{"id":5403,"date":"2026-02-23T17:39:32","date_gmt":"2026-02-23T16:39:32","guid":{"rendered":"https:\/\/bubbleplan.net\/blog\/?p=5403"},"modified":"2026-05-22T11:03:32","modified_gmt":"2026-05-22T09:03:32","slug":"retroplanning-comment-le-realiser-simplement","status":"publish","type":"post","link":"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/","title":{"rendered":"Outil r\u00e9troplanning projet : comment cr\u00e9er un r\u00e9troplanning projet en ligne (logiciel)"},"content":{"rendered":"\n\n<div class=\"kk-star-ratings kksr-auto kksr-align-left kksr-valign-top\"\n    data-payload='{&quot;align&quot;:&quot;left&quot;,&quot;id&quot;:&quot;5403&quot;,&quot;slug&quot;:&quot;default&quot;,&quot;valign&quot;:&quot;top&quot;,&quot;ignore&quot;:&quot;&quot;,&quot;reference&quot;:&quot;auto&quot;,&quot;class&quot;:&quot;&quot;,&quot;count&quot;:&quot;26&quot;,&quot;legendonly&quot;:&quot;&quot;,&quot;readonly&quot;:&quot;&quot;,&quot;score&quot;:&quot;4.9&quot;,&quot;starsonly&quot;:&quot;&quot;,&quot;best&quot;:&quot;5&quot;,&quot;gap&quot;:&quot;0&quot;,&quot;greet&quot;:&quot;Votre avis est essentiel !&quot;,&quot;legend&quot;:&quot;4.9\\\/5 - (26 votes)&quot;,&quot;size&quot;:&quot;20&quot;,&quot;title&quot;:&quot;Outil r\u00e9troplanning projet : comment cr\u00e9er un r\u00e9troplanning projet en ligne (logiciel)&quot;,&quot;width&quot;:&quot;98&quot;,&quot;_legend&quot;:&quot;{score}\\\/{best} - ({count} {votes})&quot;,&quot;font_factor&quot;:&quot;1.25&quot;}'>\n            \n<div class=\"kksr-stars\">\n    \n<div class=\"kksr-stars-inactive\">\n            <div class=\"kksr-star\" data-star=\"1\" style=\"padding-right: 0px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 20px; height: 20px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"2\" style=\"padding-right: 0px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 20px; height: 20px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"3\" style=\"padding-right: 0px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 20px; height: 20px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"4\" style=\"padding-right: 0px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 20px; height: 20px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" data-star=\"5\" style=\"padding-right: 0px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 20px; height: 20px;\"><\/div>\n        <\/div>\n    <\/div>\n    \n<div class=\"kksr-stars-active\" style=\"width: 98px;\">\n            <div class=\"kksr-star\" style=\"padding-right: 0px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 20px; height: 20px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 0px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 20px; height: 20px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 0px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 20px; height: 20px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 0px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 20px; height: 20px;\"><\/div>\n        <\/div>\n            <div class=\"kksr-star\" style=\"padding-right: 0px\">\n            \n\n<div class=\"kksr-icon\" style=\"width: 20px; height: 20px;\"><\/div>\n        <\/div>\n    <\/div>\n<\/div>\n                \n\n<div class=\"kksr-legend\" style=\"font-size: 16px;\">\n            4.9\/5 - (26 votes)    <\/div>\n    <\/div>\n\n<p>Un <strong>outil r\u00e9troplanning <\/strong>permet de construire un planning en partant de la date de livraison finale pour organiser l\u2019ensemble des t\u00e2ches \u00e0 rebours.<\/p>\n\n\n\n<p><br>Contrairement \u00e0 un planning classique, la date de fin est fixe et non n\u00e9gociable. Toutes les \u00e9tapes du projet sont alors positionn\u00e9es en fonction de cette \u00e9ch\u00e9ance.<\/p>\n\n\n\n<p>Dans cet article, vous allez d\u00e9couvrir : <\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Ce qu&rsquo;est un r\u00e9troplanning projet<\/li>\n\n\n\n<li>Comment le cr\u00e9er simplement<\/li>\n\n\n\n<li>Et surtout quel logiciel utiliser pour automatiser sa construction<\/li>\n<\/ul>\n\n\n\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_71 ez-toc-wrap-center counter-hierarchy ez-toc-counter ez-toc-transparent ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<span class=\"ez-toc-title\" style=\"cursor:inherit\">SOMMAIRE<\/span>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#pourquoi-utiliser-un-outil-retroplanning-en-ligne\" title=\"Pourquoi utiliser un outil r\u00e9troplanning en ligne ?\">Pourquoi utiliser un outil r\u00e9troplanning en ligne ?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#quest-ce-quun-retroplanning-projet\" title=\"Qu&rsquo;est-ce qu&rsquo;un r\u00e9troplanning projet ?\">Qu&rsquo;est-ce qu&rsquo;un r\u00e9troplanning projet ?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#quelle-est-la-difference-entre-retroplanning-et-planning\" title=\"Quelle est la diff\u00e9rence entre r\u00e9troplanning et planning ?\">Quelle est la diff\u00e9rence entre r\u00e9troplanning et planning ?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#quelles-grandes-etapes-pour-construire-un-retro-planning-projet\" title=\"Quelles grandes \u00e9tapes pour construire un r\u00e9tro planning projet ?\">Quelles grandes \u00e9tapes pour construire un r\u00e9tro planning projet ?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#quand-privilegier-la-retro-planification\" title=\"Quand privil\u00e9gier la r\u00e9tro-planification ?\">Quand privil\u00e9gier la r\u00e9tro-planification ?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#bubble-plan-un-outil-de-retroplanning-automatique\" title=\"Bubble Plan : un outil de r\u00e9troplanning automatique\">Bubble Plan : un outil de r\u00e9troplanning automatique<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#conclusion-sur-le-retro-planning-projet\" title=\"Conclusion sur le r\u00e9tro planning projet\">Conclusion sur le r\u00e9tro planning projet<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#faq\" title=\"FAQ\">FAQ<\/a><\/li><\/ul><\/nav><\/div>\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"pourquoi-utiliser-un-outil-retroplanning-en-ligne\"><\/span>Pourquoi utiliser un outil r\u00e9troplanning en ligne ?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>Cr\u00e9er un r\u00e9troplanning sur Excel est possible, mais limit\u00e9. Sans gestion automatique des d\u00e9pendances, le moindre retard impose des ajustements manuels.<br>Un logiciel r\u00e9troplanning en ligne permet :<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Le recalcul automatique des \u00e9ch\u00e9ances,<\/li>\n\n\n\n<li>La gestion des d\u00e9pendances entre t\u00e2ches,<\/li>\n\n\n\n<li>L\u2019identification du chemin critique,<\/li>\n\n\n\n<li>Et la collaboration en temps r\u00e9el.<\/li>\n<\/ul>\n\n\n\n<p>Pour les projets avec \u00e9ch\u00e9ance fixe, cette automatisation devient un v\u00e9ritable levier de s\u00e9curit\u00e9.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"quest-ce-quun-retroplanning-projet\"><\/span>Qu&rsquo;est-ce qu&rsquo;un r\u00e9troplanning projet ?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>Il peut se d\u00e9finir comme un mod\u00e8le de <strong>planning particulier<\/strong>, li\u00e9 \u00e0 une technique de <a href=\"https:\/\/bubblemeeting.net\/blog\/comment-creer-son-propre-commerce-elaborer-strategie-lancement-entreprise\/\" target=\"_blank\" rel=\"noreferrer noopener\">gestion de projet en entreprise<\/a>. Et m\u00eame de planification ! Il permet de faire le plan du d\u00e9roulement des projets.