strong>ma\u00eetre de vos plans <\/strong>!<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"faq-sur-la-methode-moscow\"><\/span>FAQ sur la m\u00e9thode MoSCoW<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<div class=\"schema-faq wp-block-yoast-faq-block\"><div class=\"schema-faq-section\" id=\"faq-question-1763557765228\"><strong class=\"schema-faq-question\">Comment \u00e9valuer les priorit\u00e9s de mani\u00e8re objective ?<\/strong> <p class=\"schema-faq-answer\">D\u00e9finissez des<strong> crit\u00e8res clairs<\/strong> : valeur produit, impact utilisateur et ressources n\u00e9cessaires. Impliquez votre \u00e9quipe et les parties prenantes pour croiser les perspectives. Pour chaque exigence, interrogez-vous : \u00ab\u00a0Le produit peut-il fonctionner sans cela ?\u00a0\u00bb, \u00ab\u00a0Quel effort est requis ?\u00a0\u00bb Documentez vos d\u00e9cisions dans le backlog et r\u00e9\u00e9valuez r\u00e9guli\u00e8rement pour permettre l&rsquo;am\u00e9lioration de vos priorit\u00e9s.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1773669342459\"><strong class=\"schema-faq-question\">La m\u00e9thode MoSCoW est-elle utilis\u00e9e en Agile ?<\/strong> <p class=\"schema-faq-answer\">Oui, tr\u00e8s utilis\u00e9e notamment en Scrum pour prioriser le backlog, et surtout en <strong>DSDM<\/strong> (Dynamic Systems Development Method) o\u00f9 elle est native.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1773669367371\"><strong class=\"schema-faq-question\">Combien de t\u00e2ches peuvent \u00eatre class\u00e9es \u00ab\u00a0Must have\u00a0\u00bb ?<\/strong> <p class=\"schema-faq-answer\">Il n&rsquo;existe pas de r\u00e8gle stricte, mais la convention recommande de ne pas d\u00e9passer <strong>60 % de la capacit\u00e9 du sprint\/projet<\/strong>. Au-del\u00e0, tout devient prioritaire, ce qui vide la m\u00e9thode de son sens.<\/p> <\/div> <\/div>\n","protected":false},"excerpt":{"rendered":"<p>Parmi les nombreuses approches de gestion, comme Agile, Scrum, Waterfall, WBS, la m\u00e9thode MoSCoW se distingue et est tr\u00e8s appr\u00e9ci\u00e9 par les \u00e9quipes dans le d\u00e9veloppement de produits logiciels. D\u2019autres approches viennent ensuite compl\u00e9ter ces m\u00e9thodologies. Cette approche se d\u00e9compose en quatre cat\u00e9gories : D\u00e9velopp\u00e9e par Dai Clegg, elle permet de prioriser les exigences et&#8230;<\/p>\n","protected":false},"author":7,"featured_media":5938,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[631],"tags":[52,66,87,319,354],"class_list":{"0":"post-4342","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","6":"hentry","7":"category-autres-methodes","8":"tag-gestion-de-projet","9":"tag-methode","10":"tag-organisation","11":"tag-gestion-de-taches","12":"tag-moscow","13":"article","14":"","16":"has-excerpt","17":"has-avatar","18":"has-author","19":"has-nickname","20":"has-date","21":"has-comment-count","22":"has-category-meta","23":"has-read-more","24":"has-title","25":"has-post-media","26":"thumbnail-"},"nelio_content":{"isAutoShareEnabled":true,"autoShareEndMode":"never","automationSources":{"useCustomSentences":false,"customSentences":[]},"followers":[2,7,11,14,1],"suggestedReferences":[],"efiUrl":"","efiAlt":"","highlights":[],"permalinkQueryArgs":[],"series":[]},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>M\u00e9thode MoSCoW : comment prioriser ses t\u00e2ches, revoir la priorit\u00e9<\/title>\n<meta name=\"description\" content=\"Vous avez du mal \u00e0 prioriser vos t\u00e2ches ? Utilisez la m\u00e9thode MoSCoW, c&#039;est peut-\u00eatre LA solution \u00e0 tous vos probl\u00e8mes d\u2019organisation !\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"M\u00e9thode MoSCoW : comment prioriser ses t\u00e2ches, revoir la priorit\u00e9\" \/>\n<meta property=\"og:description\" content=\"Vous avez du mal \u00e0 prioriser vos t\u00e2ches ? Utilisez la m\u00e9thode MoSCoW, c&#039;est peut-\u00eatre LA solution \u00e0 tous vos probl\u00e8mes d\u2019organisation !