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/bubbleplan.net\/creer-un-compte-gratuit\"><img decoding=\"async\" width=\"2911\" height=\"1008\" src=\"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bubble-plan-2911x1008.png\" alt=\"appel \u00e0 l'action pour s'inscrire sur bubble plan\" class=\"wp-image-14853\" srcset=\"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bubble-plan-2911x1008.png 2911w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bubble-plan-528x183.png 528w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bubble-plan-768x266.png 768w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bubble-plan-1536x532.png 1536w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bubble-plan-2048x709.png 2048w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bubble-plan-440x152.png 440w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bubble-plan-320x111.png 320w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bubble-plan-1400x485.png 1400w\" sizes=\"(max-width: 2911px) 100vw, 2911px\" loading=\"lazy\" \/><\/a><\/figure>\n\n\n\n<p>Il s\u2019agit d\u2019abord de <strong>focaliser sur la date d\u2019\u00e9ch\u00e9ance <\/strong>pour un projet dont les diff\u00e9rents \u00e9l\u00e9ments sont d\u00e9j\u00e0 connus.<\/p>\n\n\n\n<p>L\u2019ensemble des phases, \u00e9tapes projet, t\u00e2ches se positionne donc en fonction de ce jalon cl\u00e9. En g\u00e9n\u00e9ral parce qu\u2019elle repr\u00e9sente une <strong>obligation<\/strong> et qu\u2019aucun retard ne pourra \u00eatre envisag\u00e9 sur celle-ci.<\/p>\n\n\n\n<p>Sa repr\u00e9sentation prend g\u00e9n\u00e9ralement la forme d&rsquo;un diagramme, construit \u00e0 l&rsquo;aide d&rsquo;outils sp\u00e9cialis\u00e9s.&nbsp;<\/p>\n\n\n\n<p>Il sera possible de d\u00e9caler, raccourcir, allonger les missions d\u00e9termin\u00e9es durant la planification du calendrier projet, mais la p\u00e9riode de livraison, elle, reste inali\u00e9nable (le projet \u00e9tant \u00e0 livrer dans les meilleurs d\u00e9lais). On ne peut donc pas la d\u00e9placer. C&rsquo;est pr\u00e9cis\u00e9ment parce que <strong>tout est planifi\u00e9 en partant de la fin<\/strong> que l&rsquo;on parle de r\u00e9tro-planning projet.<\/p>\n\n\n\n<p>Il est fort probable que la premi\u00e8re version ne soit pas la version finale. N\u00e9anmoins, il vaut mieux partir sur de bonnes bases pour commencer \u00e0 s&rsquo;organiser dans les meilleures conditions. Les modifications se feront en cours de route.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter\"><img decoding=\"async\" width=\"528\" height=\"161\" src=\"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2024\/06\/article-20-06-24-retroplanning-plan-de-travail-1-plan-de-travail-1-copie-528x161.jpg\" alt=\"Le r\u00e9troplanning\" class=\"wp-image-11733\" srcset=\"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2024\/06\/article-20-06-24-retroplanning-plan-de-travail-1-plan-de-travail-1-copie-528x161.jpg 528w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2024\/06\/article-20-06-24-retroplanning-plan-de-travail-1-plan-de-travail-1-copie-768x234.jpg 768w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2024\/06\/article-20-06-24-retroplanning-plan-de-travail-1-plan-de-travail-1-copie-1536x468.jpg 1536w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2024\/06\/article-20-06-24-retroplanning-plan-de-travail-1-plan-de-travail-1-copie-2048x624.jpg 2048w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2024\/06\/article-20-06-24-retroplanning-plan-de-travail-1-plan-de-travail-1-copie-640x195.jpg 640w\" sizes=\"(max-width: 528px) 100vw, 528px\" loading=\"lazy\" \/><\/figure><\/div>\n\n\n<h3 class=\"wp-block-heading\"><strong>Les principaux types de planning en gestion de projet<\/strong><\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Agile : <\/strong>il constitue l&rsquo;approche de gestion de projet la plus basique. Chaque t\u00e2che est organis\u00e9e en s\u00e9quence selon un ordre logique, sans chevauchement. Id\u00e9al pour les projets d&rsquo;entreprises aux \u00e9tapes clairement d\u00e9finies et constantes. Ce dernier facilite l&rsquo;\u00e9tablissement de chaque \u00e9tape du projet, avec des exemples typiques o\u00f9 peu de modifications sont pr\u00e9vues.<\/li>\n\n\n\n<li><strong>Par <a href=\"https:\/\/bubbleplan.net\/blog\/comprendre-scrum-methodologie-agile-gestion-projet-reussie\/\">sprints<\/a> : <\/strong>c&rsquo;est un sous-type du planning agile. Les travaux sont divis\u00e9s en sprints, chaque sprint \u00e9tant une \u00e9tape du projet avec des objectifs pr\u00e9cis et une dur\u00e9e sp\u00e9cifique. Cette m\u00e9thodologie permet de structurer les t\u00e2ches projet en phases concentr\u00e9es. Offrant un cadre exemplaire pour la gestion rythm\u00e9e des activit\u00e9s.<\/li>\n\n\n\n<li><strong>Traditionnel ou lin\u00e9aire :<\/strong> il est utilis\u00e9 dans les strat\u00e9gies de d\u00e9veloppement logiciel Agile. Il se caract\u00e9rise par sa flexibilit\u00e9, ce qui permet d&rsquo;apporter des ajustements rapides en r\u00e9ponse aux \u00e9volutions du projet. L&rsquo;approche favorise une am\u00e9lioration continue, illustr\u00e9e par des cycles courts de sprints, rendant chaque \u00e9tape du projet align\u00e9e sur les objectifs \u00e9volutifs.<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>L&rsquo;impact du r\u00e9troplanning sur le management d&rsquo;\u00e9quipe<\/strong><\/h3>\n\n\n\n<p>En inversant l&rsquo;approche traditionnelle, il instaure une <strong>discipline structur\u00e9e <\/strong>qui modifie significativement le fonctionnement et la collaboration des \u00e9quipes. En fixant une \u00e9ch\u00e9ance, cette m\u00e9thode force toutes les parties prenantes \u00e0 orienter leurs efforts vers le respect de cette \u00e9ch\u00e9ance. Cela se traduit par une meilleure allocation des ressources, chaque membre de l&rsquo;\u00e9quipe ayant une vision claire de ses responsabilit\u00e9s et du temps imparti.<\/p>\n\n\n\n<p>La <strong>communication interne<\/strong> se trouve \u00e9galement renforc\u00e9e. Le r\u00e9troplanning exige que chaque \u00e9tape, t\u00e2che et sous-t\u00e2che soit clairement d\u00e9finie et communiqu\u00e9e \u00e0 tous les membres de l&rsquo;\u00e9quipe. Cette transparence assure que tous les participants sont sur la m\u00eame longueur d&rsquo;onde et r\u00e9duit le risque de malentendus ou de d\u00e9doublement des efforts.<\/p>\n\n\n\n<p>Du point de vue de la motivation, il a un impact notable. La clart\u00e9 des <strong>d\u00e9lais <\/strong>et des <strong>objectifs <\/strong>permet aux \u00e9quipes de se sentir plus engag\u00e9es. Le fait de voir comment chaque t\u00e2che s\u2019inscrit dans le tableau g\u00e9n\u00e9ral aide \u00e0 maintenir un niveau \u00e9lev\u00e9 de motivation. Chaque \u00e9ch\u00e9ance atteinte repr\u00e9sente un pas de plus vers le succ\u00e8s du projet. De plus, cette technique peut encourager une <strong>comp\u00e9tition saine<\/strong> et <strong>productive <\/strong>au sein de l&rsquo;\u00e9quipe, chacun cherchant \u00e0 accomplir sa part dans les d\u00e9lais impartis.<\/p>\n\n\n\n<p>En d\u00e9finitive, ce dernier ne se contente pas de d\u00e9terminer quand les t\u00e2ches doivent \u00eatre achev\u00e9es. Il forme \u00e9galement la fa\u00e7on dont les \u00e9quipes interagissent, communiquent et progressent vers un objectif commun. Cette approche inverse est donc non seulement un outil de gestion de projet qui booste l&rsquo;efficacit\u00e9 des \u00e9quipes.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"quelle-est-la-difference-entre-retroplanning-et-planning\"><\/span>Quelle est la diff\u00e9rence entre r\u00e9troplanning et planning ?