\" \/>\n<meta property=\"og:url\" content=\"https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/\" \/>\n<meta property=\"og:site_name\" content=\"Bubble Plan : blog de la Gestion de Projet efficace et collaborative\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/bubbleplan\" \/>\n<meta property=\"article:published_time\" content=\"2026-03-16T14:27:10+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-16T14:47:07+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2022\/06\/6-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"800\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Emma\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@BubblePlan\" \/>\n<meta name=\"twitter:site\" content=\"@BubblePlan\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"Emma\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/\"},\"author\":{\"name\":\"Emma\",\"@id\":\"https:\/\/bubbleplan.net\/blog\/#\/schema\/person\/cda1d4c6914e0c5613aa6a04a38f7997\"},\"headline\":\"M\u00e9thode MoSCoW : apprenez \u00e0 prioriser vos t\u00e2ches\",\"datePublished\":\"2026-03-16T14:27:10+00:00\",\"dateModified\":\"2026-03-16T14:47:07+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/\"},\"wordCount\":2211,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/bubbleplan.net\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2022\/06\/6-1.jpg\",\"keywords\":[\"gestion de projet\",\"m\u00e9thode\",\"organisation\",\"gestion de t\u00e2ches\",\"moscow\"],\"articleSection\":[\"Autres m\u00e9thodes\"],\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/#respond\"]}]},{\"@type\":[\"WebPage\",\"FAQPage\"],\"@id\":\"https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/\",\"url\":\"https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/\",\"name\":\"M\u00e9thode MoSCoW : comment prioriser ses t\u00e2ches, revoir la priorit\u00e9\",\"isPartOf\":{\"@id\":\"https:\/\/bubbleplan.net\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2022\/06\/6-1.jpg\",\"datePublished\":\"2026-03-16T14:27:10+00:00\",\"dateModified\":\"2026-03-16T14:47:07+00:00\",\"description\":\"Vous avez du mal \u00e0 prioriser vos t\u00e2ches ? Utilisez la m\u00e9thode MoSCoW, c'est peut-\u00eatre LA solution \u00e0 tous vos probl\u00e8mes d\u2019organisation !\",\"breadcrumb\":{\"@id\":\"https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/#breadcrumb\"},\"mainEntity\":[{\"@id\":\"https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/#faq-question-1763557765228\"},{\"@id\":\"https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/#faq-question-1773669342459\"},{\"@id\":\"https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/#faq-question-1773669367371\"}],\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/#primaryimage\",\"url\":\"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2022\/06\/6-1.jpg\",\"contentUrl\":\"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2022\/06\/6-1.jpg\",\"width\":1200,\"height\":800},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Blog\",\"item\":\"https:\/\/bubbleplan.net\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"M\u00e9thodes\",\"item\":\"https:\/\/bubbleplan.net\/blog\/category\/methodes\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Autres m\u00e9thodes\",\"item\":\"https:\/\/bubbleplan.net\/blog\/category\/methodes\/autres-methodes\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"M\u00e9thode MoSCoW : apprenez \u00e0 prioriser vos t\u00e2ches\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/bubbleplan.net\/blog\/#website\",\"url\":\"https:\/\/bubbleplan.net\/blog\/\",\"name\":\"Bubble Plan : blog de la Gestion de Projet efficace et collaborative\",\"description\":\"Toute l&#039;actualit\u00e9 de la gestion de projet et du collaboratif, avec Bubble Plan\",\"publisher\":{\"@id\":\"https:\/\/bubbleplan.net\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/bubbleplan.net\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/bubbleplan.net\/blog\/#organization\",\"name\":\"Bubble Plan\",\"url\":\"https:\/\/bubbleplan.net\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/bubbleplan.net\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2024\/07\/logo-leblog-vf-01-336.png\",\"contentUrl\":\"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2024\/07\/logo-leblog-vf-01-336.png\",\"width\":672,\"height\":62,\"caption\":\"Bubble Plan\"},\"image\":{\"@id\":\"https:\/\/bubbleplan.net\/blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/bubbleplan\",\"https:\/\/x.com\/BubblePlan\",\"https:\/\/www.linkedin.com\/company\/bubbleplan\",\"https:\/\/www.youtube.com\/channel\/UCDb4feDzsa4fCd_vR5HZJgg\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/bubbleplan.net\/blog\/#\/schema\/person\/cda1d4c6914e0c5613aa6a04a38f7997\",\"name\":\"Emma\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/bubbleplan.net\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/85cfb675a53abf42ce22c269ea49ce8c?