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Crit\u00e8res<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Planning classique<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>R\u00e9troplanning<\/strong><\/td><\/tr><tr><td>Point de d\u00e9part<\/td><td class=\"has-text-align-center\" data-align=\"center\">Date de d\u00e9but du projet<\/td><td class=\"has-text-align-center\" data-align=\"center\">Date de livraison finale<\/td><\/tr><tr><td>Direction de construction<\/td><td class=\"has-text-align-center\" data-align=\"center\">Du d\u00e9but vers la fin<\/td><td class=\"has-text-align-center\" data-align=\"center\">De la fin vers le d\u00e9but<\/td><\/tr><tr><td>M\u00e9thode de cr\u00e9ation<\/td><td class=\"has-text-align-center\" data-align=\"center\">D&rsquo;un coup ou progressivement<\/td><td class=\"has-text-align-center\" data-align=\"center\">\u00c0 partir de l&rsquo;\u00e9ch\u00e9ance fixe<\/td><\/tr><tr><td>Flexibilit\u00e9 des d\u00e9lais<\/td><td class=\"has-text-align-center\" data-align=\"center\">Date de fin variable<\/td><td class=\"has-text-align-center\" data-align=\"center\">Date de fin non n\u00e9gociable<\/td><\/tr><tr><td>Outils disponibles<\/td><td class=\"has-text-align-center\" data-align=\"center\">Agenda, tableur, outils d\u00e9di\u00e9s<\/td><td class=\"has-text-align-center\" data-align=\"center\">Outils sp\u00e9cialis\u00e9s avec automatisation<\/td><\/tr><tr><td>Vue propos\u00e9e<\/td><td class=\"has-text-align-center\" data-align=\"center\">Planning standard<\/td><td class=\"has-text-align-center\" data-align=\"center\">Vue r\u00e9troplanning avec mod\u00e9lisation<\/td><\/tr><tr><td>Gestion des impr\u00e9vus<\/td><td class=\"has-text-align-center\" data-align=\"center\">D\u00e9calage possible de la livraison<\/td><td class=\"has-text-align-center\" data-align=\"center\">Ajustement des t\u00e2ches interm\u00e9diaires<\/td><\/tr><tr><td>Facilit\u00e9 d&rsquo;ajustement<\/td><td class=\"has-text-align-center\" data-align=\"center\">Modification manuelle t\u00e2che par t\u00e2che<\/td><td class=\"has-text-align-center\" data-align=\"center\">Recalcul automatique des d\u00e9pendances<\/td><\/tr><tr><td>Avantage principal<\/td><td class=\"has-text-align-center\" data-align=\"center\">Visualisation des imp\u00e9ratifs projet<\/td><td class=\"has-text-align-center\" data-align=\"center\">Respect garanti des \u00e9ch\u00e9ances<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>Le planning est le simple fait de repr\u00e9senter graphiquement et en fonction des p\u00e9riodes, des \u00e9tapes ou t\u00e2ches. Il est plus int\u00e9ressant de le concevoir avec un outil en ligne afin de le rendre plus facilement accessible aux utilisateurs.<\/p>\n\n\n\n<p>Il peut \u00eatre fait \u00e0 partir d\u2019un agenda ou d\u2019un tableur, mais \u00e9galement d\u2019un <a href=\"https:\/\/bubbleplan.net\/blog\/toms-planner-planification-collaborative\/\">outil d\u00e9di\u00e9 \u00e0 la planification<\/a> ou d\u2019un\u00a0<a href=\"https:\/\/bubbleplan.net\/outil-gestion-projet\">outil de gestion de projet<\/a>\u2026 La plupart proposent une vue planning, sans r\u00e9troplanning, mod\u00e9lisation via un planning ou mod\u00e8le de d\u00e9part.<\/p>\n\n\n\n<p>Pour construire ce type de planning \u00e0 rebours plus facilement, un <a href=\"https:\/\/bubbleplan.net\/outil-planification\">logiciel de planification en ligne<\/a> permet de mieux g\u00e9rer les \u00e9ch\u00e9ances, les d\u00e9pendances et les ajustements au fil du projet.<\/p>\n\n\n\n<p>Comme introduit plus haut, le planning classique est construit d\u2019un coup ou progressivement, du d\u00e9but vers la fin du chantier. Dans les deux cas, elle permet de visualiser les imp\u00e9ratifs de chaque projet (pour mieux les respecter).<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Un planning sur le plan de la r\u00e9trospection ?<\/h3>\n\n\n\n<p>Cette <strong>approche invers\u00e9e<\/strong> s&rsquo;av\u00e8re particuli\u00e8rement utile dans certains contextes o\u00f9 la date finale est <strong>non n\u00e9gociable<\/strong> : \u00e9v\u00e9nements, lancements marketing, projets strat\u00e9giques&#8230; Dans ces situations, impossible de d\u00e9caler l&rsquo;\u00e9ch\u00e9ance !<\/p>\n\n\n\n<p>Prenons l&rsquo;exemple concret d&rsquo;un \u00e9v\u00e9nement : la date est d\u00e9j\u00e0 communiqu\u00e9e aux participants, les invitations sont envoy\u00e9es, la communication est lanc\u00e9e. Cette deadline devient alors le point de d\u00e9part de toute la planification. On travaille \u00ab\u00a0\u00e0 l&rsquo;envers\u00a0\u00bb : que faut-il faire la semaine pr\u00e9c\u00e9dente ? Le mois d&rsquo;avant ? Deux mois avant ?<\/p>\n\n\n\n<p>Pour visualiser ce type de planning, on utilise g\u00e9n\u00e9ralement un <strong>diagramme de Gantt<\/strong> ou <strong>PERT<\/strong>, qui permet de voir clairement l&rsquo;encha\u00eenement des t\u00e2ches depuis la date butoir.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter\"><img decoding=\"async\" width=\"528\" height=\"161\" src=\"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2024\/06\/article-20-06-24-retroplanning-plan-de-travail-1-plan-de-travail-1-copie-2-528x161.jpg\" alt=\"Illustration des deadlines\" class=\"wp-image-11735\" srcset=\"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2024\/06\/article-20-06-24-retroplanning-plan-de-travail-1-plan-de-travail-1-copie-2-528x161.jpg 528w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2024\/06\/article-20-06-24-retroplanning-plan-de-travail-1-plan-de-travail-1-copie-2-768x234.jpg 768w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2024\/06\/article-20-06-24-retroplanning-plan-de-travail-1-plan-de-travail-1-copie-2-1536x468.jpg 1536w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2024\/06\/article-20-06-24-retroplanning-plan-de-travail-1-plan-de-travail-1-copie-2-2048x624.jpg 2048w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2024\/06\/article-20-06-24-retroplanning-plan-de-travail-1-plan-de-travail-1-copie-2-640x195.jpg 640w\" sizes=\"(max-width: 528px) 100vw, 528px\" loading=\"lazy\" \/><\/figure><\/div>\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"quelles-grandes-etapes-pour-construire-un-retro-planning-projet\"><\/span>Quelles grandes \u00e9tapes pour construire un r\u00e9tro planning projet ?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>Faire un r\u00e9troplanning peut prendre du temps la premi\u00e8re fois qu&rsquo;il est mise en place. Et comme beaucoup de choses en management et plus pr\u00e9cis\u00e9ment en <a href=\"https:\/\/bubbleplan.net\/blog\/statuts-business\/\">conduite de projet<\/a>, voici quelque<strong> r\u00e8gles \u00e0 respecter<\/strong>.<\/p>\n\n\n\n<p>Il y a donc des \u00e9tapes \u00e0 respecter pour le construire efficacement et avoir le meilleur r\u00e9sultat.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">1 \/ Identifier l\u2019ensemble des t\u00e2ches, actions, op\u00e9rations qui int\u00e8grent le projet<\/h3>\n\n\n\n<p>Il convient si possible d\u2019\u00eatre assez pr\u00e9cis et \u00e9ventuellement de les hi\u00e9rarchiser. On peut, si souhait\u00e9, s\u2019appuyer sur la <a href=\"https:\/\/bubbleplan.net\/blog\/wbs-methode-gestion-de-projet\/\">m\u00e9thode WBS<\/a>&nbsp;pour orchestrer cette \u00e9tape.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">2\/ D\u00e9finir les responsables et participants aux t\u00e2ches<\/h3>\n\n\n\n<p>Cela peut \u00eatre l\u2019occasion d\u2019\u00e9tablir une <a href=\"https:\/\/bubbleplan.net\/blog\/matrice-raci\/\">matrice RACI<\/a> pour un projet de retroplanning simple, tr\u00e8s pr\u00e9cis dans le suivi de l\u2019activit\u00e9 et pour de meilleurs r\u00e9sultats.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">3\/ Faire l\u2019estimation de la dur\u00e9e de chacune des t\u00e2ches list\u00e9es<\/h3>\n\n\n\n<p>C\u2019est important pour cette approche car cela va conditionner l\u2019encha\u00eenement futur.<\/p>\n\n\n\n<p>Cette \u00e9tape peut \u00e9galement impliquer des notions de budget projet. Le temps ayant une importance sur le co\u00fbt, il est essentiel de respecter la date fix\u00e9e. Mais aussi de ressources, puisque la disponibilit\u00e9 des uns et des autres (pilot\u00e9e par le chef de projet) en d\u00e9pendra.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">4\/ Identifier et fixer la date de fin du projet<\/h3>\n\n\n\n<p>Elle doit \u00eatre certaine, v\u00e9rifi\u00e9e, clairement expos\u00e9e et visible sur le calendrier du projet.<br>Elle repr\u00e9sente l\u2019\u00e9tape cl\u00e9 car c\u2019est \u00e0 partir d\u2019elle que la mod\u00e9lisation de r\u00e9troplanning va se faire.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">5\/ Organiser l\u2019ensemble des t\u00e2ches et \u00e9v\u00e9nements en partant de la date finale<\/h3>\n\n\n\n<p>Si on peut int\u00e9grer l\u2019interd\u00e9pendance des t\u00e2ches entre elles, cela sera toujours un plus pour la gestion d&rsquo;activit\u00e9s au quotidien.<\/p>\n\n\n\n<p>Cette solution permettra de r\u00e9percuter de mani\u00e8re automatique les al\u00e9as \u00e9ventuels, souvent des retards. On suit ainsi la chronologie et on sait quand faire quoi \u00e0 partir de l\u00e0.<\/p>\n\n\n\n<p>Dans cette \u00e9tape, on peut s\u2019appuyer sur la m\u00e9thode <a href=\"https:\/\/bubbleplan.net\/blog\/trouver-chemin-critique-projet-diagramme-pert-methode\/\">&nbsp;PERT<\/a> et pourquoi pas, en d\u00e9duire les incidences, comme le chemin critique. L&rsquo;<a href=\"https:\/\/bubbleplan.net\/blog\/logiciels-diagramme-de-gantt\/\">utilisation du&nbsp; Gantt<\/a> est \u00e9galement possible.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">6\/ Mettre en forme le r\u00e9troplanning projet<\/h3>\n\n\n\n<p>Derni\u00e8re \u00e9tape majeure : on va organiser toutes ses informations sur un logiciel retroplanning, dans l\u2019id\u00e9al de mani\u00e8re graphique. C\u2019est le bon moment pour sortir son <a href=\"https:\/\/bubbleplan.net\/blog\/5-avantages-planification-gantt\/\">diagramme de Gantt<\/a> par exemple.<\/p>\n\n\n\n<p>Il permettra de repr\u00e9senter de mani\u00e8re tr\u00e8s pr\u00e9cise l\u2019encha\u00eenement du projet, mais aussi les appartenances, les attributions et les contraintes.<\/p>\n\n\n\n<p>Si la logique de construction s\u2019est faite \u00e0 l\u2019inverse, le <a href=\"https:\/\/bubbleplan.net\/blog\/gp-qualites-chef-de-projet\/\">chef de projet<\/a> suivra l\u2019avancement et la r\u00e9alisation dans le d\u00e9roul\u00e9 chronologique.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter\"><img decoding=\"async\" width=\"528\" height=\"471\" src=\"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2024\/06\/article-20-06-24-retroplanning-plan-de-travail-1-plan-de-travail-1-copie-3-528x471.jpg\" alt=\"Illustration interface Bubble Plan\" class=\"wp-image-11736\" srcset=\"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2024\/06\/article-20-06-24-retroplanning-plan-de-travail-1-plan-de-travail-1-copie-3-528x471.jpg 528w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2024\/06\/article-20-06-24-retroplanning-plan-de-travail-1-plan-de-travail-1-copie-3-768x685.jpg 768w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2024\/06\/article-20-06-24-retroplanning-plan-de-travail-1-plan-de-travail-1-copie-3-1536x1370.jpg 1536w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2024\/06\/article-20-06-24-retroplanning-plan-de-travail-1-plan-de-travail-1-copie-3-640x571.jpg 640w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2024\/06\/article-20-06-24-retroplanning-plan-de-travail-1-plan-de-travail-1-copie-3.jpg 1952w\" sizes=\"(max-width: 528px) 100vw, 528px\" loading=\"lazy\" \/><\/figure><\/div>\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"quand-privilegier-la-retro-planification\"><\/span>Quand privil\u00e9gier la r\u00e9tro-planification ?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>Quand on conna\u00eet l\u2019ensemble des \u00e9l\u00e9ments menant \u00e0 l\u2019<strong>\u00e9v\u00e9nement final du projet<\/strong>, surtout si cette date est&nbsp;<strong>obligatoire<\/strong>, on pourra choisir cette m\u00e9thode de planification inverse de gestion de projet.<br>On d\u00e9finira ainsi la date de d\u00e9but en orchestrant le projet \u00e0 rebours depuis la livraison, le point de contr\u00f4le, l\u2019\u00e9v\u00e9nement.<\/p>\n\n\n\n<p>En gestion de projet, le r\u00e9troplanning est particuli\u00e8rement recommand\u00e9 lorsque la date finale correspond \u00e0 un engagement contractuel ou strat\u00e9gique, dont le non-respect pourrait impacter la performance commerciale ou l\u2019image de l\u2019entreprise.<\/p>\n\n\n\n<p>Bien entendu, cela fonctionne avec toute date imp\u00e9rative, on peut donc envisager un r\u00e9tro planning, qui s\u2019\u00e9tablit sur chaque partie du projet, en amont de celle-ci, sans qu\u2019elle soit finale en d\u00e9finitive.<\/p>\n\n\n\n<p>\u00c9v\u00e9nementiel, appel d\u2019offres, <a href=\"https:\/\/bubblemeeting.net\/blog\/strategie-de-lancement-de-produit-comment-faire\/\" target=\"_blank\" rel=\"noreferrer noopener\">lancement produit<\/a>, \u2026 De nombreux secteurs se pr\u00eatent parfaitement \u00e0 cette approche. Notamment ceux qui ont une activit\u00e9 dans le <a href=\"https:\/\/bubbleplan.net\/outil-gestion\/plan-marketing\">marketing<\/a>, les chantiers, \u2026<\/p>\n\n\n\n<p>Il faudra alors choisir les bons outils pour le mettre en place. En effet, les avantages du r\u00e9troplanning r\u00e9sident essentiellement dans la capacit\u00e9 \u00e0 raisonner \u00e0 l&rsquo;inverse. Cette m\u00e9thode permet aussi une meilleure anticipation des risques. Elle optimise l&rsquo;allocation des ressources. Les \u00e9quipes sont moins stress\u00e9es car elles savent exactement quoi livrer et quand. Surtout, elle garantit le respect des \u00e9ch\u00e9ances critiques.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"bubble-plan-un-outil-de-retroplanning-automatique\"><\/span>Bubble Plan : un outil de r\u00e9troplanning automatique<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>Bubble Plan permet de cr\u00e9er un r\u00e9troplanning en quelques clics en fixant simplement la date finale. Les d\u00e9pendances entre t\u00e2ches sont recalcul\u00e9es automatiquement et le chemin critique est mis en \u00e9vidence. Vous visualisez imm\u00e9diatement l\u2019impact d\u2019un d\u00e9calage sur l\u2019ensemble du projet.<\/p>\n\n\n\n<p>Chez Bubble Plan, la planification constitue le c\u0153ur de notre outil collaboratif. Tout a \u00e9t\u00e9 con\u00e7u pour cr\u00e9er facilement vos plannings de projet en ligne, en quelques clics seulement. Nous avons pens\u00e9 \u00e0 tout pour vous faciliter la vie et notamment dans le cadre du fonctionnement des projets <strong>\u00e0 partir d&rsquo;un mod\u00e8le<\/strong>.<\/p>\n\n\n\n<p>Vous pouvez facilement :<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>repartir d\u2019un projet type,<\/li>\n\n\n\n<li>vous caler sur la date finale,<\/li>\n\n\n\n<li>et la placer de mani\u00e8re d\u00e9finitive.<\/li>\n<\/ul>\n\n\n\n<p>Tout cela en appliquant de mani\u00e8re automatique le d\u00e9calage en amont des diff\u00e9rentes phases (bulles). Un projet de <strong>r\u00e9troplanning finalis\u00e9 en 2 clics<\/strong>, sur votre outil en ligne, qui pourra m\u00eame prendre en compte votre <a href=\"https:\/\/bubbleplan.net\/blog\/chemin-critique-gestion-de-projet-experte-sous-bubble-plan\/\">chemin critique<\/a>.<\/p>\n\n\n\n<p>Cela n\u2019a de sens que si vous avez \u00e9tabli des <strong>liaisons et&nbsp;des&nbsp;contraintes<\/strong>&nbsp;entre vos \u00e9l\u00e9ments. Sinon, aucun outil de gestion de projet ne sera en mesure d\u2019organiser d\u2019un geste votre nouveau <a href=\"https:\/\/bubbleplan.net\/outil-gestion\/planning-edition\">planning<\/a>.<\/p>\n\n\n\n<p>Le plus simple pour comprendre le fonctionnement est d\u2019aller sur <a href=\"https:\/\/bubbleplan.net\/outil-planification\">notre logiciel de planification<\/a>, et de voir par l\u2019exemple, le r\u00e9troplanning qui sera mis en place, \u00e0 partir d\u2019un mod\u00e8le structur\u00e9.<\/p>\n\n\n\n<p>Gr\u00e2ce \u00e0 sa fonctionnalit\u00e9 versioning, vous pourrez voir les \u00e9volutions et consulter une version ant\u00e9rieure de votre plan.