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/85cfb675a53abf42ce22c269ea49ce8c?s=96&d=mm&r=g\",\"caption\":\"Emma\"},\"description\":\"Emma d\u00e9crypte la gestion de projet avec sa sensibilit\u00e9 com\u2019 et son go\u00fbt pour les contenus bien pens\u00e9s. Sur le blog, elle transforme les sujets complexes en lectures limpides et utiles, \u00e0 lire sans prise de t\u00eate, mais toujours avec de vraies id\u00e9es \u00e0 emporter.\",\"url\":\"https:\/\/bubbleplan.net\/blog\/author\/emma\/\"},{\"@type\":\"Question\",\"@id\":\"https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/#faq-question-1763557765228\",\"position\":1,\"url\":\"https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/#faq-question-1763557765228\",\"name\":\"Comment \u00e9valuer les priorit\u00e9s de mani\u00e8re objective ?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"D\u00e9finissez des<strong> crit\u00e8res clairs<\/strong> : valeur produit, impact utilisateur et ressources n\u00e9cessaires. Impliquez votre \u00e9quipe et les parties prenantes pour croiser les perspectives. Pour chaque exigence, interrogez-vous : \\\"Le produit peut-il fonctionner sans cela ?\\\", \\\"Quel effort est requis ?\\\" Documentez vos d\u00e9cisions dans le backlog et r\u00e9\u00e9valuez r\u00e9guli\u00e8rement pour permettre l'am\u00e9lioration de vos priorit\u00e9s.\",\"inLanguage\":\"fr-FR\"},\"inLanguage\":\"fr-FR\"},{\"@type\":\"Question\",\"@id\":\"https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/#faq-question-1773669342459\",\"position\":2,\"url\":\"https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/#faq-question-1773669342459\",\"name\":\"La m\u00e9thode MoSCoW est-elle utilis\u00e9e en Agile ?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Oui, tr\u00e8s utilis\u00e9e notamment en Scrum pour prioriser le backlog, et surtout en <strong>DSDM<\/strong> (Dynamic Systems Development Method) o\u00f9 elle est native.\",\"inLanguage\":\"fr-FR\"},\"inLanguage\":\"fr-FR\"},{\"@type\":\"Question\",\"@id\":\"https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/#faq-question-1773669367371\",\"position\":3,\"url\":\"https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/#faq-question-1773669367371\",\"name\":\"Combien de t\u00e2ches peuvent \u00eatre class\u00e9es \\\"Must have\\\" ?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Il n'existe pas de r\u00e8gle stricte, mais la convention recommande de ne pas d\u00e9passer <strong>60 % de la capacit\u00e9 du sprint\/projet<\/strong>. Au-del\u00e0, tout devient prioritaire, ce qui vide la m\u00e9thode de son sens.\",\"inLanguage\":\"fr-FR\"},\"inLanguage\":\"fr-FR\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"M\u00e9thode MoSCoW : comment prioriser ses t\u00e2ches, revoir la priorit\u00e9","description":"Vous avez du mal \u00e0 prioriser vos t\u00e2ches ? Utilisez la m\u00e9thode MoSCoW, c'est peut-\u00eatre LA solution \u00e0 tous vos probl\u00e8mes d\u2019organisation !","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/","og_locale":"fr_FR","og_type":"article","og_title":"M\u00e9thode MoSCoW : comment prioriser ses t\u00e2ches, revoir la priorit\u00e9","og_description":"Vous avez du mal \u00e0 prioriser vos t\u00e2ches ? Utilisez la m\u00e9thode MoSCoW, c'est peut-\u00eatre LA solution \u00e0 tous vos probl\u00e8mes d\u2019organisation !","og_url":"https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/","og_site_name":"Bubble Plan : blog de la Gestion de Projet efficace et