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"conclusion-sur-le-retro-planning-projet\"><\/span>Conclusion sur le r\u00e9tro planning projet<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter\"><img decoding=\"async\" width=\"528\" height=\"471\" src=\"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2024\/06\/article-20-06-24-retroplanning-plan-de-travail-1-plan-de-travail-1-copie-4-528x471.jpg\" alt=\"Illustration de l'interface de Bubble Plan\" class=\"wp-image-11737\" srcset=\"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2024\/06\/article-20-06-24-retroplanning-plan-de-travail-1-plan-de-travail-1-copie-4-528x471.jpg 528w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2024\/06\/article-20-06-24-retroplanning-plan-de-travail-1-plan-de-travail-1-copie-4-768x685.jpg 768w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2024\/06\/article-20-06-24-retroplanning-plan-de-travail-1-plan-de-travail-1-copie-4-1536x1370.jpg 1536w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2024\/06\/article-20-06-24-retroplanning-plan-de-travail-1-plan-de-travail-1-copie-4-640x571.jpg 640w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2024\/06\/article-20-06-24-retroplanning-plan-de-travail-1-plan-de-travail-1-copie-4.jpg 1952w\" sizes=\"(max-width: 528px) 100vw, 528px\" loading=\"lazy\" \/><\/figure><\/div>\n\n\n<p>Le r\u00e9troplanning s&rsquo;impose comme une m\u00e9thode incontournable pour tous les projets avec des \u00e9ch\u00e9ances fixes. Que ce soit en marketing, construction, communication ou distribution, cette approche garantit le respect des d\u00e9lais de livraison.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><a href=\"https:\/\/bubbleplan.net\/creer-un-compte-gratuit\"><img decoding=\"async\" width=\"2560\" height=\"424\" src=\"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bas-de-page-1.png\" alt=\"appel \u00e0 l'action avec un texte \u00e0 gauche, et un bouton vert \u00e0 droite\" class=\"wp-image-14861\" srcset=\"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bas-de-page-1.png 2560w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bas-de-page-1-528x87.png 528w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bas-de-page-1-768x127.png 768w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bas-de-page-1-1536x254.png 1536w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bas-de-page-1-2048x339.png 2048w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bas-de-page-1-440x73.png 440w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bas-de-page-1-320x53.png 320w, https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/09\/cta-bas-de-page-1-1400x232.png 1400w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" loading=\"lazy\" \/><\/a><\/figure>\n\n\n\n<p>Avec les bons outils et une compr\u00e9hension claire des d\u00e9pendances entre t\u00e2ches, le <strong>r\u00e9troplanning en ligne<\/strong> devient un atout majeur pour organiser efficacement vos projets.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"faq\"><\/span>FAQ<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-1 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:100%\">\n<div class=\"schema-faq wp-block-yoast-faq-block\"><div class=\"schema-faq-section\" id=\"faq-question-1758117637228\"><strong class=\"schema-faq-question\">Quel outil pour faire un r\u00e9troplanning ?<\/strong> <p class=\"schema-faq-answer\">Un logiciel de gestion de projet avec diagramme de Gantt et gestion des d\u00e9pendances permet d\u2019automatiser le recalcul des t\u00e2ches.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1758117963275\"><strong class=\"schema-faq-question\">Quelle est la diff\u00e9rence entre un planning et un r\u00e9troplanning ?<\/strong> <p class=\"schema-faq-answer\">L&rsquo;approche classique part de la date de d\u00e9but vers la date de fin, tandis que le r\u00e9troplanning part de la date de livraison finale et remonte vers le d\u00e9but du projet. Le r\u00e9troplanning garantit le respect des \u00e9ch\u00e9ances.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1758117979837\"><strong class=\"schema-faq-question\">Quel est le meilleur outil ?<\/strong> <p class=\"schema-faq-answer\">Bubble Plan excelle gr\u00e2ce \u00e0 ses fonctionnalit\u00e9s vari\u00e9es : cr\u00e9ation en 2 clics et recalcul automatique des d\u00e9pendances. N&rsquo;h\u00e9sitez pas n\u00e9anmoins \u00e0 tester (gratuitement quand c&rsquo;est possible) et comparer avec d&rsquo;autres outils pour choisir l&rsquo;outil et l&rsquo;offre qui vous convient le mieux.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1758117993925\"><strong class=\"schema-faq-question\">Quels sont les trois types de planification ?<\/strong> <p class=\"schema-faq-answer\">La planification op\u00e9rationnelle (court terme), la planification tactique (moyen terme) et la planification strat\u00e9gique (long terme). Chacune r\u00e9pond \u00e0 des objectifs et horizons temporels diff\u00e9rents.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1758118009818\"><strong class=\"schema-faq-question\">Peut-on faire un r\u00e9troplanning sur Excel ?<\/strong> <p class=\"schema-faq-answer\">Oui, mais sans automatisation des d\u00e9pendances, chaque modification n\u00e9cessite un ajustement manuel.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1758118041223\"><strong class=\"schema-faq-question\">Comment faire un r\u00e9troplanning \u00e9tape par \u00e9tape ?<\/strong> <p class=\"schema-faq-answer\">1 &#8211; <strong>D\u00e9finissez la date de livraison finale<\/strong> : point de d\u00e9part non n\u00e9gociable<br\/>2 &#8211; <strong>Listez toutes les t\u00e2ches n\u00e9cessaires<\/strong> : du plus g\u00e9n\u00e9ral au plus d\u00e9taill\u00e9<br\/>3 &#8211; <strong>Estimez la dur\u00e9e de chaque t\u00e2che<\/strong> : soyez r\u00e9aliste dans vos estimations<br\/>4 &#8211; <strong>Identifiez les d\u00e9pendances<\/strong>\u00a0 : quelles t\u00e2ches doivent \u00eatre termin\u00e9es avant d&rsquo;autres<br\/>5 &#8211; <strong>Placez les t\u00e2ches en remontant<\/strong> : de la date de fin vers le d\u00e9but<br\/>6 &#8211; <strong>V\u00e9rifiez le chemin critique<\/strong> : identifiez les t\u00e2ches qui ne peuvent pas \u00eatre retard\u00e9es<br\/>7 &#8211; <strong>Ajustez si n\u00e9cessaire<\/strong> : optimisez les d\u00e9lais et ressources<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1771864730297\"><strong class=\"schema-faq-question\">Quelle diff\u00e9rence entre r\u00e9troplanning et planning ?<\/strong> <p class=\"schema-faq-answer\">Le planning classique part de la date de d\u00e9but. Le r\u00e9troplanning part de la date de fin.<\/p> <\/div> <\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Un outil r\u00e9troplanning permet de construire un planning en partant de la date de livraison finale pour organiser l\u2019ensemble des t\u00e2ches \u00e0 rebours. Contrairement \u00e0 un planning classique, la date de fin est fixe et non n\u00e9gociable. Toutes les \u00e9tapes du projet sont alors positionn\u00e9es en fonction de cette \u00e9ch\u00e9ance. Dans cet article, vous allez&#8230;<\/p>\n","protected":false},"author":2,"featured_media":13708,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[631],"tags":[40,52,466],"class_list":{"0":"post-5403","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","6":"hentry","7":"category-autres-methodes","8":"tag-planification","9":"tag-gestion-de-projet","10":"tag-retroplanning","11":"article","12":"","14":"has-excerpt","15":"has-avatar","16":"has-author","17":"has-nickname","18":"has-date","19":"has-comment-count","20":"has-category-meta","21":"has-read-more","22":"has-title","23":"has-post-media","24":"thumbnail-"},"nelio_content":{"isAutoShareEnabled":true,"autoShareEndMode":"never","automationSources":{"useCustomSentences":false,"customSentences":[]},"followers":[2,11,1,14],"suggestedReferences":[],"efiUrl":"","efiAlt":"","highlights":[],"permalinkQueryArgs":[],"series":[]},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Comment faire un r\u00e9troplanning ? 6 \u00e9tapes cl\u00e9s et l\u2019outil n\u00e9cessaire<\/title>\n<meta name=\"description\" content=\"D\u00e9couvrez les 6 \u00e9tapes cl\u00e9s pour structurer votre projet gr\u00e2ce \u00e0 un outil r\u00e9troplanning et optimiser votre gestion en toute simplicit\u00e9.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Comment faire un r\u00e9troplanning ? 6 \u00e9tapes cl\u00e9s et l\u2019outil n\u00e9cessaire\" \/>\n<meta property=\"og:description\" content=\"D\u00e9couvrez les 6 \u00e9tapes cl\u00e9s pour structurer votre projet gr\u00e2ce \u00e0 un outil r\u00e9troplanning et optimiser votre gestion en toute simplicit\u00e9.