collaborative","article_publisher":"https:\/\/www.facebook.com\/bubbleplan","article_published_time":"2026-03-16T14:27:10+00:00","article_modified_time":"2026-03-16T14:47:07+00:00","og_image":[{"width":1200,"height":800,"url":"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2022\/06\/6-1.jpg","type":"image\/jpeg"}],"author":"Emma","twitter_card":"summary_large_image","twitter_creator":"@BubblePlan","twitter_site":"@BubblePlan","twitter_misc":{"\u00c9crit par":"Emma","Dur\u00e9e de lecture estim\u00e9e":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/#article","isPartOf":{"@id":"https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/"},"author":{"name":"Emma","@id":"https:\/\/bubbleplan.net\/blog\/#\/schema\/person\/cda1d4c6914e0c5613aa6a04a38f7997"},"headline":"M\u00e9thode MoSCoW : apprenez \u00e0 prioriser vos t\u00e2ches","datePublished":"2026-03-16T14:27:10+00:00","dateModified":"2026-03-16T14:47:07+00:00","mainEntityOfPage":{"@id":"https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/"},"wordCount":2211,"commentCount":0,"publisher":{"@id":"https:\/\/bubbleplan.net\/blog\/#organization"},"image":{"@id":"https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/#primaryimage"},"thumbnailUrl":"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2022\/06\/6-1.jpg","keywords":["gestion de projet","m\u00e9thode","organisation","gestion de t\u00e2ches","moscow"],"articleSection":["Autres m\u00e9thodes"],"inLanguage":"fr-FR","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/#respond"]}]},{"@type":["WebPage","FAQPage"],"@id":"https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/","url":"https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/","name":"M\u00e9thode MoSCoW : comment prioriser ses t\u00e2ches, revoir la priorit\u00e9","isPartOf":{"@id":"https:\/\/bubbleplan.net\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/#primaryimage"},"image":{"@id":"https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/#primaryimage"},"thumbnailUrl":"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2022\/06\/6-1.jpg","datePublished":"2026-03-16T14:27:10+00:00","dateModified":"2026-03-16T14:47:07+00:00","description":"Vous avez du mal \u00e0 prioriser vos t\u00e2ches ? Utilisez la m\u00e9thode MoSCoW, c'est peut-\u00eatre LA solution \u00e0 tous vos probl\u00e8mes d\u2019organisation !","breadcrumb":{"@id":"https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/#breadcrumb"},"mainEntity":[{"@id":"https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/#faq-question-1763557765228"},{"@id":"https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/#faq-question-1773669342459"},{"@id":"https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/#faq-question-1773669367371"}],"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/#primaryimage","url":"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2022\/06\/6-1.jpg","contentUrl":"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2022\/06\/6-1.jpg","width":1200,"height":800},{"@type":"BreadcrumbList","@id":"https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Blog","item":"https:\/\/bubbleplan.net\/blog\/"},{"@type":"ListItem","position":2,"name":"M\u00e9thodes","item":"https:\/\/bubbleplan.net\/blog\/category\/methodes\/"},{"@type":"ListItem","position":3,"name":"Autres m\u00e9thodes","item":"https:\/\/bubbleplan.net\/blog\/category\/methodes\/autres-methodes\/"},{"@type":"ListItem","position":4,"name":"M\u00e9thode MoSCoW : apprenez \u00e0 prioriser vos t\u00e2ches"}]},{"@type":"WebSite","@id":"https:\/\/bubbleplan.net\/blog\/#website","url":"https:\/\/bubbleplan.net\/blog\/","name":"Bubble Plan : blog de la Gestion de Projet efficace et collaborative","description":"Toute l&#039;actualit\u00e9 de la gestion de projet et du collaboratif, avec Bubble Plan","publisher":{"@id":"https:\/\/bubbleplan.net\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/bubbleplan.net\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/bubbleplan.net\/blog\/#organization","name":"Bubble Plan","url":"https:\/\/bubbleplan.net\/blog\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/bubbleplan.net\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2024\/07\/logo-leblog-vf-01-336.png","contentUrl":"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2024\/07\/logo-leblog-vf-01-336.png","width":672,"height":62,"caption":"Bubble Plan"},"image":{"@id":"https:\/\/bubbleplan.net\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/bubbleplan","https:\/\/x.com\/BubblePlan","https:\/\/www.linkedin.com\/company\/bubbleplan","https:\/\/www.youtube.com\/channel\/UCDb4feDzsa4fCd_vR5HZJgg"]},{"@type":"Person","@id":"https:\/\/bubbleplan.net\/blog\/#\/schema\/person\/cda1d4c6914e0c5613aa6a04a38f7997","name":"Emma","image":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/bubbleplan.net\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/85cfb675a53abf42ce22c269ea49ce8c?