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/\" \/>\n<meta property=\"og:site_name\" content=\"Bubble Plan : blog de la Gestion de Projet efficace et collaborative\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/bubbleplan\" \/>\n<meta property=\"article:published_time\" content=\"2026-02-23T16:39:32+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-22T09:03:32+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/04\/outil-retroplanning-projet-pourquoi-et-comment-le-realiser-simplement.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"800\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Gr\u00e9gory Hennion\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@BubblePlan\" \/>\n<meta name=\"twitter:site\" content=\"@BubblePlan\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"Gr\u00e9gory Hennion\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"14 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/\"},\"author\":{\"name\":\"Gr\u00e9gory Hennion\",\"@id\":\"https:\/\/bubbleplan.net\/blog\/#\/schema\/person\/6c4462762ae97fb6382693f1b5312a48\"},\"headline\":\"Outil r\u00e9troplanning projet : comment cr\u00e9er un r\u00e9troplanning projet en ligne (logiciel)\",\"datePublished\":\"2026-02-23T16:39:32+00:00\",\"dateModified\":\"2026-05-22T09:03:32+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/\"},\"wordCount\":2747,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/bubbleplan.net\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/04\/outil-retroplanning-projet-pourquoi-et-comment-le-realiser-simplement.jpg\",\"keywords\":[\"Planification\",\"gestion de projet\",\"r\u00e9troplanning\"],\"articleSection\":[\"Autres m\u00e9thodes\"],\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#respond\"]}]},{\"@type\":[\"WebPage\",\"FAQPage\"],\"@id\":\"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/\",\"url\":\"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/\",\"name\":\"Comment faire un r\u00e9troplanning ? 6 \u00e9tapes cl\u00e9s et l\u2019outil n\u00e9cessaire\",\"isPartOf\":{\"@id\":\"https:\/\/bubbleplan.net\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/04\/outil-retroplanning-projet-pourquoi-et-comment-le-realiser-simplement.jpg\",\"datePublished\":\"2026-02-23T16:39:32+00:00\",\"dateModified\":\"2026-05-22T09:03:32+00:00\",\"description\":\"D\u00e9couvrez les 6 \u00e9tapes cl\u00e9s pour structurer votre projet gr\u00e2ce \u00e0 un outil r\u00e9troplanning et optimiser votre gestion en toute simplicit\u00e9.\",\"breadcrumb\":{\"@id\":\"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#breadcrumb\"},\"mainEntity\":[{\"@id\":\"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#faq-question-1758117637228\"},{\"@id\":\"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#faq-question-1758117963275\"},{\"@id\":\"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#faq-question-1758117979837\"},{\"@id\":\"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#faq-question-1758117993925\"},{\"@id\":\"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#faq-question-1758118009818\"},{\"@id\":\"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#faq-question-1758118041223\"},{\"@id\":\"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#faq-question-1771864730297\"}],\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#primaryimage\",\"url\":\"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/04\/outil-retroplanning-projet-pourquoi-et-comment-le-realiser-simplement.jpg\",\"contentUrl\":\"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/04\/outil-retroplanning-projet-pourquoi-et-comment-le-realiser-simplement.jpg\",\"width\":1200,\"height\":800,\"caption\":\"Outil r\u00e9troplanning projet pourquoi et comment le r\u00e9aliser simplement\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Blog\",\"item\":\"https:\/\/bubbleplan.net\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"M\u00e9thodes\",\"item\":\"https:\/\/bubbleplan.net\/blog\/category\/methodes\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Autres m\u00e9thodes\",\"item\":\"https:\/\/bubbleplan.net\/blog\/category\/methodes\/autres-methodes\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"Outil r\u00e9troplanning projet : comment cr\u00e9er un r\u00e9troplanning projet en ligne (logiciel)\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/bubbleplan.net\/blog\/#website\",\"url\":\"https:\/\/bubbleplan.net\/blog\/\",\"name\":\"Bubble Plan : blog de la Gestion de Projet efficace et collaborative\",\"description\":\"Toute l&#039;actualit\u00e9 de la gestion de projet et du collaboratif, avec Bubble Plan\",\"publisher\":{\"@id\":\"https:\/\/bubbleplan.net\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/bubbleplan.net\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/bubbleplan.net\/blog\/#organization\",\"name\":\"Bubble Plan\",\"url\":\"https:\/\/bubbleplan.net\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/bubbleplan.net\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2024\/07\/logo-leblog-vf-01-336.png\",\"contentUrl\":\"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2024\/07\/logo-leblog-vf-01-336.png\",\"width\":672,\"height\":62,\"caption\":\"Bubble Plan\"},\"image\":{\"@id\":\"https:\/\/bubbleplan.net\/blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/bubbleplan\",\"https:\/\/x.com\/BubblePlan\",\"https:\/\/www.linkedin.com\/company\/bubbleplan\",\"https:\/\/www.youtube.com\/channel\/UCDb4feDzsa4fCd_vR5HZJgg\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/bubbleplan.net\/blog\/#\/schema\/person\/6c4462762ae97fb6382693f1b5312a48\",\"name\":\"Gr\u00e9gory Hennion\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/bubbleplan.net\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/c42e72a19ab0d910c5a805ee5fa51347?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/c42e72a19ab0d910c5a805ee5fa51347?s=96&d=mm&r=g\",\"caption\":\"Gr\u00e9gory Hennion\"},\"description\":\"Expert gestion de projet, Gr\u00e9gory \u00e9crit pour le blog de Bubble Plan depuis 2017. Expert produit, passionn\u00e9 par les mots et l\u2019\u00e9criture, il vous partage des articles riches de sens, nourris par des ann\u00e9es d\u2019exp\u00e9rience terrain. Vous pouvez suivre son actualit\u00e9 sur LinkedIn.\",\"sameAs\":[\"https:\/\/www.linkedin.com\/in\/greg-hennion-active-networker\/\"],\"url\":\"https:\/\/bubbleplan.net\/blog\/author\/gregory\/\"},{\"@type\":\"Question\",\"@id\":\"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#faq-question-1758117637228\",\"position\":1,\"url\":\"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#faq-question-1758117637228\",\"name\":\"Quel outil pour faire un r\u00e9troplanning ?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Un logiciel de gestion de projet avec diagramme de Gantt et gestion des d\u00e9pendances permet d\u2019automatiser le recalcul des t\u00e2ches.\",\"inLanguage\":\"fr-FR\"},\"inLanguage\":\"fr-FR\"},{\"@type\":\"Question\",\"@id\":\"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#faq-question-1758117963275\",\"position\":2,\"url\":\"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#faq-question-1758117963275\",\"name\":\"Quelle est la diff\u00e9rence entre un planning et un r\u00e9troplanning ?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"L'approche classique part de la date de d\u00e9but vers la date de fin, tandis que le r\u00e9troplanning part de la date de livraison finale et remonte vers le d\u00e9but du projet. Le r\u00e9troplanning garantit le respect des \u00e9ch\u00e9ances.\",\"inLanguage\":\"fr-FR\"},\"inLanguage\":\"fr-FR\"},{\"@type\":\"Question\",\"@id\":\"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#faq-question-1758117979837\",\"position\":3,\"url\":\"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#faq-question-1758117979837\",\"name\":\"Quel est le meilleur outil ?