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/85cfb675a53abf42ce22c269ea49ce8c?s=96&d=mm&r=g","caption":"Emma"},"description":"Emma d\u00e9crypte la gestion de projet avec sa sensibilit\u00e9 com\u2019 et son go\u00fbt pour les contenus bien pens\u00e9s. Sur le blog, elle transforme les sujets complexes en lectures limpides et utiles, \u00e0 lire sans prise de t\u00eate, mais toujours avec de vraies id\u00e9es \u00e0 emporter.","url":"https:\/\/bubbleplan.net\/blog\/author\/emma\/"},{"@type":"Question","@id":"https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/#faq-question-1763557765228","position":1,"url":"https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/#faq-question-1763557765228","name":"Comment \u00e9valuer les priorit\u00e9s de mani\u00e8re objective ?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"D\u00e9finissez des<strong> crit\u00e8res clairs<\/strong> : valeur produit, impact utilisateur et ressources n\u00e9cessaires. Impliquez votre \u00e9quipe et les parties prenantes pour croiser les perspectives. Pour chaque exigence, interrogez-vous : \"Le produit peut-il fonctionner sans cela ?\", \"Quel effort est requis ?\" Documentez vos d\u00e9cisions dans le backlog et r\u00e9\u00e9valuez r\u00e9guli\u00e8rement pour permettre l'am\u00e9lioration de vos priorit\u00e9s.","inLanguage":"fr-FR"},"inLanguage":"fr-FR"},{"@type":"Question","@id":"https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/#faq-question-1773669342459","position":2,"url":"https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/#faq-question-1773669342459","name":"La m\u00e9thode MoSCoW est-elle utilis\u00e9e en Agile ?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"Oui, tr\u00e8s utilis\u00e9e notamment en Scrum pour prioriser le backlog, et surtout en <strong>DSDM<\/strong> (Dynamic Systems Development Method) o\u00f9 elle est native.","inLanguage":"fr-FR"},"inLanguage":"fr-FR"},{"@type":"Question","@id":"https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/#faq-question-1773669367371","position":3,"url":"https:\/\/bubbleplan.net\/blog\/methode-moscow-prioriser-taches\/#faq-question-1773669367371","name":"Combien de t\u00e2ches peuvent \u00eatre class\u00e9es \"Must have\" ?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"Il n'existe pas de r\u00e8gle stricte, mais la convention recommande de ne pas d\u00e9passer <strong>60 % de la capacit\u00e9 du sprint\/projet<\/strong>. Au-del\u00e0, tout devient prioritaire, ce qui vide la m\u00e9thode de son sens.","inLanguage":"fr-FR"},"inLanguage":"fr-FR"}]}},"_links":{"self":[{"href":"https:\/\/bubbleplan.net\/blog\/wp-json\/wp\/v2\/posts\/4342","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bubbleplan.net\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bubbleplan.net\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bubbleplan.net\/blog\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/bubbleplan.net\/blog\/wp-json\/wp\/v2\/comments?post=4342"}],"version-history":[{"count":31,"href":"https:\/\/bubbleplan.net\/blog\/wp-json\/wp\/v2\/posts\/4342\/revisions"}],"predecessor-version":[{"id":16174,"href":"https:\/\/bubbleplan.net\/blog\/wp-json\/wp\/v2\/posts\/4342\/revisions\/16174"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/bubbleplan.net\/blog\/wp-json\/wp\/v2\/media\/5938"}],"wp:attachment":[{"href":"https:\/\/bubbleplan.net\/blog\/wp-json\/wp\/v2\/media?parent=4342"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bubbleplan.net\/blog\/wp-json\/wp\/v2\/categories?post=4342"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bubbleplan.net\/blog\/wp-json\/wp\/v2\/tags?post=4342"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}