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Bubble Plan excelle gr\u00e2ce \u00e0 ses fonctionnalit\u00e9s vari\u00e9es : cr\u00e9ation en 2 clics et recalcul automatique des d\u00e9pendances. N'h\u00e9sitez pas n\u00e9anmoins \u00e0 tester (gratuitement quand c'est possible) et comparer avec d'autres outils pour choisir l'outil et l'offre qui vous convient le mieux.\",\"inLanguage\":\"fr-FR\"},\"inLanguage\":\"fr-FR\"},{\"@type\":\"Question\",\"@id\":\"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#faq-question-1758117993925\",\"position\":4,\"url\":\"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#faq-question-1758117993925\",\"name\":\"Quels sont les trois types de planification ?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"La planification op\u00e9rationnelle (court terme), la planification tactique (moyen terme) et la planification strat\u00e9gique (long terme). Chacune r\u00e9pond \u00e0 des objectifs et horizons temporels diff\u00e9rents.\",\"inLanguage\":\"fr-FR\"},\"inLanguage\":\"fr-FR\"},{\"@type\":\"Question\",\"@id\":\"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#faq-question-1758118009818\",\"position\":5,\"url\":\"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#faq-question-1758118009818\",\"name\":\"Peut-on faire un r\u00e9troplanning sur Excel ?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Oui, mais sans automatisation des d\u00e9pendances, chaque modification n\u00e9cessite un ajustement manuel.\",\"inLanguage\":\"fr-FR\"},\"inLanguage\":\"fr-FR\"},{\"@type\":\"Question\",\"@id\":\"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#faq-question-1758118041223\",\"position\":6,\"url\":\"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#faq-question-1758118041223\",\"name\":\"Comment faire un r\u00e9troplanning \u00e9tape par \u00e9tape ?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"1 - <strong>D\u00e9finissez la date de livraison finale<\/strong> : point de d\u00e9part non n\u00e9gociable<br\/>2 - <strong>Listez toutes les t\u00e2ches n\u00e9cessaires<\/strong> : du plus g\u00e9n\u00e9ral au plus d\u00e9taill\u00e9<br\/>3 - <strong>Estimez la dur\u00e9e de chaque t\u00e2che<\/strong> : soyez r\u00e9aliste dans vos estimations<br\/>4 - <strong>Identifiez les d\u00e9pendances<\/strong>\u00a0 : quelles t\u00e2ches doivent \u00eatre termin\u00e9es avant d'autres<br\/>5 - <strong>Placez les t\u00e2ches en remontant<\/strong> : de la date de fin vers le d\u00e9but<br\/>6 - <strong>V\u00e9rifiez le chemin critique<\/strong> : identifiez les t\u00e2ches qui ne peuvent pas \u00eatre retard\u00e9es<br\/>7 - <strong>Ajustez si n\u00e9cessaire<\/strong> : optimisez les d\u00e9lais et ressources\",\"inLanguage\":\"fr-FR\"},\"inLanguage\":\"fr-FR\"},{\"@type\":\"Question\",\"@id\":\"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#faq-question-1771864730297\",\"position\":7,\"url\":\"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#faq-question-1771864730297\",\"name\":\"Quelle diff\u00e9rence entre r\u00e9troplanning et planning ?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Le planning classique part de la date de d\u00e9but. Le r\u00e9troplanning part de la date de fin.\",\"inLanguage\":\"fr-FR\"},\"inLanguage\":\"fr-FR\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Comment faire un r\u00e9troplanning ? 6 \u00e9tapes cl\u00e9s et l\u2019outil n\u00e9cessaire","description":"D\u00e9couvrez les 6 \u00e9tapes cl\u00e9s pour structurer votre projet gr\u00e2ce \u00e0 un outil r\u00e9troplanning et optimiser votre gestion en toute simplicit\u00e9.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/","og_locale":"fr_FR","og_type":"article","og_title":"Comment faire un r\u00e9troplanning ? 6 \u00e9tapes cl\u00e9s et l\u2019outil n\u00e9cessaire","og_description":"D\u00e9couvrez les 6 \u00e9tapes cl\u00e9s pour structurer votre projet gr\u00e2ce \u00e0 un outil r\u00e9troplanning et optimiser votre gestion en toute simplicit\u00e9.","og_url":"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/","og_site_name":"Bubble Plan : blog de la Gestion de Projet efficace et collaborative","article_publisher":"https:\/\/www.facebook.com\/bubbleplan","article_published_time":"2026-02-23T16:39:32+00:00","article_modified_time":"2026-05-22T09:03:32+00:00","og_image":[{"width":1200,"height":800,"url":"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/04\/outil-retroplanning-projet-pourquoi-et-comment-le-realiser-simplement.jpg","type":"image\/jpeg"}],"author":"Gr\u00e9gory Hennion","twitter_card":"summary_large_image","twitter_creator":"@BubblePlan","twitter_site":"@BubblePlan","twitter_misc":{"\u00c9crit par":"Gr\u00e9gory Hennion","Dur\u00e9e de lecture estim\u00e9e":"14 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#article","isPartOf":{"@id":"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/"},"author":{"name":"Gr\u00e9gory Hennion","@id":"https:\/\/bubbleplan.net\/blog\/#\/schema\/person\/6c4462762ae97fb6382693f1b5312a48"},"headline":"Outil r\u00e9troplanning projet : comment cr\u00e9er un r\u00e9troplanning projet en ligne (logiciel)","datePublished":"2026-02-23T16:39:32+00:00","dateModified":"2026-05-22T09:03:32+00:00","mainEntityOfPage":{"@id":"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/"},"wordCount":2747,"commentCount":0,"publisher":{"@id":"https:\/\/bubbleplan.net\/blog\/#organization"},"image":{"@id":"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#primaryimage"},"thumbnailUrl":"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/04\/outil-retroplanning-projet-pourquoi-et-comment-le-realiser-simplement.jpg","keywords":["Planification","gestion de projet","r\u00e9troplanning"],"articleSection":["Autres m\u00e9thodes"],"inLanguage":"fr-FR","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#respond"]}]},{"@type":["WebPage","FAQPage"],"@id":"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/","url":"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/","name":"Comment faire un r\u00e9troplanning ? 6 \u00e9tapes cl\u00e9s et l\u2019outil n\u00e9cessaire","isPartOf":{"@id":"https:\/\/bubbleplan.net\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#primaryimage"},"image":{"@id":"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#primaryimage"},"thumbnailUrl":"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/04\/outil-retroplanning-projet-pourquoi-et-comment-le-realiser-simplement.jpg","datePublished":"2026-02-23T16:39:32+00:00","dateModified":"2026-05-22T09:03:32+00:00","description":"D\u00e9couvrez les 6 \u00e9tapes cl\u00e9s pour structurer votre projet gr\u00e2ce \u00e0 un outil r\u00e9troplanning et optimiser votre gestion en toute simplicit\u00e9.","breadcrumb":{"@id":"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#breadcrumb"},"mainEntity":[{"@id":"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#faq-question-1758117637228"},{"@id":"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#faq-question-1758117963275"},{"@id":"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#faq-question-1758117979837"},{"@id":"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#faq-question-1758117993925"},{"@id":"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#faq-question-1758118009818"},{"@id":"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#faq-question-1758118041223"},{"@id":"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#faq-question-1771864730297"}],"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#primaryimage","url":"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/04\/outil-retroplanning-projet-pourquoi-et-comment-le-realiser-simplement.jpg","contentUrl":"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2025\/04\/outil-retroplanning-projet-pourquoi-et-comment-le-realiser-simplement.jpg","width":1200,"height":800,"caption":"Outil r\u00e9troplanning projet pourquoi et comment le r\u00e9aliser simplement"},{"@type":"BreadcrumbList","@id":"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Blog","item":"https:\/\/bubbleplan.net\/blog\/"},{"@type":"ListItem","position":2,"name":"M\u00e9thodes","item":"https:\/\/bubbleplan.net\/blog\/category\/methodes\/"},{"@type":"ListItem","position":3,"name":"Autres m\u00e9thodes","item":"https:\/\/bubbleplan.net\/blog\/category\/methodes\/autres-methodes\/"},{"@type":"ListItem","position":4,"name":"Outil r\u00e9troplanning projet : comment cr\u00e9er un r\u00e9troplanning projet en ligne (logiciel)"}]},{"@type":"WebSite","@id":"https:\/\/bubbleplan.net\/blog\/#website","url":"https:\/\/bubbleplan.net\/blog\/","name":"Bubble Plan : blog de la Gestion de Projet efficace et collaborative","description":"Toute l&#039;actualit\u00e9 de la gestion de projet et du collaboratif, avec Bubble Plan","publisher":{"@id":"https:\/\/bubbleplan.net\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/bubbleplan.net\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/bubbleplan.net\/blog\/#organization","name":"Bubble Plan","url":"https:\/\/bubbleplan.net\/blog\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/bubbleplan.net\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2024\/07\/logo-leblog-vf-01-336.png","contentUrl":"https:\/\/bubbleplan.net\/blog\/wp-content\/uploads\/2024\/07\/logo-leblog-vf-01-336.png","width":672,"height":62,"caption":"Bubble Plan"},"image":{"@id":"https:\/\/bubbleplan.net\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/bubbleplan","https:\/\/x.com\/BubblePlan","https:\/\/www.linkedin.com\/company\/bubbleplan","https:\/\/www.youtube.com\/channel\/UCDb4feDzsa4fCd_vR5HZJgg"]},{"@type":"Person","@id":"https:\/\/bubbleplan.net\/blog\/#\/schema\/person\/6c4462762ae97fb6382693f1b5312a48","name":"Gr\u00e9gory Hennion","image":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/bubbleplan.net\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/c42e72a19ab0d910c5a805ee5fa51347?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c42e72a19ab0d910c5a805ee5fa51347?s=96&d=mm&r=g","caption":"Gr\u00e9gory Hennion"},"description":"Expert gestion de projet, Gr\u00e9gory \u00e9crit pour le blog de Bubble Plan depuis 2017. Expert produit, passionn\u00e9 par les mots et l\u2019\u00e9criture, il vous partage des articles riches de sens, nourris par des ann\u00e9es d\u2019exp\u00e9rience terrain. Vous pouvez suivre son actualit\u00e9 sur LinkedIn.","sameAs":["https:\/\/www.linkedin.com\/in\/greg-hennion-active-networker\/"],"url":"https:\/\/bubbleplan.net\/blog\/author\/gregory\/"},{"@type":"Question","@id":"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#faq-question-1758117637228","position":1,"url":"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#faq-question-1758117637228","name":"Quel outil pour faire un r\u00e9troplanning ?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"Un logiciel de gestion de projet avec diagramme de Gantt et gestion des d\u00e9pendances permet d\u2019automatiser le recalcul des t\u00e2ches.","inLanguage":"fr-FR"},"inLanguage":"fr-FR"},{"@type":"Question","@id":"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#faq-question-1758117963275","position":2,"url":"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#faq-question-1758117963275","name":"Quelle est la diff\u00e9rence entre un planning et un r\u00e9troplanning ?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"L'approche classique part de la date de d\u00e9but vers la date de fin, tandis que le r\u00e9troplanning part de la date de livraison finale et remonte vers le d\u00e9but du projet. Le r\u00e9troplanning garantit le respect des \u00e9ch\u00e9ances.","inLanguage":"fr-FR"},"inLanguage":"fr-FR"},{"@type":"Question","@id":"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#faq-question-1758117979837","position":3,"url":"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#faq-question-1758117979837","name":"Quel est le meilleur outil ?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"Bubble Plan excelle gr\u00e2ce \u00e0 ses fonctionnalit\u00e9s vari\u00e9es : cr\u00e9ation en 2 clics et recalcul automatique des d\u00e9pendances. N'h\u00e9sitez pas n\u00e9anmoins \u00e0 tester (gratuitement quand c'est possible) et comparer avec d'autres outils pour choisir l'outil et l'offre qui vous convient le mieux.","inLanguage":"fr-FR"},"inLanguage":"fr-FR"},{"@type":"Question","@id":"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#faq-question-1758117993925","position":4,"url":"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#faq-question-1758117993925","name":"Quels sont les trois types de planification ?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"La planification op\u00e9rationnelle (court terme), la planification tactique (moyen terme) et la planification strat\u00e9gique (long terme). Chacune r\u00e9pond \u00e0 des objectifs et horizons temporels diff\u00e9rents.","inLanguage":"fr-FR"},"inLanguage":"fr-FR"},{"@type":"Question","@id":"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#faq-question-1758118009818","position":5,"url":"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#faq-question-1758118009818","name":"Peut-on faire un r\u00e9troplanning sur Excel ?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"Oui, mais sans automatisation des d\u00e9pendances, chaque modification n\u00e9cessite un ajustement manuel.","inLanguage":"fr-FR"},"inLanguage":"fr-FR"},{"@type":"Question","@id":"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#faq-question-1758118041223","position":6,"url":"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#faq-question-1758118041223","name":"Comment faire un r\u00e9troplanning \u00e9tape par \u00e9tape ?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"1 - <strong>D\u00e9finissez la date de livraison finale<\/strong> : point de d\u00e9part non n\u00e9gociable<br\/>2 - <strong>Listez toutes les t\u00e2ches n\u00e9cessaires<\/strong> : du plus g\u00e9n\u00e9ral au plus d\u00e9taill\u00e9<br\/>3 - <strong>Estimez la dur\u00e9e de chaque t\u00e2che<\/strong> : soyez r\u00e9aliste dans vos estimations<br\/>4 - <strong>Identifiez les d\u00e9pendances<\/strong>\u00a0 : quelles t\u00e2ches doivent \u00eatre termin\u00e9es avant d'autres<br\/>5 - <strong>Placez les t\u00e2ches en remontant<\/strong> : de la date de fin vers le d\u00e9but<br\/>6 - <strong>V\u00e9rifiez le chemin critique<\/strong> : identifiez les t\u00e2ches qui ne peuvent pas \u00eatre retard\u00e9es<br\/>7 - <strong>Ajustez si n\u00e9cessaire<\/strong> : optimisez les d\u00e9lais et ressources","inLanguage":"fr-FR"},"inLanguage":"fr-FR"},{"@type":"Question","@id":"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#faq-question-1771864730297","position":7,"url":"https:\/\/bubbleplan.net\/blog\/retroplanning-comment-le-realiser-simplement\/#faq-question-1771864730297","name":"Quelle diff\u00e9rence entre r\u00e9troplanning et planning ?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"Le planning classique part de la date de d\u00e9but. Le r\u00e9troplanning part de la date de fin.","inLanguage":"fr-FR"},"inLanguage":"fr-FR"}]}},"_links":{"self":[{"href":"https:\/\/bubbleplan.net\/blog\/wp-json\/wp\/v2\/posts\/5403","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bubbleplan.net\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bubbleplan.net\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bubbleplan.net\/blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/bubbleplan.net\/blog\/wp-json\/wp\/v2\/comments?post=5403"}],"version-history":[{"count":55,"href":"https:\/\/bubbleplan.net\/blog\/wp-json\/wp\/v2\/posts\/5403\/revisions"}],"predecessor-version":[{"id":17055,"href":"https:\/\/bubbleplan.net\/blog\/wp-json\/wp\/v2\/posts\/5403\/revisions\/17055"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/bubbleplan.net\/blog\/wp-json\/wp\/v2\/media\/13708"}],"wp:attachment":[{"href":"https:\/\/bubbleplan.net\/blog\/wp-json\/wp\/v2\/media?parent=5403"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bubbleplan.net\/blog\/wp-json\/wp\/v2\/categories?post=5403"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bubbleplan.net\/blog\/wp-json\/wp\/v2\/tags?post=5403"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}